Laserfiche WebLink
EXISTING <br />PAVEMENT <br />2 <br />2 <br />MATERIALS <br />PIPE BEDDING MATERIAL SHALL BE z <br />CRUSHED SURFACING 13ASE COURSE <br />,_ <br />CONFORMING TO SECTION 9-019(3) <br />4 <br />OF THE STANDARD SPECIFICATIONS <br />FOR ROAD, BRIDGE AND MUNICIPAL <br />CONSTRUCTION WSDOTIAPWA. <br />OVER EXCAVATION AND PLACEMENT <br />21 <br />OF FOUNDATION MATERIAL, IF <br />REQUIRED SHALL BE FOUNDAT ION <br />MATERIAL CLASS A OR B <br />CONFORMING TO SECTION 9-0317 <br />2Z, <br />OF THE STANDARD SPECIFICATIONS <br />r- FOR ROAD, BRIDGE AND MUNICIPAL W (SEE NOTEll <br />CONSTRUCTION WSDOT/APWA. <br />a <br />(n__4�T Y �Pl C �AL T �RE N �CH �SE C T �10 N� <br />SCALE: N.T.S. <br />TRENCH COMPACTION SECTION I <br />00 <br />tn <br />co <br />ca <br />C, <br />CD <br />co <br />NOTES <br />1. W = MAXIMUM WIDTH OF TRENCH, FOR, PIPES 15" OR <br />LESS IN DIA W=40". FOR PIPES 18" OR GREATER W=L$ X <br />I.D, + 18". PIPE MUST BE CENTERED IN TRENCH. <br />7 8 <br />1 ALTERNATE SLOPING TRENCH WALL TO MEET 03.H.A, <br />'MIN REQUIREMENTS (NO SLOPES STEEPER THAN 1� I EXCEPT <br />FUR ROCK). <br />3, SUITABLE NATIVE MArERIAL OR IMPORTED GRAVEL <br />BORROW AS DIRECTED. COMIPACTTO 90% MAXIMUM <br />DENSITY. <br />4. FOUNDATION GRAVEL IF REQUIRED BY THE ENGINEER TO <br />REPLACE UNSUITABLE MATERIAL. SHALL BE FOUNDATION <br />MATERIAL CLASS A, B OR AS APPROVED BY THE <br />_j ENGINEER. <br />COMPACTION <br />5. IF DIRECTED BY THE ENGINEER THE TOPTHREE TO FIVE <br />PROVIDE UNIFORM SUPPORT UNDER PIPE <br />FEET OF BACKFILL SHALL BE IMPORTED GRAVEL BORROW <br />BARREL, <br />OR SUITABLE NATIVE MATERIAL COMPACTED TO 95% <br />HAND TAMP UNDER PIPE HAUNCHES FOR ALL MAXIMUM DENSITY. <br />BEDDING MATERIALS. <br />6. SEE CITY OF FVERETI T STANDARD DWG 326 FOR <br />ALL BACKFILL MATERIAL SHALL BE PLACED IN PAVEMENT PATCH DETAILS - <br />LIFTS NOT TO EXCEED 12 INCHES BEFORE 7� VERTICAL TRENCH WALLS WITH SHORING TO CONFORM <br />COMPACTION UNLESS AUTHOPIZED BY THE TO CLS,HA. REGULATIONS. <br />ENGINEER DUE TO THE CHARACTER OF THE <br />MATERIAL AND THE COMPACTING EQUIPMENT, <br />& SUBGRADE OR GROUND SURFACE IN NON -PAVED AREAS. <br />,,-UPPER LIMff OF COMPACT BEDDING MATERIAL TO 90% 9. EXCAVATED NATIVE MATERIAL OR STOCKPILED BACKFILL <br />PIPE ZONE MAXIMUM DENSITY EXCEPT DIRECTLY OVER MATERIAL. <br />PIPE, HAND TAMP ONLY. MECHANICAL <br />COMPACTION OF BACK FILL MATERIAL SHALL 10. FOR ALL TRENCHING TRANSVERSE TO THE ROADWAY <br />NOT BEGIN UNTIL THE DEPTH OF COMPACTED RACKFILL ABOVE THE PIPE ZONE SHALL BE CONTROLLED <br />BACKFILL MATERIAL IS 2 FEET ABOVE THE TOP <br />or PIPE. DENSITY FILL. SEE SECTION 3-9.6 & 3-20A OF THESE <br />STANDARDS. <br />EACH LIFT $HALL BE MECHANICALLY IL FOR UTILITY CUTS SUCH AS GAS, TELEPHONE, POWER, <br />COMPACTED TO THE REQUIRED DENSITY PRIOR <br />TO PLACING SUBSEQUENT LIFTS OF BACKFILL AND CABLE TV LONGITUDINAL TO THE ROADWAY, <br />MATERIAL, BACKFILL SHALL BE CONTROLLED DENSITY FILL. SEE <br />SECTION 3-9.5 OF THESE STANDARDS. <br />COMPACTION TESTS SHALL BE AS REQUIRED BY <br />THE CITY ENGINEER, BUT IN NO CASE LESS THAN <br />2 TESTS EVERY 200 FEET OF TRENCH (ONE AT <br />\—LOWER LIMIT SUBGRADE AND ONE AT 50% OF TRENCH <br />OF PIPE ZONE DEPTH). <br />N I I ACE <br />PL . DENSITY AND MOISTURE CONTENT <br />WILL BE DETERMINED USING NUCLEAR <br />METHOD, ASTM 2922-71. mm EVERETT PUBLIC WORKS <br />LABORATORY MAXIMUM DRY DENSITY AND Vm WAtNINGTON DEPARTMENT <br />OPTIMUM MOISTURE CONTENT WILL BE <br />DETERMINED USING THE MODIFIED PROCTOR 12/11/2019 <br />METHOD IN ACCORDANCE WITH ASTM D-1557� <br />TYPICAL TRENCH SECTION 614 <br />_T J__ <br />AS <br />3611 <br />1� <br />1, ALL BACKFILL MAT FRIAL SHALL BE PLACED IN LIFTS <br />NOT TO EXCEED 12 INCHES BEFORE COMPACTION <br />UNLESS AUTHORIZED BY THE ENGINEER DUE TO THE <br />CHARACTER OF THE MATERIAL AND THE <br />COMPACTING EQUIPMENT. <br />2, MECHANICAL COMPACTION OF BACK FILL MATERIAL <br />SHALL NOT 8EQfN UNTIL THE DEPTH OF COMPACTED <br />BACKFILL MATERIAL IS 2 FEET ABOVE THE TOP OF <br />plpe� <br />1 EACH LIFT SHALL BE MECHANICALLY COMPACTED TO <br />THE REQUIRED DENSITY PRIOR TO PLACING <br />SUBSEQUENT LIFI'S OF BACKFILL MATERIAL, <br />4. COMPACTION TESTS SHALL BE AS REQUIRED BY THE <br />CITY ENGINEER, BUT IN NO CASE LESS THAN 2 TESTS <br />EVERY 200 FEET OF TRENCH (ONE AT SUBGRADE AND <br />ONE AT 50% OF TRENCH DEPTH). <br />S. IN PLACE DENSITY AND MOISTURE CONTENT WILL BE <br />DETERMINED USING NUCLEAR METHOD, ASTM <br />2922-71. <br />6, LABORATORY MAXIMUM DRY DENSITY AND <br />OPTIMUM MOISTURE CONTENT WILL BE DETERMINED <br />USING THE MODIFIED PROCTOR METHOD IN <br />ACCORDANCE WITH ASTM D-1557. <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />6T)61T�2017 <br />51 ]&VfN 116r <br />TYPICAL TRENCH <br />COMPACTION 620 <br />CRUS <br />BASE <br />X �7 <br />x <br />< <br />o" <br />P,: w <br />BEDDING AND FOUNDATION: <br />BEDDING <br />FOR PIPES IN TRENCHES SECTION <br />SCALE: PIPE BEDDING SECTION <br />STANDARD TRENCH SECTION <br />SEE STANDARD DRAWING 614 <br />ALTERNATE SLOPING <br />TRENCH WALL <br />UPPER LIM IT OF <br />PIPE ZONE <br />LOWER LIMIT <br />OF PIPE ZONE <br />OVER EXCAVATE AND PLACE <br />FOUNDATION MATERIAL CLASS A, 8 <br />OR AS APPROVED BY THE ENGINEER <br />WHEN SPECIFIED. <br />6" GASKETED <br />CAST IRON BOLTED RING & COVER SPIGOT CAP OR <br />6" GASKETED TYPE I & 2 (SEE NOTE 5). MECHANICAL <br />SPIGOT CAP PLUG TYPE I & 2 <br />OR <br />MECHANICAL <br />PLUG 3t 301, SQ <br />TYPE I & 2 2z DO n D [70-rki i � ru c LANDSCAPED OR <br />OR RIGHT-OF-WAY UNPAVED SURFACE <br />TY P <br />PAVED SURFACE <br />CONCRETE COLLAR <br />SEE NOTES <br />(COMMERCIAL CONC) TYP. 6AND7 <br />SO TYP. <br />STANDARD 12" DIA PVC SLEEVE ell <br />DR IING 602 TYP, TYPE I & I SEE STANDARD <br />SEAL ANNULAR SPACE DRAWING 602 <br />WITH FIBER JOINT <br />TYPE I PACKING OR URETHANE TYPE 2 <br />PAVED AREAS FOAM TYP.'f YPE 1 & 2 UNPAVED AREAS <br />PERMANENT INSTALLATIONS <br />STUB MARKER (NOTE 4) SS BOLTS <br />12 7/8"MIN <br />I vd, a. !LWA 12 cl ri 114 r <br />4-4 <br />6" GASKETED CAP <br />(NOTE 4) <br />PLAN SECTION <br />12" CAST IRON BOLTED RING AND COVER <br />(SEE NOTE 5) <br />U <br />SEE _5TD <br />DETAIL 602 <br />TYPE 3 <br />UNPAVED AREA <br />TEMPORARY INSTALLATION FOR NEW DEVELOPMENT <br />SEWER CLEAN OUT <br />LIMITS OF TRENCH <br />W = MAXIMUM WIDTH OF TRENCH. FOR PIPES 15" OR <br />LESS IN DIAMETER W = 40`� FOR PIPES 18" OR <br />GREATER W = 11/2 x LD. + 18". PIPE MUST BE <br />CENTERED IN TRENCH. <br />MATERIALS <br />PIPE BEDDING MATERIAL SHALL BE CRUSHED <br />SURFACING BASE COURSE CONFORMING TO SECTION <br />9-03.9(3) OF THE STANDARD SPECIFICATIONS FOR <br />ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION <br />WSDOT/APWA. <br />OPTIONAL PIPE BEDDING (TO SPRING -LINE) FOR PIPE <br />15"DIA AND LARGER: PEA GRAVEL OR 3/41' CLEAN <br />ROCK CHIPS AS APPROVED IN ADVANCE BY ENGINEER, <br />OVER EXCAVATION AND PLACEMENT OF FOUNDATION <br />MATERIAL, IF REQUIRED 5HALL BE FOUNDATION <br />MATERIAL CLASS A OR 8 CONFORMING TO SEC71ON <br />9-03.17 OF THE STANDARD SPECIFICATIONS FOR ROAD, <br />BRIDGE AND MUNICIPAL CONSTRUCTION <br />WSDOT/APVVA. <br />PROCEDURE FOR COMPACTION <br />PROVIDE UNIFORM SUPPORT UNDER PIPE BARREL. <br />COMPACT BEDDING MATERIAL TO 90% MAXIMUM <br />DENSITY EXCEPT DIRECTLY OVER PIPE, HAND TAMP <br />ONLY. <br />HAND TANIP UNDER PIPE HAUNCHES FOR ALL <br />BEDDING MATERIALS. <br />FOR ADDITIONAL COMPACTION INFORMATION SEE <br />c <br />STANDARD DWG 615. <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />ii)3'612016, <br />M's NLIAZ '��'L <br />BEDDING FOR PIPE <br />IN TRENCHES 615 <br />NOTES <br />1. CLEAWOUT PIPE AND FITTINGS SHALL BE PVC, <br />ASTM D3034, SDR 35 OR AWWA C900. <br />2. A SANITARY TEE MAY BE INSTALLED IN LIEU OF A <br />WYE AS SHOWN. STRAIGHT TEES ARE NOT <br />ACCEPTABLE. <br />3. SEWER STUB WILL HE EXTENDED 10'BEYOND <br />PROPERTY LINE TO PREVENT DAMAGETO <br />CLEAN -OUT AND MINIMIZE CONFLICTS WITH OTHER <br />UTILITIES WHEN SERVICETO BUILDING IS <br />INSTALLED. <br />4, TYPE 3 TEMPORARY INSTALLATIONS (NEW <br />DEVELOPMENT) SHALL HAVE A PRESSURE TREATED <br />2"X4" sTuB MARKER THAT EXTENDS DOWN TO A <br />MIN OF 24" BELOW GROUND. A MIN Or 36" SHALL <br />EXTEND ABOVE GROUND. STUB MARKER SHALL BE <br />PAINTED WITH WHITE TRAFFIC PAINT. THE WORD <br />"SEWER" AND THE DEPTH IN FEET FROM GROUND <br />SURFACE TO SEWER STUB PIPE INVERT SHALL BE <br />PAINTED ON THE MARKER WITH 3" HIGH BLACK <br />PAINTED LETTERS. <br />5� CAST IRON BOLTED RING AND COVER SHALL BE <br />EAST JORDAN IRON WORKS NO. 3660CPT OR <br />EQUAL, <br />6. RING AND COVER INSTALLATION IS SHOWN FOR <br />PAVED AND UNPAVED AREAS, FIELD CONDITIONS <br />WILL DICTATE WHICH INSTALLATION IS <br />APPROPRIATE. <br />7. RING AND COVER WITH CONCRETE COLLAR M,'kY BE <br />PLACED AT GROUND SURFACE IN UNPAVED AREAS <br />IF DESIRED. <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />cl;l �Z�zg� <br />141f 03/30/2017 <br />SEWER CLEAN —OUT <br />TYPE 1, 2,3 & 12" CAST IRON 604 <br />RING & COVER <br />. . . . . . . . . . . . . <br />lw ORMa— <br />" 541 <br />X <br />N'N <br />R <br />a <br />0 <br />rt) F- <br />w <br />Z <br />0 <br />> <br />cq < <br />00 3: <br />Lu <br />Ld <br />_j <br />0 <br />m <br />W <br />m <br />0 <br />z x <br />0 <br />�&3 <br />Z <br />F_ <br />p <br />z <br />11 <br />Z <br />0 <br />o <br />(o <br />z <br />:3 <br />u <br />IN <br />................ <br />