My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE 2020 INTERWEST CONSTRUCTION INC Plans 2023-02-28 (2)
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
Plans
>
2320 RAILWAY AVE 2020 INTERWEST CONSTRUCTION INC Plans 2023-02-28 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 3:46:38 PM
Creation date
2/23/2023 3:19:58 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Permit
PW2010-036
Year
2020
Notes
SITE IMPROVEMENTS FOR ICI CONSTRUCTION YARD
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCALE: N.T.S. <br />NOTES: <br />1. THE INSTALLED PUMPS SHALL BE AN E-ONE SEWAGE GRINDER PUMP WITH <br />A 1HP MOTOR, 1725 RPM, 240 VOLT, 60 HERTZ, 1 PHASE. <br />2. THE INLET GROMMET SHALL BE CAPABLE OF ACCEPTING A 6 DIAMETER <br />PVC PIPE. <br />3. CONTRACTOR TO INSTALL PUMP STATION IN ACCORDANCE WITH <br />MANUFACTURER'S RECOMMENDATIONS. <br />4. CONTROL PANEL SHALL BE E-ONE T260 PANEL WITH BACKUP GENERATOR <br />RECEPTACLE WITH AUTO TRANSFER INSTALL ON POST CONFORM TO <br />ELECTRICAL CODES <br />FIELD JOINT REQUIRED <br />ON ALL MODELS <br />E/ONE EQUALIZER <br />WET --WELL VENT PIPE, <br />DUAL WALL CORRUGATED <br />HDPE ACCESSWAY <br />t <br />SCALE: N.T.S. <br />GRINDER PUMP CONSTRUCTION NOTES <br />1. EACH GRINDER SEWER PUMP AND FORCE MAIN SHALL BE INSTALLED IN STRICT <br />ACCORDANCE WITH ALL CITY CODES AND THE CONDITIONS OF THE APPROVED <br />DESIGN. <br />2. HYDROSTATIC TEST OF FORCE MAIN SHALL BE TESTED AT 150 PERCENT OF THE <br />WORKING PRESSURE OR 50 PSI HYDROSTATIC PRESSURE. WHICHEVER IS GREATER, <br />FOR PIPE SIZE UP TO 2-INCH INSIDE DIAMETER. TESTING SHALL BE A MINIMUM OF <br />10 MINUTE DURATION WITH NO LOSS OF PRESSURE. HYDROSTATIC TESTING WILL <br />INCLUDE THE PUMP CHECK AND BALL VALVES. <br />3. AN OPERATIONAL CHECK OF THE PUMP, ON/OFF SWITCH, FLOAT AND ALARM SHALL <br />BE REQUIRED AS PART OF THE TESTING PROCEDURES. <br />GRADE DIX152 <br />GASKETBD LID, HDPE <br />ELECTRICAL SUPPLY <br />CABLE (ESC), <br />6 CONDUCTOR, <br />TYPE SOOW CABLE <br />`-'-- 3.5" FLAT, PROVIDED FOR <br />FIELD INSTALLED <br />PENETRATION FOR CONDUIT <br />(SHOWN 000 FROM ACTUAL <br />LOCATION, IT IS TO DE <br />1600 FROM DISCHARGE) <br />DISCHARGE, 1-1/4" FPT <br />(304 SS) <br />QUICK DISCONNECT ASM <br />(304 SS) <br />SS CAST BALL VALVE <br />�J (304 SS) <br />1-1/4 DISCHARGE LINE <br />(304 S) <br />CHECK VALVE <br />(NORYL) <br />ANTI -SIPHON VALVE <br />(NORYL) <br />18" (MIN.) NIGH BY <br />6" WIDE CONCRETE <br />COLLAR. <br />HIDPE TANK <br />1/2" NOMINAL WALL <br />THICKNESS <br />10 GALLON CAPACITY <br />4. ALL PIPES IN NON -DRIVING AREAS ARE REQUIRED TO HAVE A MINIMUM OF 2 <br />COVER. ALL PVC GRAVITY MAINS IN RIGHT-OF-WAYS AND DRIVING AREAS ARE <br />REQUIRED TO HAVE A MINIMUM COVER OF 3'. ALL D.I.P. AND DRIVING AREAS OR <br />RIGHT-OF-WAYS ARE REQUIRED TO HAVE A MINIMUM COVER OF 3'. <br />5. GRAVITY SEWER PIPE SHALL BE CONSIDERED AS PART OF THE COMMERCIAL SEWER <br />PUMP INSTALLATION. TESTING OF GRAVITY LINES SHALL BE COMPLETED AT THE TIME <br />THE FORCE MAIN IS TESTED. <br />6. SEE DETAIL 03/C3.2 FOR PIPE TRENCH BEDDING AND BACKFILL. <br />7. HYDROSTATIC TESTING WILL BE DONE IN ACCORDANCE WITH THE CITY OF EVERETT <br />SANITARY SEWER SPECIFICATIONS, LATEST EDITION. <br />S. INSPECTION SHALL INCLUDE THE COMMERCIAL PUMP AND FORCE SEWER IN <br />ACCORDANCE WITH THE APPROVED PLANS. NO DEVIATION FROM THE APPROVED <br />PLANS WILL BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE UTILITIES <br />DEPARTMENT ENGINEERING SECTION. <br />9. THE SEWER LINES, FORCE MAIN, AND GRINDER PUMP SHALL REMAIN UNDER THE <br />OWNERSHIP OF THE PROPERTY OWNER WHO SHALL BE RESPONSIBLE FOR THEIR <br />OPERATION AND MAINTENANCE. <br />10. THE ALARM MUST BE IN A CONSPICUOUS LOCATION AND MUST BE AUDIO AND <br />VISUAL <br />11. SANITARY SEWER LINES AND WATER MAIN CROSSINGS: <br />A. THE STANDARD MINIMUM VERTICAL SEPARATION FOR WATER LINES 1S 1.5 FEET <br />ABOVE THE SANITARY SEWER LINE. SEPARATION SHALL BE MEASURED FROM <br />THE OUTER WALLS OF THE PIPES. <br />B. CONTACT THE SEWER DIVISION FOR UNUSUAL CIRCUMSTANCES FOR THE SEWER <br />DIVISION TO DETERMINE IF A REDUCED MINIMUM VERTICAL SEPARATION WILL <br />BE ALLOWED FOR LESS THAN 1.5 FEET BUT NOT LESS THAN 0.75 FEET. <br />ADDITIONAL PROVISIONS WILL BE REQUIRED. <br />13. SANITARY SEWER LINES AND UTILITY CROSSING OTHER THAN WATER LINES: <br />A. THE STANDARD MINIMUM VERTICAL SEPARATION FOR UTILITIES OTHER THAN <br />WATER LINES IS 1.5 FEET FROM THE SANITARY SEWER. SEPARATION SHALL BE <br />MEASURED FROM THE OUTER WALLS OF THE PIPES. <br />B. IF CONCRETE ENCASEMENT OF THE SANITARY SEWER IS PROVIDED, THEN A <br />REDUCED MINIMUM VERTICAL SEPARATION OF 0.75 FEET WILL BE ALLOWED. <br />THE CONCRETE ENCASEMENT SHALL EXTEND 10 FEET ON EACH SIDE OF THE <br />CROSSING. <br />C. CLASS 52 DUCTILE IRON PIPE MAY BE USED FOR THE SANITARY SEWER IN LIEU <br />OF CONCRETE ENCASEMENT PROVIDED THAT THERE IS NO TRANSITIONING TO <br />OTHER PIPE MATERIALS BETWEEN MANHOLES. <br />14. PARALLEL SEWER WATER LINES MUST HAVE 10 FEET OF HORIZONTAL SEPARATION. <br />15. THE GRINDER PUMP STRUCTURE SHALL BE SET ON A LAYEROF 12" COMPACTED <br />BALLAST (WSDOT 9-03.9(2)). <br />16. E-ONE CONTROL PANEL SHALL HAVE AUTO TRANSFER SWITCH CONNECTION TO <br />PORTABLE GAS POWERED BACKUP GENERATOR. <br />17. PORTABLE BACKUP GENERATOR SHALL BE WESTINGHOUSE WH7500 WATTS OR <br />APPROVED EQUAL. 240V GENERATOR MUST BE RATED AT 6500-WATT LOAD <br />MINIMUM. STORE AND PROTECT IN SHOP BUILDING. <br />18. STORE NON -ETHANOL STABILIZED PETROLEUM FUEL ONSITE. QUANTITY OF FUEL <br />STORED SHALL BE ABLE TO PROVIDE CONTINUOUS 24 HOUR OPERATION OF BACKUP <br />GENERATOR. STORAGE OF FLAMMABLE FUELS SHALL CONFORM TO CURRENT FIRE <br />CODE. <br />19. MAINTAIN BACKUP GENERATOR IN OPERATIONAL CONDITION WITH RUNNING CHECK <br />EVERY 4 MONTHS. MAINTAIN PER MANUFACTURERS RECOMMENDATION FOR <br />MAINTENANCE PROCEDURES/MANUAL. <br />NOTES: <br />1) <br />TRENCH WIDTH SHALL BE AS <br />W (SEE NOTE 1) <br />DETECTABLE MARKING <br />SPECIFIED IN SECTION 2-09.4 <br />TAPE 12"-18" BELOW <br />OF THE WSDOT STANDARD <br />FINISH GRADE. <br />SPECIFICATIONS. <br />INSTALL #14 GAUGE <br />COPPER TRACER WIRE 2) <br />BACKFILL FOR PIPE ZONE <br />TOP OF <br />DIRECTLY ABOVE ALL <br />BEDDING SHALL BE IN <br />SUBGRADE <br />STORM LINES <br />ACCORDANCE WITH WSDOT <br />PIPE ZONE �;/jam <br />STANDARD SPECIFICATIONS. USE <br />SAND PER WSDOT 9-03.13 FOR <br />BACKFILL <br />.. <br />\ <br />FORCEMAIN PIPE. <br />(SEE NOTE 3) `/ <br />��� Jr r� cr�pr <br />GRAVEL BACKFILL FOR <br />_Poo �� o0�o <br />`� <br />Lu <br />3) <br />PIPE ZONE BACKFILL SHALL BE <br />PIPE ZONE BEDDING <br />o �' <br />(�)o o c v <br />0 <br />,, <br />-� <br />IN ACCORDANCE WITH WSDOT <br />(SEE NOTE 2) <br />o °C <br />�_ <br />a:0 <br />STANDARD SPECIFICATIONS <br />-1 o o <br />® <br /><c <br />SECTION 9-03.14(1). <br />FOUNDATION <br />O �) <br />¢r� r <br />LEVEL�� <br />.� <br />O O%' G 00 <br />p OJGop vo�0�* <br />SUITABLE NATIVE MATERIAL <br />PER GEOTECHNICAL <br />ENGINEER, COMPACT TO <br />95% MAX. DENSITY. <br />TYPICAL SSFM PIPE BEDDING <br />SCALE: N.T.S. <br />U <br />Uj <br />� <br />w <br />C <br />0 <br />w <br />can <br />cn <br />L <br />Cf) <br />Lu <br />N <br />CD <br />cn <br />z <br />CIA <br />v) <br />T) <br />Ld <br />CD <br />CD <br />CD <br />LLJ <br />V <br />CD <br />M <br />a 0 <br />� <br />0 <br />LLJ <br />Ld <br />< w <br />� <br />� <br />< <br />0 <br />�. ® <br />® <br />0 <br />® <br />V1 <br />SCALE: N.T.S.�� <br />< <br />w <br />9 <br />o <br />A <br />Lu <br />0 1- <br />MA <br />® <br />o w <br />to Z <br />� 0 <br />Q <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.