Laserfiche WebLink
1 <br />2 <br />3 <br />4 5 <br />GENERAL NOTES - STAIRS/RAMP <br />D <br />_ _ <br />_.._._ <br />_ _______ ___-_ __ _ __ - <br />- <br />25014TTI A IE S. S c G"i' A. FOR STAIRS DETAILS - REFER TO A8.12 AND A8.13 SHEET, FOR RAMP <br />1 4 ! ��ii <br />ram,.- ...� .,- E.f'1t°tya §'Y �im3�.CS'.. <br />DETAILS TO SHEET A8.13, DETAIL C2 AND C3. <br />B3 <br />INTERIOR SIDE EXTERIOR <br />� � � <br />SIDE Kf 42� 00 <br />A4.11 <br />5 B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE THE <br />T DEMOLITION WORK WITH STAIR'S RECONSTRUCTION. NOTIFY ARCHITECT <br />=off <br />EXISTING DOOR <br />SEALANT WITH BACKER ROD <br />- IMMEDIATELY IF ANY DISCREPANCIES ARE ENCOUNTERED. CONTRACTOR <br />TO CONFIRM SIZE AND CONNECTIONS OF ALL EXISTING MEMBERS TO <br />DYKEMAN <br />B7 - L3 <br />DOOR SEAL <br />TIT DRAWING HAS. BEEN REVIEWED I REMAIN IN PLACE. CONFIRM THE QUALITY AND CONDITION OF EXISTING <br />FOR CONFORMANCE WITH 1 H CONSTRUCTION PRIOR TO ATTACHING ANY NEW MEMBERS. <br />589' _ g 1/$'I - <br />- - <br />- _ --- <br />-. <br />:. <br />STRUCTURALREQUIREMENT_ <br />ARCHITECTURE <br />DESIGNS <br />---- ;' — - <br />PEMKO 272 6" THRESHOLD- _ <br />SET IN FULL BED OF SEALANT <br />INDI /T THEATTACHED T LETTER C. CONTRACTOR TO EXTEND EXISTING ROOF BY EXTENDING RAFTERS AT <br />E THE TH <br />O — <br />, <br />y li' -- u - <br />n <br />I' <br />:;STAIRCASE. <br />, , <br />ALTERNATE. PEMKO 2748 (8) <br />I STAIRS 1A, 4A, 5A, 6A, AND 6B, AS REQUIRED TO COVER RECONSTRUCTED <br />AhI�'?RCALCULATIONS, REVIEW RAFTER EXTENSION CONSTRUCTION DETAILS WITH <br />U <br />w - <br />Z <br />A, <br />- <br />II �- <br />, j ; 'I r ;; , , <br />! - - A8,13 <br />'. <br />, ! !; <br />! --� e I �� <br />0 l <br />EXISTING FLOOR ` h <br />CONSTRUCTION AND FINISH <br />= <br />N Jibe Gialus a, PE, E, LEED AP STRUCTURAL ENGINEER. <br />ICY. <br />r- � <br />1r River's L.ancH 102221 1 D. HEIGHT DIMENSIONS ARE GIVEN FROM FINISHED SLAB WHERE <br />DATF, <br />1716 View Drive <br />o A 98201 <br />OD <br />ji <br />U J -- <br />PR w <br />II __ __ <br />_ - - <br />- -- <br />INDICATED OR RELATIVE TO DATUM NOTED ON THE DRAWINGS. <br />_ <br />o w <br />N <br />_ _ <br />------ - - r -- <br />- ---- <br />- <br />- - <br />--- <br />.:,., <br />E. CONTRACTOR TO PROVIDE NEW FOOTINGS A NECESSARY R NEW <br />O GS SO <br />F <br />CONSULTANT: <br />B7 — L2 + <br />— — — ----— - <br />-- <br />a <br />COLUMNS OR THEIR REPLACEMENT, PER STRUCTURAL NOTES. <br />v 5821 Oil <br />---- ---- <br />_- <br />F. REFER TO SHEET CS1.01 FOR STAIR'S FOUNDATION NOTES AND STAIR'S <br />FRAMING NOTES. <br />»: <br />BRACE --REFER TO- <br />I <br />DETAIL <br />B4/A4.11 y <br />T -- <br />i <br />r, <br />fffffff <br />L� I <br />�li� <br />REGISTRATION <br />THRESHOLD DETAIL ATEXISTING <br />DOOR BEAMS PER PLAN <br />B7 - L1 - <br />�- 573 0" <br />- — — - - - <br />- <br />= <br />955 2 <br />C <br />- <br />REGISTERED <br />ARCHITECT <br />C <br />A3 <br />TYP. <br />_ <br />o <br />A8.13 <br />� <br />CHA L AARON STEVENS <br />C1 B1 <br />_ <br />g <br />STATE OF WASHINGTON <br />RAMP -SECTION C3 <br />A4.11 A4.11 <br />- <br />C1 <br />(2TYP <br />(5) CENTERED N <br />PROJECT IDENTIFICATION: <br />POST & BRACE & SPACED / <br />- - B7 - L3 /� VERTICALLY @ 3" OC - <br />v <br />589' - 9 1 /8�� <br />POST PER PLAN <br />Re -siding Project, <br />1-1/4 STD SS PIPE <br />B3 C2� HANDRAIL <br />e <br />(1) - 1/2" DIAM. THRU BOLT <br />C3 <br />1 <br />Rivers Landing <br />A4.11 A8.13 PREFABRICATED METAL <br />GUARDRAIL <br />— — — <br />p <br />A$.13 <br />Building 7 <br />o <br />_ _ <br />- <br />I; (I I� i� (I �, <br />PROVIDE 6x BLKG FLUSH <br />BETWEEN BRACES <br />FOR <br />I JI Ti T ._�_ ,i ( I , e.. <br />� <br />r.-`�,-.r- � <br />�,_ . L 11 :I_� <br />-- <br />PT 2x6 BRACE TYP 2 <br />( ) <br />Williams <br />. I t � <br />it i � � i ,� � <br />� i ii' - i' � I F I I ( ii ;j I � i% a <br />; <br />� <br />i I <br />i ; <br />I, <br />�� <br />"r--=m -��� __.;> <br />i I i I Z <br />.>b.�. <br />B7 — <br />L2I-- <br />1 II <br />B7 — L2_ _ <br />-58z <br />it II �, Oil-li I i� <br />.-' a t� 11 <br />��� i� <br />;I �i.:; <br />- <br />J <br />— <br />582 0 <br />Investments <br />- 0 <br />_ - _ <br />I�� '� <br />_4 — <br />A3 <br />TYP. <br />_ _ � <br />BRACE - REFER TO <br />DETAIL B 4 11 , <br />4/A . <br />A T <br />\ <br />BRACE - REFER TO A <br />/\ DETAIL B4/A4.11 <br />. <br />X <br />/ \ <br />o x <br />3015 9th Street, Everett, <br />A3 \A8.13 r <br />V V A. 98201 <br />1 <br />A8.13 - - <br />Permit Set <br />B <br />t ti <br />I _-� <br />a <br />_ <br />B7 — L1 <br />This drawing is: <br />g <br />r <br />.� -�: - - - FOOTING PER <br />B7 - L1 � �, _� ry .� ,..� : ,�� �"- � 573 0 <br />- - - PLAN <br />573' _ 0" <br />' 2 <br />1. Copyright 2020 Dykeman, Inc. <br />2. The Architect's Instrument of Professional Service. <br />..r. <br />- - <br />For use on this project only. Obtain <br />3 Architect's <br />— <br />written permission for any other use or reproduction. <br />PROJECT <br />RAMP - SECTION B3 <br />B 1 <br />RAMP -SECTION A3 <br />B� <br />/� RAMP - BRACE SECTION <br />B4 <br />2021-023 <br />1/4" = 1'-0" <br />1/4" = 1'-0" <br />3/4" = 1'-01, <br />MARK DATE DESCRIPTION <br />CONTINUOUS 1'4' WIDE x 0'-10" <br />DEEP FOOTING W/ 2#4 <br />B3 <br />A4.11 <br />B3 <br />PR 1 12/30/2021 <br />Permit Correction <br />CONTINUOUS REINFORCEMENT <br />\ <br />A4.11 <br />OUTLINE OF b <br />� <br />EXISTING BUILDING <br />FOUNDATION <br />DRILL &EPDXY FOOTING REINF <br />INTO EXISTING W/ HILTI HIT-HY200 <br />� <br />LL <br />EPDXY & 4" MIN EMBED TYP. �� <br />/ <br />'� <br />�� <br />1-1/4 STD SS PIPEzj� <br />HANDRAIL PR - 0" CROSS -BRACING <br />PER DETAIL B4/A4.11 <br />EXISTING SLAB ONE, <br />GRADE ABOVE <br />..............: - <br />- -- -.>PT <br />.--A:. <br />4x10 HF#2 <br />.- _ <br />r x <br />-ALFhl <br />C1 ---� P 4 1 HF# <br />- i i PT 4x8 HF#2 A� T x 0 2 �----� PT 4x10 HF#2 -' <br />-�- -'� �__ - - - <br />C1 <br />-- <br />_-� -, <br />I I <br />PRINCIPAL IN CHARGE: MS <br />PROJECT MANAGER: DH <br />A4.11 T6 <br />B1 <br />-- <br />(� <br />i i A� }z� A i tJ <br />�'S.� Ts�s <br />- <br />= / JI <br />+� S <br />.-� - - -- <br />A4.11 <br />B1 _ - <br />- <br />_ <br />_ -- a ® oB <br />�` <br />_ _ -I -- SLOPE i <br />_PR <br />p ; i <br />I-- F - <br />PROJECT ARCHITECT: AO <br />JOB CAPTAIN: KF <br />A4.11 <br />- <br />i i� -, --, <br />I PT 4x8 HF#2 PT 4x10 HF#2 i PT 4x10 HF#2 <br />r - - r - i--, <br />i o- I PT HF 2 a I <br />A <br />A4.11 <br />- i i --w�r <br />-DRAWINGF---- <br />A <br />-----------• <br />--- — -� <br />x10 <br />-- - <br />-_---_--_- <br />_ <br />A <br />PROVIDE SIMPSON <br />—J �-----J L----J <br />5' - 8" EQ EQ <br />L ---J fO L--- <br />6" 6-i�,o <br />`9 <br />CB66 POST BASE <br />(THIS FOOTING ONLY) <br />29 - 4 1/2' <br />PREFABRICATED METAL <br />GUARDRAIL <br />23' - 11" CONTRACTOR 6" �yJ� <br />BUILDING 7 - RAMP <br />CONTRACTOR FIELD VERIFY <br />FIELD VERIFY <br />1 <br />2'-0" x 2'-0" x U-10" DEEP FOOTING <br />W/ 3#4 EA WAY BOTTOM PER <br />S l�,,�! <br />PR �J))JAS1' rI�'/ Cl <br />FOOTING DETAIL, TYP.DRAWING <br />�S <br />NUMBER: <br />Q <br />CITYOF EVERET <br />BUILDING 7 -RAMP -FOUNDATION <br />PLAN /FRAMING PLAN <br />BUILDING 7 -LEVEL 2 -RAMP <br />'00♦ <br />PLAN /BRACING ��' I <br />, <br />N <br />N <br />1 <br />2 <br />3 <br />4 5 <br />