1
<br />2
<br />3
<br />4 5
<br />GENERAL NOTES - STAIRS/RAMP
<br />D
<br />_ _
<br />_.._._
<br />_ _______ ___-_ __ _ __ -
<br />-
<br />25014TTI A IE S. S c G"i' A. FOR STAIRS DETAILS - REFER TO A8.12 AND A8.13 SHEET, FOR RAMP
<br />1 4 ! ��ii
<br />ram,.- ...� .,- E.f'1t°tya §'Y �im3�.CS'..
<br />DETAILS TO SHEET A8.13, DETAIL C2 AND C3.
<br />B3
<br />INTERIOR SIDE EXTERIOR
<br />� � �
<br />SIDE Kf 42� 00
<br />A4.11
<br />5 B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE THE
<br />T DEMOLITION WORK WITH STAIR'S RECONSTRUCTION. NOTIFY ARCHITECT
<br />=off
<br />EXISTING DOOR
<br />SEALANT WITH BACKER ROD
<br />- IMMEDIATELY IF ANY DISCREPANCIES ARE ENCOUNTERED. CONTRACTOR
<br />TO CONFIRM SIZE AND CONNECTIONS OF ALL EXISTING MEMBERS TO
<br />DYKEMAN
<br />B7 - L3
<br />DOOR SEAL
<br />TIT DRAWING HAS. BEEN REVIEWED I REMAIN IN PLACE. CONFIRM THE QUALITY AND CONDITION OF EXISTING
<br />FOR CONFORMANCE WITH 1 H CONSTRUCTION PRIOR TO ATTACHING ANY NEW MEMBERS.
<br />589' _ g 1/$'I -
<br />- -
<br />- _ ---
<br />-.
<br />:.
<br />STRUCTURALREQUIREMENT_
<br />ARCHITECTURE
<br />DESIGNS
<br />---- ;' — -
<br />PEMKO 272 6" THRESHOLD- _
<br />SET IN FULL BED OF SEALANT
<br />INDI /T THEATTACHED T LETTER C. CONTRACTOR TO EXTEND EXISTING ROOF BY EXTENDING RAFTERS AT
<br />E THE TH
<br />O —
<br />,
<br />y li' -- u -
<br />n
<br />I'
<br />:;STAIRCASE.
<br />, ,
<br />ALTERNATE. PEMKO 2748 (8)
<br />I STAIRS 1A, 4A, 5A, 6A, AND 6B, AS REQUIRED TO COVER RECONSTRUCTED
<br />AhI�'?RCALCULATIONS, REVIEW RAFTER EXTENSION CONSTRUCTION DETAILS WITH
<br />U
<br />w -
<br />Z
<br />A,
<br />-
<br />II �-
<br />, j ; 'I r ;; , ,
<br />! - - A8,13
<br />'.
<br />, ! !;
<br />! --� e I ��
<br />0 l
<br />EXISTING FLOOR ` h
<br />CONSTRUCTION AND FINISH
<br />=
<br />N Jibe Gialus a, PE, E, LEED AP STRUCTURAL ENGINEER.
<br />ICY.
<br />r- �
<br />1r River's L.ancH 102221 1 D. HEIGHT DIMENSIONS ARE GIVEN FROM FINISHED SLAB WHERE
<br />DATF,
<br />1716 View Drive
<br />o A 98201
<br />OD
<br />ji
<br />U J --
<br />PR w
<br />II __ __
<br />_ - -
<br />- --
<br />INDICATED OR RELATIVE TO DATUM NOTED ON THE DRAWINGS.
<br />_
<br />o w
<br />N
<br />_ _
<br />------ - - r --
<br />- ----
<br />-
<br />- -
<br />---
<br />.:,.,
<br />E. CONTRACTOR TO PROVIDE NEW FOOTINGS A NECESSARY R NEW
<br />O GS SO
<br />F
<br />CONSULTANT:
<br />B7 — L2 +
<br />— — — ----— -
<br />--
<br />a
<br />COLUMNS OR THEIR REPLACEMENT, PER STRUCTURAL NOTES.
<br />v 5821 Oil
<br />---- ----
<br />_-
<br />F. REFER TO SHEET CS1.01 FOR STAIR'S FOUNDATION NOTES AND STAIR'S
<br />FRAMING NOTES.
<br />»:
<br />BRACE --REFER TO-
<br />I
<br />DETAIL
<br />B4/A4.11 y
<br />T --
<br />i
<br />r,
<br />fffffff
<br />L� I
<br />�li�
<br />REGISTRATION
<br />THRESHOLD DETAIL ATEXISTING
<br />DOOR BEAMS PER PLAN
<br />B7 - L1 -
<br />�- 573 0"
<br />- — — - - -
<br />-
<br />=
<br />955 2
<br />C
<br />-
<br />REGISTERED
<br />ARCHITECT
<br />C
<br />A3
<br />TYP.
<br />_
<br />o
<br />A8.13
<br />�
<br />CHA L AARON STEVENS
<br />C1 B1
<br />_
<br />g
<br />STATE OF WASHINGTON
<br />RAMP -SECTION C3
<br />A4.11 A4.11
<br />-
<br />C1
<br />(2TYP
<br />(5) CENTERED N
<br />PROJECT IDENTIFICATION:
<br />POST & BRACE & SPACED /
<br />- - B7 - L3 /� VERTICALLY @ 3" OC -
<br />v
<br />589' - 9 1 /8��
<br />POST PER PLAN
<br />Re -siding Project,
<br />1-1/4 STD SS PIPE
<br />B3 C2� HANDRAIL
<br />e
<br />(1) - 1/2" DIAM. THRU BOLT
<br />C3
<br />1
<br />Rivers Landing
<br />A4.11 A8.13 PREFABRICATED METAL
<br />GUARDRAIL
<br />— — —
<br />p
<br />A$.13
<br />Building 7
<br />o
<br />_ _
<br />-
<br />I; (I I� i� (I �,
<br />PROVIDE 6x BLKG FLUSH
<br />BETWEEN BRACES
<br />FOR
<br />I JI Ti T ._�_ ,i ( I , e..
<br />�
<br />r.-`�,-.r- �
<br />�,_ . L 11 :I_�
<br />--
<br />PT 2x6 BRACE TYP 2
<br />( )
<br />Williams
<br />. I t �
<br />it i � � i ,� �
<br />� i ii' - i' � I F I I ( ii ;j I � i% a
<br />;
<br />�
<br />i I
<br />i ;
<br />I,
<br />��
<br />"r--=m -��� __.;>
<br />i I i I Z
<br />.>b.�.
<br />B7 —
<br />L2I--
<br />1 II
<br />B7 — L2_ _
<br />-58z
<br />it II �, Oil-li I i�
<br />.-' a t� 11
<br />��� i�
<br />;I �i.:;
<br />-
<br />J
<br />—
<br />582 0
<br />Investments
<br />- 0
<br />_ - _
<br />I�� '�
<br />_4 —
<br />A3
<br />TYP.
<br />_ _ �
<br />BRACE - REFER TO
<br />DETAIL B 4 11 ,
<br />4/A .
<br />A T
<br />\
<br />BRACE - REFER TO A
<br />/\ DETAIL B4/A4.11
<br />.
<br />X
<br />/ \
<br />o x
<br />3015 9th Street, Everett,
<br />A3 \A8.13 r
<br />V V A. 98201
<br />1
<br />A8.13 - -
<br />Permit Set
<br />B
<br />t ti
<br />I _-�
<br />a
<br />_
<br />B7 — L1
<br />This drawing is:
<br />g
<br />r
<br />.� -�: - - - FOOTING PER
<br />B7 - L1 � �, _� ry .� ,..� : ,�� �"- � 573 0
<br />- - - PLAN
<br />573' _ 0"
<br />' 2
<br />1. Copyright 2020 Dykeman, Inc.
<br />2. The Architect's Instrument of Professional Service.
<br />..r.
<br />- -
<br />For use on this project only. Obtain
<br />3 Architect's
<br />—
<br />written permission for any other use or reproduction.
<br />PROJECT
<br />RAMP - SECTION B3
<br />B 1
<br />RAMP -SECTION A3
<br />B�
<br />/� RAMP - BRACE SECTION
<br />B4
<br />2021-023
<br />1/4" = 1'-0"
<br />1/4" = 1'-0"
<br />3/4" = 1'-01,
<br />MARK DATE DESCRIPTION
<br />CONTINUOUS 1'4' WIDE x 0'-10"
<br />DEEP FOOTING W/ 2#4
<br />B3
<br />A4.11
<br />B3
<br />PR 1 12/30/2021
<br />Permit Correction
<br />CONTINUOUS REINFORCEMENT
<br />\
<br />A4.11
<br />OUTLINE OF b
<br />�
<br />EXISTING BUILDING
<br />FOUNDATION
<br />DRILL &EPDXY FOOTING REINF
<br />INTO EXISTING W/ HILTI HIT-HY200
<br />�
<br />LL
<br />EPDXY & 4" MIN EMBED TYP. ��
<br />/
<br />'�
<br />��
<br />1-1/4 STD SS PIPEzj�
<br />HANDRAIL PR - 0" CROSS -BRACING
<br />PER DETAIL B4/A4.11
<br />EXISTING SLAB ONE,
<br />GRADE ABOVE
<br />..............: -
<br />- -- -.>PT
<br />.--A:.
<br />4x10 HF#2
<br />.- _
<br />r x
<br />-ALFhl
<br />C1 ---� P 4 1 HF#
<br />- i i PT 4x8 HF#2 A� T x 0 2 �----� PT 4x10 HF#2 -'
<br />-�- -'� �__ - - -
<br />C1
<br />--
<br />_-� -,
<br />I I
<br />PRINCIPAL IN CHARGE: MS
<br />PROJECT MANAGER: DH
<br />A4.11 T6
<br />B1
<br />--
<br />(�
<br />i i A� }z� A i tJ
<br />�'S.� Ts�s
<br />-
<br />= / JI
<br />+� S
<br />.-� - - --
<br />A4.11
<br />B1 _ -
<br />-
<br />_
<br />_ -- a ® oB
<br />�`
<br />_ _ -I -- SLOPE i
<br />_PR
<br />p ; i
<br />I-- F -
<br />PROJECT ARCHITECT: AO
<br />JOB CAPTAIN: KF
<br />A4.11
<br />-
<br />i i� -, --,
<br />I PT 4x8 HF#2 PT 4x10 HF#2 i PT 4x10 HF#2
<br />r - - r - i--,
<br />i o- I PT HF 2 a I
<br />A
<br />A4.11
<br />- i i --w�r
<br />-DRAWINGF----
<br />A
<br />-----------•
<br />--- — -�
<br />x10
<br />-- -
<br />-_---_--_-
<br />_
<br />A
<br />PROVIDE SIMPSON
<br />—J �-----J L----J
<br />5' - 8" EQ EQ
<br />L ---J fO L---
<br />6" 6-i�,o
<br />`9
<br />CB66 POST BASE
<br />(THIS FOOTING ONLY)
<br />29 - 4 1/2'
<br />PREFABRICATED METAL
<br />GUARDRAIL
<br />23' - 11" CONTRACTOR 6" �yJ�
<br />BUILDING 7 - RAMP
<br />CONTRACTOR FIELD VERIFY
<br />FIELD VERIFY
<br />1
<br />2'-0" x 2'-0" x U-10" DEEP FOOTING
<br />W/ 3#4 EA WAY BOTTOM PER
<br />S l�,,�!
<br />PR �J))JAS1' rI�'/ Cl
<br />FOOTING DETAIL, TYP.DRAWING
<br />�S
<br />NUMBER:
<br />Q
<br />CITYOF EVERET
<br />BUILDING 7 -RAMP -FOUNDATION
<br />PLAN /FRAMING PLAN
<br />BUILDING 7 -LEVEL 2 -RAMP
<br />'00♦
<br />PLAN /BRACING ��' I
<br />,
<br />N
<br />N
<br />1
<br />2
<br />3
<br />4 5
<br />
|