My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12906 19TH AVE SE 2020 Plans 2023-02-24
>
Address Records
>
19TH AVE SE
>
12906
>
Plans
>
12906 19TH AVE SE 2020 Plans 2023-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 8:32:55 AM
Creation date
2/23/2023 4:09:06 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12906
Permit
B2004-018
Year
2020
Notes
WITHIN THE WALLS REMODEL OF EXTG STORE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
METAL STUDS <br />FINISH AS SCHEDULED <br />EA. SIDE <br />35281 l <br />EMBED AT 12" <br />i • '• <br />SEALANT <br />1111i`: <br />tf ,111111171 <br />11 0 of 1—OU <br />600T150-54 W/ (5) #12 SDSM <br />SCREWS TO COLUMN & (5) <br />#10 SELF DRILING SMS TO <br />BOX BEAM, EA. SIDE <br />11 = 1 Im011 <br />DEFLECTION L <br />A3.2.2 3 <br />11 ® s1 B_011 <br />> LECTION CHANNEL <br />!.2) 3" ® 1 9.-011 <br />USTOM FABRICATED <br />OLUMN WRAP ON SITE BY <br />,.C. W/ STAINLESS STEEL BY <br />iC. COLUMN WRAP TO 8'-0" <br />FF <br />ROVIDE CONT. SILICONE <br />HULKING SEAL AROUND <br />OTTOM OF WRAP <br />UBE STEEL COLUMN SEE A6.3 FOR ADDITIONAL <br />LUMBING, ELECTRICAL, OIL FINISH NOTES <br />EFRIGERATOR CONDUIT - <br />EE MECHANICAL OR <br />LECTRICAL BRACE BACK TO <br />OLUMN AS REQUIRED. <br />YPICAL PAINT PIPE OR <br />ONDUIT TO MATCH COLUMN <br />BOVE <br />_" STRONG BACK STUDS - <br />- ABFINISHOV <br />E <br />l, C . TO FLOOR • <br />jl AS <br />REQUIRED <br />SEALANTASURE RIGIDITY. PROVIDE <br />ONT. SILICONE <br />ROUNDBOTTOM EDGE <br />COLUMN FURRING <br />WTOINKRm <br />DEFLECTION CHANNEL <br />60OT300-54 X CMT W/ (2) #10 <br />SMS AT 24" O.C. AT ROOF DECK <br />METAL END BEAD EA. SIDE <br />WALL SHEATHING WHERE <br />OCCURS <br />SEE WALL TYPES FOR OTUD <br />SIZES AND SPACING <br />20 GA TRACK (UNO) W/ #8 <br />SCREWS EA. SIDE TYP. <br />METAL END BEAD EA. SIDE <br />BOTTOM OF ROOF JOIST <br />BEYOND <br />• <br />/1 I 3111fP 411 <br />SMS AT .!•. JOIST <br />IF <br />W ` *r <br />WALL SHEATHING WHERE <br />OCCURS <br />LOCK MUST BE <br />FITTING TO PREVENT <br />FION OF COVER ON <br />ON <br />LOCK MUST BE <br />TIGHT FITTING TO PREVENT <br />ROTATION OF COVER ON <br />COLUMN <br />TRACKING BLOCKING W/ 1 1/2" FLANGES. <br />SIZE & GAGE TO MATCH STUDS. LOCATE <br />IN EVERY 4TH SPACE FOR STUDS AT 24" <br />OC, IN EVERY 6TH SPACE FOR STUDS AT <br />16" OC, AND AT EACH END OF WALL. <br />LT GAGE STUD --�` <br />SHTG AS OCCURS — <br />N <br />A® <br />#10 CMS AS SHOWN, <br />SEE SPECS <br />x 16 GAX2" CONT GALV STEEL FLAT STRAP <br />NOTES: <br />1. INSTALL TRACK BLOCKING ROWS AT T-O" O.C. VERT SPACING. <br />2. INSTALL FLAT STRAP BRACING AT WALL LOCATIONS WHERE SHTG IS ON <br />ONE SIDE ONLY AND/OR SHTG IS PARTIAL HEIGHT. INSTALL STRAP ON <br />SIDE W/ NO SHTG. INSTALL STRAP ON BOTH SIDES WHERE NO SHTG IS <br />PRESENT ON EITHER SIDE. <br />3. IF WALL HEIGHT EXCEEDS THE ALLOWABLE HEIGHT, PER CURRENT <br />SSMA TECHNICAL GUIDE, PROVIDE DIAGONAL KICKER BRACES PER <br />4. FOR WALLS WITH SHEATHING ON ONE SIDE ONLY <br />STUD WALL LATERAL BRACING <br />1 1 /9" = 1'_0" <br />I : J <br />Sim KICKER BRACE: MIN (2) <br />3 PER WAIL LENGTH <br />A1.3.1 OPTION 1 - 60OS162-33 <br />e BRACE AT 4'-0" OC. <br />OPTION 2 - 60OS200-43 <br />BRACE AT 8'-0" O.C. <br />362S162-33 CONT. HORIZ <br />AT MID -SPAN OF DIAGONAL <br />BRACE 2/ (2) #8 SMS <br />SCREW AT BRACE (NOT <br />REO'D WITH OPTION 1) <br />CEILING,A; <br />SEE PLANS <br />Sid CEILING WHERE OCCURS, <br />KICKER BRACE START ' 5 <br />ELEVATION A1.3.1 <br />SEE PLANS <br />z <br />w w>2 WALL SHEATHING, PER <br />-'tea®w® WALL TYPE <br />a-_jLLU)� <br />LL W :� > - Z (n STUD WALL LATERAL <br />Uj O 0 ,Z 9 O F / BRACING SEE 8/A3.2.2 <br />® F- LL- W D � O <br />h o 0 r w as o WALL STUDS PER PLAN <br />0 <5 U)0< <br /><O aa-- <0�CL <br />J MPnU)MI(.to <br />FINISH FLOOR <br />NOTE. <br />1. REFER TO MECHANICAL DRAWINGS AND ASD-1503 FOR WALL CONSTRUCTION <br />INFORMATION WHERE RETURN <br />AIR DUCT IS SCHEDULED FOR INSTALLATION. <br />2. AT DRY SPRINKLER ROOM, <br />PROVIDE 117' OSB TO CEILING HEIGHT. <br />METAL STUDS @16" o.c. TO ROOF DECK <br />HVAC RETURN <br />AIR DUCT WHERE <br />REQUIRED; SEE <br />EXTEND GYPSUM BOARD TO DECK <br />I WHERE NO FINISH CEILING OCCURS <br />NOTE No. 1 FOR <br />EXPLANATION. <br />U)❑ <br />ELo <br />EXTEND GYPSUM BOARD 6" ABOVE <br />O m <br />WHERE FINISH CEILING OCCURS <br />u <br />FINISH CEILING WHERE <br />OCCURS - REFER TO <br />a <br />j <br />REFLECTED CEILING PLAN <br />0 <br />OO <br />- GYPSUM BOARD <br />CONTINUOUS RETURN AIR <br />OPENING WHERE REQUIRED <br />BEHIND CASES, SEE NOTE No. 1 <br />i <br />- FOR EXPLANATION. <br />BACKROOM <br />SALES <br />Co <br />WALL BASE <br />TYPICAL SLAB CONSTRUCTION <br />p <br />0.0 _ <br />i fLOOR SLAB <br />WALL TYPE 5 <br />3/8" a 11®011 <br />WALL TYPE BOX <br />PARTITION HEIGHT <br /># <br />-WALL TYPE ID <br />LEFT BLANK <br />-EXTEND ASSEMBLY AS SHOWN IN WALL TYPE DETAIL._ <br />METAL STUD WIDTH (NOTED LEFT OR RIGHT OF WALL ID BOX) <br />X'-X" <br />-EXTEND ASSEMBLY X' X" ABOVE FINISH FLOOR <br />LEFT BLANK <br />-3 5/8" METAL STUD WIDTH - STANDARD <br />EXAMPLE <br />DEPTH, UNO <br />WALL TYPE BOX <br />-� METAL STUD WIDTH <br />6" <br />-6" METAL STUD USED IN ASSEMBLY <br />//— <br />6U <br />x1_xU �,j PARTITION HEIGHT <br />GENERAL NOTES <br />BOARD:A. GYPSUM >r BOARD D UNLESS NOTED OTHERWISE <br />B. MOISTURE . BOARD: THICK TO BE USED UNLESS NOTED OTHERWISE. SEE FINISH <br />NOTEDSCHEDULE <br />C. CEMENT BOARD: 1/2" UNLESS OTHERWISE. SEE FINISH SCHEDULE <br />D. WOOD PANEL TO B B WOODP <br />STANDARDE. METAL STUDS: DEPTH TO Bi" UNLESS NOTED OTHERWISE.REFER TO SPECIFICATIONS FOR <br />GAUGE UNLESS NOTED OTHERWISE <br />F. BRACING AT COOLER/FREEZER: FULL HEIGHT WALLS BUILT ALONG COOLER/FREEZER PANELS SHOULD BE <br />BRACED AT ROOF PANEL TO UTILIZE STANDARD DEPTH METAL STUD <br />G. FLOOR FINISH <br />H. <br />- -. BASE: PARTITION r- EXISTING,1SHEATHING THICKNESS e <br />N ALIGNING <br />A PARALLEL TO JOISTS - SCALE 1"=V-0" <br />(E) ROOFING SYSTEM <br />20 GA TRACK 2/ (2) #10 <br />SCREWS AT 24" O.C. <br />(E) JOIST <br />SHEATHING ON ONE <br />SIDE, PROVIDE STUD <br />WALL LATERAL <br />1. FINISHED CEILINGS: EXTEND GYP. BD. 6" ABOVE CEILING, METAL STUDS DO NOT NEED TO EXTEND TO DECK <br />BACK TO STRUCTUREABOVE; <br />RECESSEDJ, ALL PARTITION WITH ELECTRIC PANELSAND TOILET SHALL BE 6" STUD <br />K. FOR FLOOR TRACK BRACING, LOADING, AND DEFLECTION SYSTEM ISOLATION, SEE 10/A3.2.2 <br />L. PROVIDE EXPANSION <br />N. PIROVIDE LATERAL BRACING AT NON -LOAD -BEARING METAL STUD WALLS PER 8/A3.2.2 <br />Portland, OR <br />503,224.9560 <br />Vancouvev, WA <br />360.695.7879 <br />Seattle, WA <br />206.749.9993 <br />www,mcknze.com <br />DESIGN DRIVEN I CLIENT FOCUSED <br />Mechanical/Electrical <br />7301 REGISTERED <br />ARC, T CT <br />TERI ALLEN 'RAUSE <br />STATE OF WASHINGTON <br />MACKENZIE <br />2020 ALL RIGHTS RESERVED <br />THESE DRAWINGS ARE THE PROPERTY OF <br />MACKENZIE AND ARE NOT TO BE USED <br />OR REPRODUCED IN ANY MANNER, <br />WITHOUT PRIOR WRITTEN PERMISSION <br />Revision Schedule <br />I <br />Revwon Del# lssue Date <br />DRAWN BY: LEM <br />CHECKED BY: JGV <br />r — <br />SHEET <br />
The URL can be used to link to this page
Your browser does not support the video tag.