Laserfiche WebLink
12.41 n12 4'1�51 n1l 10.61 <br />n95 n9 n85 n8 n76 <br />n64 n6 n5.5 <br />n35 n3 n2 n15 n1 <br />Y <br />594' - 0" <br />29'-0" <br />23'-0" <br />26'-0" <br />26'-0" <br />23'-0" <br />29'-0" <br />26'-0" <br />26'-0" <br />26'-0" <br />26'-0" <br />28'-0" <br />24'-0" <br />33'-0" <br />19,-0" <br />26'-0" <br />26'-0' <br />26'-0" <br />26'-0" <br />26'-01' <br />26'-0" <br />22'-0" <br />26'-0" <br />26'-0" <br />CP20CCC <br />.....■■�&11 . <br />►A/ATCO RAC71=0 <br />( <br />I <br />—• ---- vrv�V1L__ --- -. _. <br />138 143 148 <br />LOSS. M ENS EGRESS ------------- � <br />CCTV PREVENTION KSP SEAFOOD — <br />137 I MANAGERS i I 144 I 147 COOLER I' I ELECTRIC --^ I I I 1 I �_____ _ J l I I I TENANT TRASH I STORAGE I <br />136 139 142 <br />149 _153 i tLJ 165 166 <br />- _ - --- -- - — ——_._---- - --- i <br />L— - - ----------- — - .---------------- .� <br />PRICE CHANGE { r------ ---- PRODUCE GROCERY (il �� J HOME <br />{; F <br />I I h I 11 COOLER FREEZER I I I I I ! I STOCKROOM I I I I <br />135 al ! APPAREL' _ _ MEAT COOLER 1 I <br />STOCKROOM j <br />MEAT PREP JANITOR I : EGRESS <br />1 i. 152 154 155 164 <br />BREAK ROOM <br />! 151 0 ��L <br />11 I I ! — _--__ __ . STOCK 160 , 163 <br />CV J f 1 �. i, A a t\ gill , I ;! 1 <br />FINISH FLOOR PLAN <br />lot = 20'-011 <br />GENERAL NOTES <br />A. <br />FOR MATERIAL CALLOUTS, SEE SPECIFICATIONS <br />L. SEE ASDs FOR WATERPROOF MEMBRANE AT RESTROOM FLOORS <br />B. <br />IN APPAREL PROVIDE BASE WB-001 AT ALL WOOD FIXTURES IF NEW AND PER PLAN. ALL OTHER <br />M. REMOVE & REPLACE SEALANT AT EXPOSED CONCRETE CONTROL JOINTS <br />AREAS (i.e. PAINT DESK, CUSTOMER SERVICE DESK, CHECKSTANDS, MISCELLANEOUS WOOD <br />N. PROVIDE JOINT FILLER IN CONCRETE SLAB CONTROL JOINTS UNDER NEW RESINOUS FLOORING <br />FIXTURES, WAINSCOTING, SALES SIDE OF DAIRY COOLER, AND TOP OF CONCRETE CURBS AT ALL <br />O. ALL INTERIOR BOLLARDS ON SALES FLOOR AT STOCKROOM ENTRIES TO BE PAINTED BLACK <br />ENTRIES) SHALL REQUIRE WB-001. WHERE THE TOE KICK OF FIXTURE WILL ACCEPT A 4" BASE, <br />P. RODENT INSPECTION STRIPE - PROVIDE 8" WIDE PAINT STRIPE ON THE FLOOR BEHIND PALLET <br />PROVIDE SUCH. ALL OTHER AREAS SHALL REQUIRE A 6" BASE. SEE ASDs FOR MORE <br />RACKING, STOCK AREAS, AND BACKROOM AND DOCK AREA ON FLOOR ADJACENT TO THE <br />INFORMATION <br />EXTERIOR WALL EXCEPT FOR COOLER AND FREEZER AREAS <br />C. <br />PROVIDE BASE ON FIXTURE OR COLUMN FURRING <br />Q. DEMO (E) COLUMN WRAPS. (N) WRAPS WITH PAINT ABOVE. <br />D. <br />EXTEND POLISHED CONCRETE 6" BEYOND CARPET TRANSITION <br />R. EXISTING CONCRETE SLAB TO BE DYED AND POLISHED AS REQUIRED THAT HAS BEEN EXPOSED <br />E. <br />GC TO COORDINATE FINAL FLOOR TRANSITION LOCATIONS, INCLUDING OWNER'S VENDORS <br />WITH FIXTURE MOVE. <br />F. <br />VERIFY ALL TILE ALIGNMENTS PER PLAN WITH FIXTURE LOCATIONS AND DIMENSIONS PRIOR TO <br />START OF WORK <br />G. <br />ALL EXISTING POLISHED CONCRETE AT SALES AREA TO BE REPOLISHED. GC TO MOVE ALL <br />EXISTING FIXTURES AS REQUIRED TO POLISH ENTIRE SALES FLOOR <br />H. <br />ENSURE ALL COVER PLATES, ACCESS PANELS, CONDUIT, DRAINS, AND OTHER FLOOR <br />ACCESSORIES ARE LEVEL AND FLUSH WITH ADJACENT FLOOR FINISH, LINO <br />1. <br />PROVIDE NEW FLOORING TRANSITIONS AS REQUIRED BY ASDs <br />J. <br />WHERE STOCKROOM FLOOR IS ADJACENT TO SALES FLOOR, CONTINUE SALES FLOOR FINISH <br />X-O" MIN. INTO STOCK ROOM <br />K. <br />OWNER'S FLOOR FINISH VENDOR SHALL PROVIDE THE FOLLOWING: <br />1. NEW POLISHED CONCRETE FINISH WHERE SPECIFIED <br />2. TEMPORARY POWER AS INDICATED IN THE ELECTRICAL PLANS <br />3. ON -SITE COORDINATION OF OWNERS FLOOR FINISH VENDOR <br />4. SHUT DOWN OR REDIRECTION OF HVAC SYSTEMS IN AREAS WHERE FLOOR GRINDING AND <br />POLISHING IS OCCURRING <br />5. REMOVAL AND REPLACEMENT OF ALL REFRIGERATED CASE KICK PLATES AND ASSOCIATED <br />ACCESSORIES IN ORDER TO ENSURE NEW FINISHES CONTINUE UNDER (E) EQUIPMENT <br />6. COORDINATION AND REMOVAL, IF NECESSARY, OF EXISTING UTILITIES <br />KEYNOTES <br />09-03 PATCH AND REPAIR RESINOUS FLOOR AS REQUIRED FOR NEW CASE LINEUP <br />09-12 (N) CARPET TILES AND TRANSITION STRIPS - BID ALTERNATE 1 <br />LEGEND <br />EXISTING <br />FINISHES TO REMAIN <br />NO WORK IN THIS AREA, <br />EXISTING TENANT TO <br />REMAIN, CONTRACTOR TO <br />ENSURE WORK DOES NOT <br />DISTURB TENANT. <br />(E) FLOOR TO BE STEAM <br />CLEANED <br />NEW <br />(E) CONCRETE SLAB TO RECEIVE <br />A FINAL BUFF/POLISH TO THE <br />STANDARD GLOSS READING <br />\\ <br />(E) CONCRETE SLAB TO BE <br />SEALED <br />a< <br />(N) GRAY CONCRETE <br />SLAB TO BE POLISHED <br />(N) GRAY CONCRETE <br />SLAB W/ ANTI -SLIP FINISH <br />❑❑❑❑❑❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />CARPET TILE <br />❑❑❑❑❑❑ <br />CERAMIC TILE <br />■ ■ <br />Architecture IS Interiors <br />Planning . Engineering <br />Portland, OR <br />503.224.9560 <br />Vancouver, WA <br />360.695.7879 <br />e the WA S a , <br />206.749.9993 <br />www.mcknze.com <br />MACKENZIE. <br />DESIGN DRIVEN I CLIENT FOCUSED <br />Client <br />FRED MEYER <br />STORES INC <br />3800 SE 22ND AVE <br />PORTLAND, OR 97202 <br />F mew. <br />Project <br />FRED MEYER #458 <br />MILL CREEK <br />12906 BOTHELL- <br />EVERETT HWY <br />EVERETT, WA 98208 <br />Mechanical/Electrical <br />7301 REGISTERED <br />ARC CT <br />TE W?ALLEN KRAUSE <br />STATE OF WASHINGTON <br />------------ <br />MACKENZIE <br />2020 ALL RIGHTS RESERVED <br />THESE DRAWINGS ARE THE PROPERTY OF <br />MACKENZIE AND ARE NOT TO BE USED <br />OR REPRODUCED IN ANY MANNER, <br />WITHOUT PRIOR WRITTEN PERMISSION <br />Revision Schedule <br />Revision Delta I Issue Date <br />SHEET TITLE: <br />FINISH FLOOR <br />PLAN <br />DRAWN BY: LEM <br />CHECKED BY: JGV <br />SHEET <br />Al 6 <br />■ <br />CITY OF EVERETT <br />REVIEWED ED FOR � PERMI <br />JOB NO. 2190236.00 <br />PERMIT SET: 02.17.20 <br />CAUsers\s0kDocumentslRevit ProiectslARCHITECTURAL1219023600 - FM 458 Mill Creek1236-FM MILL CREEK-L.rvt 21171202011:52:54 AM As <br />