Laserfiche WebLink
RACK A CONTROLLER <br />RACK B/C CONTROLLERS <br />TO RESPECTIVE <br />BOARD IN RACK <br />CONTROL PANEL <br />i <br />E <br />F <br />I <br />CD'0(Daa �� (D� � EXISTING NEW LEAK I / <br />molGimommmmem(M V amMmMMmm@Me1Dffl V CONDENSER DETECTION <br />Mae @190090mmamelmmo Mai VSD'S Pf\i`JEL <br />000P230MIMM DMID Mmal 11013EIM%l©E OMF9 Mae i <br />MISS ECIMSOMM 00mm mam <br />{ 5562�21=1123S flan seel 81250 f0s80 <br />CPC RX-400 CPC RX-400 � <br />F2 CONTROLLER E2 CONTROLLER \ / 3) <br />\l (� \1 <br />i <br />- 4 L a n <br />tea d ° d n Qa d v ° , J - ° v ° 4 a _ v°4 ° <br />COMPRESSOR AREA. <br />EXHAUST FANS <br />INTER! OCKED WITH <br />AN AC UNIT —� <br />7 <br />I INE VOLTAGE TO <br />EXHAUST FAN <br />J JUNCTION BOX FOR CONTROL TRANSFOMER <br />\—ELECTRICAL CONTRACTOR TO PROVIDE 3/4"C <br />FROM THE CONTROL TRANFORMER PANEL TO <br />A JUNCTION BOX FOR CONNECTIONS TO EMS <br />SYSTEM. SEE DELI HOOD DETAIL FOR DELI <br />HOOD CONTROL PANEL. <br />10 <br />3 <br />TO ENVIROMENTAL CONTROL PANEL. <br />ENVIRONMENT CONTROL PANEL <br />'PC BX <br />CONTROLLER <br />GENERAL NOTES: <br />DETAIL 1 IS DI,AGRAiMMATIC IN NATURE AND IS INTENDED TO ``5 <br />CONVEY INSTALLATION REQUIREMENTS <br />REGARDING THE ENERGY MANAGEMENT CONTROL SYSTEM. THIS <br />DRAWING IS PICTORIALLY DRAWN FOR <br />CLARIFICATION PURPOSES ONLY, DO NOT SCALE. THIS DRAWING <br />IS GENERIC AND NOT ALI_ COMPONENTS <br />SHOWN ARE REQUIRED FOR INSTALLATION. REFER TO <br />RESPONSIBILITY CHARTS, DETAIL 1/SHEET EMI, FOR <br />FINAL EQUIPMENT AND INSTALLATION REQUIREMENTS. REFER TO <br />OTHEREM SHEETS WHERE THESE DEVICES ARE CALLED OUT TO <br />BE USED IF ANY. <br />REFRIGERATION ALARM <br />ANNUCIATOR PANEL <br />TYPICAL OF SMAI L 1pll� SDI - <br />H.V.A.C. UNITS v_s r <br />TO FNVIRONMENTAL <br />CONTROL PANEL <br />TO BX Q <br />CONTROIER <br />�9 <br />AKC <br />TO RESPECTIVE POINTS <br />ON BOARD INSIDE RTU <br />CABINET. SEE DETAIL 3 <br />ON EM8. <br />CPC MULTIPLEX 88AO (VENDOR INSTALLED, <br />/ NEW; CONTRACTOR INSTALLED, EXISTING) <br />INSIDE RTU CABINET. SEE DETAIL 3 ON EM8 <br />FOR INPUT CONNECTIONS. <br />I`\\­�_ <br />TO / FROM OTHER RTU <br />BOARDS AS REQUIRED <br />DOCK SENSOR DOCK <br />(S s HFAT EF, <br />` <br />- SEE DETAIL 2/EM8 TYPICAL OF UH <br />1-8,10 <br />I <br />TO RESPECTIVE BX <br />POINT 13 - <br />INPUT <br />TO RESPECTIVE BX <br />OUTPUT POINT <br />(INFO ONLY) <br />TO ENVIRO <br />IMENTAL <br />ALARM <br />CONTROI IANEI <br />111 <br />PANEL <br />� 1� <br />TO RTU REI AY MODULES <br />02 FROM DUCT SMOKE DETECTOR(S) 8 8 <br />IRLDS/REFRIGERTION ALARM <br />STOCK ROOM LTG / <br />OVERRIDE BUTTON / <br />v v a d J -, <br />1 �i ENERGY MANAGMEINT SYSTEM REQUIRMENTS <br />TO RESPECTIVE P,X <br />CONTROLLER INPUT <br />Dn[,\ITC <br />GENERAL NOTES: KEY NOTES: <br />1. THE EMS-C SHALL BE RESPONSIBLE FOR THE COMPLETE INSTALLATION OF THE ENERGY O COORDINATE WITH FIRE A RM CONTRACTOR AND KROGER PROJECT MANAGER FOR THE FIRE <br />AL ARM SYSTEM AND STORE SECURITY ALARMS. <br />MANAGEMENT SYSTEM (EMS). THIS SHALL INCLUDE, BUT NOT BE LIMITED TO THE START-UP, PUNCHDOWN <br />AND PROGRAMMING ADJUSTMENT OF THE ENTIRE CPC CONTROL SYSTEM THAT IS LISTED IN EMS-C SCOPE, INCLUDING 0 CONTRACTOR TO COORDINATE REQUIRED DUCT SMOKE DETECTORS AND CONDUCTORS WITH FIRE <br />HVAC AND LIGHTING CONTROL. ALARM CONTRACTOR/KROGER PROJECT MANAGER. <br />2. THE EMS-C SHALL PROVIDE ALL COORDINATION BETWEEN THE VARIOUS TRADES, INCLUDING REFRIGERATION, G SEE NETWORK LOOP DIAGRAM SHEET EMI. CONNECT COM LOOP TO CORRECT CONTROLLER <br />HVAC AND ELECTRICAL TO ENSURE THAT ALL EQUIPMENT IS PROPERLY CONTROLLED AND THAT ALL <br />CONTROL POINTS HAVE BEEN ACCOMMODATED. THIS SHALL INCLUDE VERIFYING AIL HVAC EQUIPMENT TO VERIFY VOLTAGE. VAIVE SHIPPED LOOSE FROM MANUFACTURE. COORDINATE WITH KROGER <br />BE CONTROLLED, VERIFYING ALL STAGES OF HEATING, COOLING, HEAT RECLAIM, TWO SPEED FANS, LIGHTING 0 PROJECT MANAGER. <br />CONTROLS, ETC. AND ENSURING THAT ADEQUATE SENSORS HAVE BEEN SUPPLIED TO ENABLE PROPER <br />CONTROL OF THE SAME 5 CONTACTOR COILS TO BE 120 VOLT WITH 24 VOLT CONTROL RELAYS. <br />3. UPON COMPLETION OF THE EMS INSTALLATION, THE EMS-C SHALL PROVIDE ACCURATE AND COMPLETE 06 AS -BUILT DOCUMENTATION TO THE OWNER AND THE ENGINEER. THIS DOCUMENTATION MUST INCLUDE AN SEE DETAIL 5/EM4. <br />30"X42" PION INDICATING THE LOCATIONS OF ALL OF THE CASE CONTROLLERS PROBES, SENSORS, RELAYS, SEE THE MECHANICAL SCHEDULE FOR FAN AND AC UNIT INTERLOCKS. <br />REMOTE 1/0 BOARDS, CONTROLLERS, MODEM AND REFRIGERANT LEAK SENSORS FOR THE ENTIRE EMS <br />INSTAI LATION INCI UDING REFRIGERATION, HVAC AND LIGHTING. THE EMS C SHALL ALSO FURNISH AND 8 PROVIDE AND INSTALL HOSES AND STROBES AS REQUIRED FOR REFRIGERATIONI UNITS. VERIFY <br />INSTAI L AN 8" X1 I " SHEET WITH COMPLETE PRINTOUT SHOWING TERMINATION POINTS, BOARD LAYOUTS AND INITIAL CONTROL SET WORKING CONDITION OF EXISTING AND REPLACE AS REQUIRED. SEE Dv13 FOR LOCATIONS <br />POINTS FOR HVAC AND LIGHTING CONTROL. POST EACH SHEET ADJACENT TO EACH REFRIGERATION CONTROLLER OR BUILDING CONTROLLER. <br />a ONCE THE NEW CONTROL SYSTEM HAS BEEN INSTALLED AND THE HVAC SYSTEMS ARE READY TO BF <br />BROUGHT ON LINE, THE HVAC-C MUST PROVIDE THE NECESSARY SUPERVISION FOR STARTUP OF THE <br />CONTROL SYSTEP,jj ^ND COORDINATE START-UP WITH EMS-C. THE HVAC-C MUST ENSURE THAT ALL LEGEND <br />THE HVAC SYSTEMS ARE OPERATING CORRECTLY AND PROVIDE ANY FINE TUNING OF -THE SYSTEM THAI IS <br />REQUIRED. - - OEM INSTALLED WIRING <br />5. DETAIL 1 IS DIAGRAMMATIC IN NATURE AND IS INTENDED TO CONVEY INSTALLATION REQUIREMENTS FIELD INSTALLED WIRING <br />REGARDING THE ENERGY MANAGEMENT CONTROL SYSTEM. THIS DRAWING IS PICTORIALLY DRAWN FOR — — — -- — EXISTING DEVICE OR WIRING <br />CLARIFICATION PURPOSES ONLY, DO NOT SCALE, THIS DRAWING IS GENERIC AND NOT ALL COMPONENTS <br />SHOWN ARE REQUIRED FOR INSTALLATION. REFER TO RESPONSIBILITY CHARTS, DETAIL 1/SHEET EMI, FOR EQUIPMENT NOTE <br />FINAL EQUIPMENT .AND INSTALLATION REQUIREMENTS. REFER FOR TO FM-3 AND EM-6 WHERE THESE DEVICES — -� <br />ARE CALLED OUT TO BE USED IF ANY. <br />REFER TO EMERSON INSTRUCTION MANUALS OR EMEP,SON.COM FOR INFORMATION <br />6. REFRIGERATION CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REFRIGERATION ISSUES REGARDING REGARDING CPC CONTROL COMPONENTS (I.E. INPUT/OUTPUT BOARDS, ELECTRICAL <br />REFRIGERATED CASES, EVAPORATOR COILS, REFRIGERATION CONDENSERS, PREP ROOM REFRIGERATION, REQUIREMENTS, ETC.). <br />COMPRESSOR RACKS AND 'HOT 'WATER RECLAIM. IT SHALL BE THE RESPONSIBILITY OF THE REFRIGERATION RTU'S ARE SHUT DOWN, VIA THE E2 CONTROLLER/EMS PANEL, UPON SIGNAL FROM SMOKE DETECTORS. <br />CONTRACTOR TO ENSURE A FULLY OPERATIONAL SYSTEM. INCLUDING PROGRAMMING THE MAIN CONTROLLER FOR <br />CIRCUITS, VERIFY CASE TEMPERATURE, MAKING PROGRAMMING ADJUSTMENT, ADDII"IC DELETING DEFROST SCHEDULE. REFER TO <br />REFRIGERATION INSTALLATION SPECIFICATIONS 114143 SECTION 3.7(N). SEE DETAIL 1/SHEET EMI FOR IvJORE <br />INFORMATION REGARDING CONTRACTOR RESPONSIBILITIES. <br />7. LOW VOLTAGE EMS CONTROL WIRING AND CONNECTIONS BY EMS-C. ALL OTHER HIGH VOLTAGE WIRING <br />SHALL BE BY THE GENERA CONTRACTORS OR ELECTRICAL CONTRACTOR (UNLESS OTHERWISE NOTED), <br />8. REFER TO REFRIGERATION LEGENDS FOR INFORMATION REGARDING FIXTURE, WALK-IN COOLER/FREEZERS, <br />EVAPORATORS, CONDENSERS AND RECLAIM REQUIREMENTS. <br />; 2 E1IERGY MANAGE- M FFENT GENERAL NOTES SCALE: NONE <br />TO RESPECTIVE POINTS <br />ON BOARD INSIDE RTU <br />TO RESPECTIVE AUX CABINET. SEE DETAIL 9 <br />INPUT POINT IN HVAC CON A I CONTROL BOARD. SEE EMT, <br />DETAIL 6/EM8 3� <br />CPC IMULTIFLEX RTU+ (VENDOR INSTALLED, <br />/-MOUNT ON RTU FACING NEW; CONTRACTOR INSTALLED, EXISTING) <br />NORTH —� INSIDE RTU CABINET. SEE DETAII 9 ON <br />EM8. <br />LLS e A — -- <br />�� HVAC UNIT <br />LOCATED ABOVE <br />PHARMACY <br />TYPICAL OF LARGE <br />PM SD " 4S IF � 88A0 <br />H. J.A.C. UNITS BOARD <br />TO /FROM OTHER RTU <br />BOARDS AS REQUIRED <br />7� % �� A i K O / I� i / \ / �� 171 1 <br />TO RESPECTIVE RX <br />CONTROLLER INPUT <br />POI INTS <br />]F� _ 2I I e TO REMAINING <br />SEE DETAIL 1/EM8 RH S ROOFTOP UNITS <br />2 <br />SEE DETAIL 2/EM8 <br />— - TO CPC SPACE TEMP SENSOR <br />6 WITH SI ME BAR & WALL <br />5 ENCLOSURE, <br />LOCATED IN PHARMACY. <br />FROM RESPECTIVE <br />RACK OUTPUT POINTS <br /><1 10 <br />SS EPR <br />HS IT <br />-55 <br />DS <br />- I WALK-IN FREEZER,/COOLER <br />EVAPORATOR COIL (EVAPORTATOR <br />COILS ARE ALSO IN PREP. AREAS) - <br />IRLDS - WIRING TO <br />RESPECTIVE CONTROLLER <br />INPUT POINTS <br />RIDS - TUBING THE UNIT <br />LEAK DETECTION UNIT <br />WALK-IN FREEZER/COOLER <br />° <br />TO RESPECTIVE <br />RACK INPUT POINTS FROM RESPECTIVE <br />RACK OUTPUT POINTS <br />TO CONDENSER <br />CONTROL PANEL <br />TO CONDENSER <br />CONTROL PANEL CONDENSER CONTROL <br />TYPICAL CONDENSER BOARD. <br />OEM INSTALLED <br />BOARD. <br />LIQUID LEVEL SENSOR TQ <br />CONDENSER CONTROL PANEL <br />INPUT POINT. <br />AMBIENT TEMPERATURE TYPICAL <br />PER CONDENSER. SEE DETAIL <br />9/EIv14. TO CONDENSER <br />CONTROL PANEL INPUT POINT. - <br />DEDICATED RH SENSOR FOR PMAC <br />SYSTEM. MOUNT IN FROZEN FOOD <br />REACH -IN AREA. SEE EM6 FOR <br />I LOCATION. <br /><5> m <br />I <br />TO RESPECTIVE POINTS <br />ON BOARD AC-1. <br />THESE �3� BX CONTROL WIRING ARE AN <br />ENLARGED EXAMPLE OF < > & <�> ON LARGE RTU <br />TO RESPECTIVE <br />FROM RESPECTIVE <br />TO RESPECTIVE <br />FROM RESPECTIVE <br />RACK INPUT POINTS <br />RACK OUTPUT POINTS <br />RACK <br />INPUT POINTS <br />RACK OUTPUT <br />POINTS <br />TO EMS PANEL OR <br />1/0 BOARD. <br />\ J 3 <br />10 <br />EI-R <br />SALE FLOOR LTG <br />REF. CASES <br />TYPICAI <br />OVERBID <br />BUTTON <br />THAT HAVE <br />REF RIGERTED <br />A <br />IN STOCK <br />ROOM <br />HIGHER EVAP. <br />GLASS DOOR <br />OVERRIDE <br />BUTTON <br />THAN REST OF <br />FIXTURE <br />RACK BY AT <br />I EAST 5' F. <br />ROUTE TO OTHER CASES ROUTE TO OTHER CASES ROUTE TO OTHER CASES,j <br />AS INDICATED ON PLANS AS INDICATED ON PLANS AS INDICATED ON PLANS <br />T-SCALENONE <br />Portland, OR <br />503.224.9560 <br />Vancouver, WA <br />360.695.7879 <br />Seattle, WA <br />206.749.9993 <br />www.mcknze.corn <br />MACKENZIE. <br />DESIGN DRIVEN I CLIENT FOCUSED <br />Client <br />FRED MEYER <br />STORES, <br />ROAD, <br />PORTLAND, OR 97202 <br />° # ��NOft <br />MACKENZIE <br />2019 ALL RIGHTS RESERVED <br />THESE DRAWINGS ARE THE PROPERTY OF <br />MACKENZIE AND ARE NOT TO DE USED <br />OR REPRODUCED IN ANY MANNER, <br />WITHOUT PRIOR WRITTEN PERMISSION <br />Revision Schedule <br />RevIssue Date <br />DRAWN BY: GI <br />CHECKED BY: WC <br />SHEET <br />