Laserfiche WebLink
LABOR ESTIMATE, HDR ENGINEERING STAFF <br />City of Everett:  Everett Reservoir No. 3 Replacement <br />Project Role <br />Billing Rate <br />100 <br />1. Project Mgmt Plan (PMP) / Quality Mgmt Plan (QMP) <br />2. Coordinate and Manage the Project Team <br />3. Subcontract and Manage the Project Subconsultants <br />4. Invoicing / Status Reporting <br />5. Monthly Project Meetings (Up to 48) <br />6. Monthly Conference Calls (Up to 48) <br />7. Project Kickoff Meeting (3 HDR + Tom and Sandy) <br />8. PARR and Quarterly Review Meetings (up to 12) <br />9. Implementation of QMP <br />200 <br />1. System-Wide Hydraulic Analysis <br />2. Hydraulic Analysis Workshop <br />3. Draft Preliminary Design Report (PDR) <br />3.e Stormwater Memorandum <br />3.g Preliminary Geotechnical Design Report (PGDR) <br />3.j Class 4 Estimate <br />4. Draft PDR Workshop (3 HDR + Tom and Sandy) <br />5. Final Preliminary Draft Report <br />300 <br />1. Structural Design Calculations <br />2.1 30% Drawings <br />2.2 30% Specification List <br />3. 30% Design Review Workshop <br />4.1 60% Drawings <br />4.2 60% Specifications <br />4.3 Class 3 Estimate <br />5. 60% Design Review Workshop <br />6.1 90% Drawings <br />6.2 90% Specifications <br />6.3 Class 2 Estimate <br />7 Update PDR into Basis of Design Report <br />8. Stormwater Report <br />9. 90% Design Review Workshop <br />10.1 Issued for Construction Drawings <br />10.2 Issued for Construction Specifications <br />10.3 Class 1 Estimate <br />400 <br />1. Respond to Bidder's Questions <br />2. Pre-Bid Meeting <br />3. Prepare Addenda (up to 7) <br />4. Review Bids and Check References <br />5. Prepare Conformed Documents <br />500 <br />1. Structural Design Calculations <br />2.1 30% Drawings <br />2.2 30% Specification List <br />3. 30% Design Review Workshop <br />4.1 60% Drawings <br />4.2 60% Specifications <br />4.3 Class 3 Estimate <br />5. 60% Design Review Workshop <br />6.1 90% Drawings <br />6.2 90% Specifications <br />6.3 Class 2 Estimate <br />7. Update PDR into Basis of Design Report <br />8. Prepare Phase 2 Stormwater Report <br />7. 90% Design Review Workshop <br />8.1 Issued for Construction Drawings <br />8.2 Issued for Construction Specifications <br />8.3 Class 1 Estimate <br />600 <br />1. Respond to Bidder's Questions <br />2. Pre-Bid Meeting <br />3. Prepare Addenda (up to 7) <br />4. Review Bids and Check References <br />5. Prepare Conformed Documents <br />700.1 <br />1. PLA/CWA Educational Workshop <br />2. Draft PLA/CWA Evaluation and Recommendation Report <br />3. Present Report Findings to City Staff <br />4. Provide Assistance in PLA/CWA Decision <br />700.2 <br />1. Develop Public Engagement Plan <br />2. Prepare Information Materials <br />3.Community Briefings (up to 10) <br />4. Public Meetings (up to 6) <br />700.3 <br />1. DOH Kickoff Meeting <br />Project Management <br />Preliminary Design Report <br />Phase 1 Design Phase Services <br />Phase 1 Bid Phase Services <br />Phase 2 Design Phase Services <br />Phase 2 Bid Phase Services <br />PLA/CWA Assistance <br />Public Outreach <br />Permitting Support Services <br />Horkan, Thomas <br />E <br />Bails, Jamie <br />Lynn Danielski, Lisa C Malinowski, <br />Christopher A Jensen, Todd R Rincon, Isabel C <br />Johnston, Bruce <br />M <br />Anderson, <br />Brittany Lee <br />Sandstrom, <br />Dennis Karl <br />Shigaya, <br />Camryn Kotsuru <br />(Cami) <br />Ramirez- <br />Ambion, <br />Hernann <br />Raaberg, <br />Leanne N <br />Bredehoeft, <br />Peter R Jr <br />(Pete) <br />Hernandez, <br />Jasmine <br />Bonet, Ernesto <br />Julio <br />PLA/CWA Lead Permitting Lead Environmental Lead O&M Lead <br />Constructability <br />Lead Electrical QC I&C QC Document Controls Strat Comm Lead Public Outreach Public Outreach Graphics Estimating Lead Civil Estimator Electrical Estimator <br />537.09 144.00 206.02 336.67 317.66 316.13 312.00 148.83 240.58 94.21 152.00 142.94 312.54 108.86 280.00 <br />0000040401600000001218 285,754.38$ <br />4 10 1,922.62$ <br />144 31,855.20$ <br />164 34,021.60$ <br />144 23,726.64$ <br />192 43,513.44$ <br />96 23,316.48$ <br />24 5,806.08$ <br />72 16,807.48$ <br />40 40 12 372 104,784.84$ <br />0666600220001286856638127,428.66$ <br />467616,951.82$ <br />40122,429.18$ <br />4444 8 6 240 48,148.06$ <br />76 12,636.64$ <br />2 624.00$ <br />8 68 56 138 26,910.10$ <br />4 22 4,949.88$ <br />2222 2 72 14,778.98$ <br />0001818004600001581854889 903,017.16$ <br />4 1,248.00$ <br />272 49,635.84$ <br />26 5,230.34$ <br />4 16 3,498.36$ <br />1766 321,135.76$ <br />16 166 30,806.00$ <br />5343681 16,671.24$ <br />4 16 3,498.36$ <br />1502 272,140.20$ <br />8 126 23,486.30$ <br />5302869 13,995.80$ <br />18 18 2 90 23,959.20$ <br />4 246 42,217.32$ <br />4 16 3,498.36$ <br />404 73,850.64$ <br />4 40 7,524.82$ <br />5172149 10,620.62$ <br />000000000000000336 66,485.73$ <br />64 14,904.32$ <br />12 2,914.56$ <br />175 31,695.93$ <br />12 2,654.60$ <br />73 14,316.32$ <br />0001818002400001573833391 633,284.91$ <br />2 624.00$ <br />204 37,356.58$ <br />13 2,615.17$ <br />4 16 3,498.36$ <br />1194 218,990.80$ <br />2 56 10,795.34$ <br />5303273 15,115.80$ <br />4 16 3,498.36$ <br />1084 197,138.42$ <br />2 42 8,027.60$ <br />5263067 14,120.36$ <br />18 18 2 74 20,088.04$ <br />4 180 30,980.08$ <br />4 16 3,498.36$ <br />288 53,011.40$ <br />2 17 3,305.62$ <br />5172149 10,620.62$ <br />000000000000000336 66,485.73$ <br />64 14,904.32$ <br />12 2,914.56$ <br />175 31,695.93$ <br />12 2,654.60$ <br />73 14,316.32$ <br />80000000000000016 6,239.76$ <br />2 6 2,045.70$ <br />2 2 1,074.18$ <br />2 6 2,045.70$ <br />2 2 1,074.18$ <br />00000000214230240120000848135,132.30$ <br />24 20 5 55 10,855.92$ <br />40 40 40 126 22,748.10$ <br />50 50 15 135 22,441.40$ <br />100 180 180 60 532 79,086.88$ <br />07250000040000000211 37,547.51$ <br />8 1,943.04$ <br />Total <br />Labor <br />Hours <br />Total Labor Dollars <br />c:\pwworking\nat\d0210595\Everett Reservoir No. 3 Replacement ESTIMATE.xlsm Printed 11/17/202210:13 AM