Laserfiche WebLink
LABOR ESTIMATE, HDR ENGINEERING STAFF <br />City of Everett:  Everett Reservoir No. 3 Replacement <br />Project Role <br />Billing Rate <br />2. Prepare/Submit Project Report <br />3. Address/Respond to Project Report Comments from DOH <br />4. Submit Phase 1 90% Design/Respond to Comments <br />5. Submit Phase 1 Construction Drawings to DOH <br />6. Submit Phase 2 90% Design/Respond to Comments <br />7. Submit Phase 2 Construction Drawings to DOH <br />8. Submit Phase 1 Construction Completion Report (CCR) <br />9. Submit Phase 2 Construction Completion Report (CCR) <br />10. Provide Additional Permit Assistance as Needed <br />700.4 <br />1. Perform Ground Topographic Survey <br />2. Perform Sub-Surface Utility Locates (Up to X) <br />700.5 <br />1. Geotechnical Coordination <br />2. Geotechnical Task Management <br />3. Plan Geotechnical Field Exploration Program <br />4. Site Reconnaissance and Utility Locates <br />5. Subsuface Exploration Work Plan <br />6. Generate Boring Logs and Assign Laboratory Testing <br />7. Conduct Groundwater Monitoring <br />8. Evaluate Field and Laboratory Data <br />9. Generate Seismic Design Parameters <br />10. Foundation Recommendations <br />11. Lateral Earth Pressures Recommendations <br />12. Static and Pseudo-static Slope Stability Evaluation <br />13. Evaluate Shoring and Dewatering Recommendations <br />14. Geotechnical QA/QC <br />15. Miscellaneous Geotechnical Analysis and Support <br />16. Draft Geotechnical Engineering Report <br />17. Respond to Geotechnical Related Review Comment <br />18. Conduct Plan and Specification Review <br />19. Final Geotechnical Engineering Report <br />800 <br />Additional Services (5% of Contract Amount) <br />Task Total Hours <br />Task Total Fee <br />Survey Support Services <br />Geotechnical <br />Unanticipated Services <br />Horkan, Thomas <br />E <br />Bails, Jamie <br />Lynn Danielski, Lisa C Malinowski, <br />Christopher A Jensen, Todd R Rincon, Isabel C <br />Johnston, Bruce <br />M <br />Anderson, <br />Brittany Lee <br />Sandstrom, <br />Dennis Karl <br />Shigaya, <br />Camryn Kotsuru <br />(Cami) <br />Ramirez- <br />Ambion, <br />Hernann <br />Raaberg, <br />Leanne N <br />Bredehoeft, <br />Peter R Jr <br />(Pete) <br />Hernandez, <br />Jasmine <br />Bonet, Ernesto <br />Julio <br />PLA/CWA Lead Permitting Lead Environmental Lead O&M Lead <br />Constructability <br />Lead Electrical QC I&C QC Document Controls Strat Comm Lead Public Outreach Public Outreach Graphics Estimating Lead Civil Estimator Electrical Estimator <br />537.09 144.00 206.02 336.67 317.66 316.13 312.00 148.83 240.58 94.21 152.00 142.94 312.54 108.86 280.00 <br />Total <br />Labor <br />Hours <br />Total Labor Dollars <br />2 30 5,512.26$ <br />2 9 1,601.31$ <br />7 1,303.65$ <br />7 1,303.65$ <br />7 1,303.65$ <br />7 1,303.65$ <br />7 1,303.65$ <br />7 1,303.65$ <br />72 50 122 20,669.00$ <br />0000000000000000 -$ <br />0 -$ <br />0 -$ <br />0000000000000000 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0000000000000000 -$ <br />0 -$ <br />8.00 78.00 56.00 42.00 42.00 40.00 40.00 112.00 214.00 230.00 240.00 132.00 38.00 222.00 224.00 11883.00 <br />4,296.72$ 11,232.00$ 11,537.12$ 14,140.14$ 13,341.72$ 12,645.20$ 12,480.00$ 16,668.96$ 51,484.12$ 21,668.30$ 36,480.00$ 18,868.08$ 11,876.52$ 24,166.92$ 62,720.00$ 2,261,376.14$ <br />c:\pwworking\nat\d0210595\Everett Reservoir No. 3 Replacement ESTIMATE.xlsm Printed 11/17/202210:13 AM <br />Rates provided are for 2022 and subject to actual escalation.