Laserfiche WebLink
• • <br /> Tom Fuchs <br /> From: Darcy Whaley <Darcy@rodarteconstruction.com> <br /> Sent: Monday, February 24, 2020 11:15 AM <br /> To: Tom Fuchs <br /> Cc: Michael Kangas; Kevin Lawson;Jay Stone <br /> Subject: January 2020 Material Use Tax - Everett Station Project <br /> Attachments: 1917 Everett Station Material Use Tax 013120.pdf <br /> Hi Tom, <br /> Attached is the detail of our material purchases through 1/31/2020. <br /> Total material costs through 1/31 is$124,838.28 <br /> Materials costs through 12/31 (already submitted) is$81,068.98 <br /> Subtract: $124,838.28-$81,068.98=$43,769.30 <br /> Tax rate 9.8%of$43,769.30=$4,289.40 is what we will report and pay to DOR for our material use tax through <br /> 1/31/2020. <br /> Thanks, <br /> Darcy <br /> Darcy A Whaley <br /> Controller <br /> Rodarte Construction <br /> Main: 253-939-0532, ext 313 <br /> Direct: 253-750-5080 <br /> www.rodarteconstruction.com <br /> 1 <br />