My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2023-03-14
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2023-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:10:37 PM
Creation date
3/13/2023 9:08:44 AM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Notes
Project came over form Construction Maangement without Work Order #
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Tom Fuchs <br /> From: Darcy Whaley <Darcy@rodarteconstruction.com> <br /> Sent: Monday, February 24, 2020 11:15 AM <br /> To: Tom Fuchs <br /> Cc: Michael Kangas; Kevin Lawson;Jay Stone <br /> Subject: January 2020 Material Use Tax - Everett Station Project <br /> Attachments: 1917 Everett Station Material Use Tax 013120.pdf <br /> Hi Tom, <br /> Attached is the detail of our material purchases through 1/31/2020. <br /> Total material costs through 1/31 is$124,838.28 <br /> Materials costs through 12/31 (already submitted) is$81,068.98 <br /> Subtract: $124,838.28-$81,068.98=$43,769.30 <br /> Tax rate 9.8%of$43,769.30=$4,289.40 is what we will report and pay to DOR for our material use tax through <br /> 1/31/2020. <br /> Thanks, <br /> Darcy <br /> Darcy A Whaley <br /> Controller <br /> Rodarte Construction <br /> Main: 253-939-0532, ext 313 <br /> Direct: 253-750-5080 <br /> www.rodarteconstruction.com <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.