Laserfiche WebLink
• <br /> Cost Detail Report Posting Dates:1/1/2019- 1/31/2020 <br /> Company:01-Rodarte Construction Inc. <br /> Date )rnl-Seq ID&Name Trans# Cost Type Quantity UOM Unit Cost Cost Amt <br /> Project:1917-Everett Station Parking Expansion <br /> Cost Code:A02- SURVEYING <br /> 12/6/2019 APPUR-2013 0112-Westside Concrete 1340852-IN Material 13.00 <br /> Cost Code A02 Totals: 13.00 <br /> Cost Code:A09- CLEAR AND GRUB <br /> 11/21/2019 APPUR-1975 1224-Granite Construction 1713206 Material 2,160.22 <br /> 11/22/2019 APPUR-1975 1224-Granite Construction 1713427 Material 2,703.55 <br /> Cost Code A09 Totals: 4,863.77 <br /> Cost Code:A21- COMMON BORROW <br /> 11/14/2019 APPUR-1975 1224-Granite Construction 1708835 Material 198.35 <br /> 11/15/2019 APPUR-1975 1224-Granite Construction 1709747 Material 1,917.24 <br /> 11/18/2019 APPUR-1975 1224-Granite Construction 1710329 Material 2,704.28 <br /> 11/19/2019 APPUR-1975 1224-Granite Construction 1710521 Material 2,765.26 <br /> 11/20/2019 APPUR-1977 1224-Granite Construction 1712069 Material 2,735.94 <br /> 11/25/2019 APPUR-1997 1224-Granite Construction 1715310 Material 291.66 <br /> 12/6/2019 APPUR-1998 1224-Granite Construction 1720953 Material 103.18 <br /> 12/10/2019 APPUR-1998 1224-Granite Construction 1721780 Material 138.29 <br /> 12/17/2019 APPUR-2044 1224-Granite Construction 1737433 Material -134.55 <br /> 12/17/2019 APPUR-2044 1224-Granite Construction 1737434 Material 104.65 <br /> 12/17/2019 APPUR-2050 1224-Granite Construction 1725310 Material 134.55 <br /> 12/18/2019 APPUR-2013 1224-Granite Construction 1726038 Material 206.09 <br /> 1/3/2020 APPUR-2016 1224-Granite Construction 1732104 Material 2,808.05 <br /> Cost Code A21 Totals: 13,972.99 <br /> Cost Code:A24- 12in CPSSP Storm pipe <br /> 11/13/2019 APPUR-1975 0018-HD FOWLER&CO. 15334093 Material 4,287.01 <br /> 11/25/2019 APPUR-1977 0018-HD FOWLER&CO. I5343464 Material 297.32 <br /> 12/4/2019 APPUR-1984 1224-Granite Construction 1719374 Material 252.03 <br /> 12/13/2019 APPUR-2013 0018-HD FOWLER&CO. I5355160 Material 666.56 <br /> Cost Code A24 Totals: 5,502.92 <br /> Cost Code:A25- 12in di pipe <br /> 11/12/2019 APPUR-1975 0018-HD FOWLER&CO. I5332248 Material 4,083.62 <br /> Cost Code A25 Totals: 4,083.62 <br /> Cost Code:A27- AD)CB <br /> 12/17/2019 APPUR-2013 0444-El USA INC 110190108853 Material 1,911.85 <br /> Cost Code A27 Totals: 1,911.85 <br /> Cost Code:A28- CB TYPE 1 <br /> 11/14/2019 APPUR-1976 0222-OLDCASTLE 010233163 Material 1,949.25 <br /> 12/17/2019 APPUR-2013 0018-HD FOWLER&CO. 15357266 Material 178.57 <br /> 1/29/2020 APPUR-2044 0018-HD FOWLER&CO. 15378848 Material 260.80 <br /> Cost Code A28 Totals: 2,388.62 <br /> Cost Code:A30- CB FLOW CONTROL <br /> 11/14/2019 APPUR-1976 0222-OLDCASTLE 010233163 Material 716.30 <br /> 12/11/2019 APPUR-1998 0018-HD FOWLER&CO. 15353491 Material 235.30 <br /> Cost Code A30 Totals: 951.60 <br /> Cost Code:A31- CTE DRAIN STRUCTURE <br /> 11/14/2019 APPUR-1976 0222-OLDCASTLE 010233163 Material 1,175.80 <br /> Cost Code A31 Totals: 1,175.80 <br /> Cost Code:A32- STORMFILTER <br /> 1/29/2020 APPUR-2044 0018-HD FOWLER&CO. I5379142 Material 26,824.06 <br /> Cost Code A32 Totals: 26,824.06 <br /> Date&Time Printed:2/24/2020 11:02:50 AM Page:,.l' <br />