My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2023-03-14
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2023-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:10:37 PM
Creation date
3/13/2023 9:08:44 AM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Notes
Project came over form Construction Maangement without Work Order #
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> CONTRACT ROUTING COVERSHEET c) l-° <br /> To: Clerk's Office Date: 4/26/2021 <br /> From: Tom Fuchs Department: Public Works <br /> RE: Documents for Mayor's Signature <br /> HAS THE CONTRACTOR SIGNED THE AGREEMENT? Yes 0 No ❑ <br /> IS THE CONTRACT/AGREEMENT IN FINAL FORM AND READY FOR ROUTING? Yes 0 No 0 <br /> IS A "WET SIGNATURE"REQUIRED? IF SO, PROVIDE INSTRUCTIONS BELOW. Yes 0 No ❑ <br /> DO YOU NEED YOUR AGREEMENT NOTARIZED? Yes ❑ No 0 <br /> IL/STALL PAGE NUMBERS THAT REQUIRE THE MAYOR'S SIGNATURE/INITIALS AND/OR NOTARIZATION: I <br /> Please sign the two copies of the attached Certificate of Completion <br /> Please fill out completely(Enter n/a if not applicable): <br /> Project Title/Description of Service or Work Performed: Everett Station 80 Parking Expansion Project <br /> City Project Manager/Contact Person: Vincent Bruscas/Tom Fuchs in Construction Management <br /> Contractor/Agency: Rodarte Construction, Inc. <br /> Council Agenda Date: 5/12/2021 <br /> Original Date Approved by Council (if applicable): Award 9/18/2019 <br /> Contract End Date: Physical Completion 8/13/2020 <br /> Amendment/Supplemental/Change Order#: Final Acceptance <br /> Public Works WO Number: PW 1807--018 <br /> Contract No. (Federal,State,County): Urban Mobility Grant#GCB 2818/PIN 21070017 <br /> Total Compensation Amount: $1,098,743.37 <br /> PLEASE SELECT THE DOCUMENT TYPE: <br /> ❑ 1) Professional Services (PSA, Performer,etc.) ❑ 7) Lease/Use of Property <br /> ❑ 2)Grant(Applications, Human Needs, etc. ) ❑ 8) Real Property(Deed, Easement,Covenant, etc.) <br /> ❑ 3) Interlocal/Interagency ❑ 9) Purchase Agreement <br /> 0 4)Capital Contract(Construction) ❑ 10) Purchasing Cooperative Interlocal <br /> ❑ 5)Amendment/Change Order ❑ 11) Purchasing-JOC/Small Works <br /> ❑ 6) Resolution/Ordinance Exhibit ❑ 12)Technology(IT,Telecom,Software) <br /> Previous Action (if any): <br /> Any changes to the standard legal form: Yes ❑ No 0 <br /> Legal Approval (If applicable,who approved?): <br /> Project Description/Special Handling Instructions: <br /> This project involves Hot Mix Asphalt paved parking lot, repurposing of existing ecology block retaining wall, installing an <br /> underground stormwater detention system, modular wetland,significant fill,site preparation,erosion control,cement concrete <br /> curb&gutter,landscaping,irrigation system,channelization,chain link fence,bike lids,illumination system, handling of <br /> contaminated soils,and traffic control. <br /> Routing(for department use): <br /> Project Manager Vincent Bruscas Department Head Ryan Sass <br /> Construction Manager Tom Fuchs Finance Manager Matt Welborn <br /> Heather Magnuson <br /> FOR CLERK'S OFFICE USE(DISTRIBUTION): I <br /> Routing date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.