My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2023-03-14
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2023-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:10:37 PM
Creation date
3/13/2023 9:08:44 AM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Notes
Project came over form Construction Maangement without Work Order #
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ o <br /> � I <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE:August 13,2020 ADDRESS: 17 East Valley Hwy E <br /> CONTRACTOR: Rodarte Construction, Inc. CITY/STATE:Auburn,WA 98092 <br /> PROJECT TITLE: Everett Station Parking Expansion WORK ORDER NO. 1807-018 <br /> DATE WORK COMPLETE:August 13, 2020 FINAL AMOUNT: $1, 098,743.37 <br /> Inclusive of WA State Sales Tax <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been <br /> paid, and that I am authorized to sign for the claimant;that I have not rented or purchased any equipment <br /> or materials from any employee of the City; I further certify that the attached final estimate is a true and <br /> correct statement showing all the monies due me from the City of Everett under this contract; that I have <br /> carefully examined said final estimate and understand the same and that I hereby release the City of <br /> Everett from any and all claims of whatsoever nature which I may have, arising out of the performance of <br /> said 6 ontract,which are not set forth in said estimate. <br /> / , (fr1(t <br /> x x <br /> CONTRAC I R V TI o tIllittsiii <br /> Rodarte Construction,Inc. �•`��Q►�1.Rip ����, <br /> Subscribed and sworn to before me this lir h day of Lt -\ . 2020 �' <br /> CS <br /> KiACIAt PUSUC E <br /> Not ry Pub is ••may �•• <br /> in and for the State of Washington,residing at cy( sr‘ •� :It <br /> WA �o <br /> " t() •vs -4 <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final estimate to be <br /> based upon actual measurements and to <br /> be true and correct. APPROVED Date: -2o 2-t <br /> L <br /> X X_ -At <br /> Construction Manager Publ c Works Director <br /> Tom Fuchs Ryan Sass <br /> Revised 6/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.