Laserfiche WebLink
r i <br /> Public Works <br /> Everett Station 80 Stall Parking Expansion <br /> Rodarte Construction <br /> DAILY INSPECTION DIARY WORK ORDER#2019-2535 <br /> (1) DAY Monday DATE: 11-11-2019 WORK PERIOD: 7:30am to 3:30pm <br /> WEATHER: Rain TEMP. MAX 55°F: MIN 40°F: PRECIPITATION: 0% <br /> (2)NUMBER AND CLASS OF PERSONNEL EMPLOYED: <br /> 1 —Foreman <br /> 1-Operator <br /> (3) EQUIPMENT: <br /> NO. TYPE IHR NO TYPE IIR <br /> 1 Komatsu PC 228 Crawler Mounted 8 <br /> Hydraulic Excavator <br /> 1 CAT 4WD Articulated wheel Front Loader 8 <br /> 924G(#336) <br /> (4)WORK ACCOMPLISHED THIS DAY: <br /> RODARTE: <br /> Rodarte installed orange construction fence around the perimeter of the site. <br /> Rodarte started vegetation removal at transit station at 36th and Smith St. using the Komatsu PC 228. <br /> The company I.O. Environmental doing the soil remediation installed silt fencing and surveying for soil removal.There was <br /> umthatwas full of liquid,theyhave to find out if theycan pumpit out or if it is hazardous. GeoEngineers consultant is <br /> ap pump q g <br /> on-site doing the project management and soil testing. On-site representative: <br /> Nathan R.Solomon <br /> Phoe:206-518-141 Email: nsolomon@geoengineers.com <br /> Rain Event today_Y_Y/N TSEC Checked_NA YIN <br /> Traffic control checked at_NA_AM and NA_PM <br /> �-- — 11-11-2019 <br /> Shane Cavanah,Cons • sector DATE <br /> 1 <br />