Laserfiche WebLink
J�v <br /> . • 1 <br /> �r <br /> Public Works <br /> Everett Station 80 Stall Parking Expansion <br /> Rodarte Construction <br /> DAILY INSPECTION DIARY WORK ORDER#2019-2535 <br /> (1) DAY Tuesday DATE: 11-12-2019 WORK PERIOD: 7:30am to 3:30pm <br /> WEATHER: Rain TEMP. MAX 55°F: MIN 40°F: PRECIPITATION: 0% <br /> (2)NUMBER AND CLASS OF PERSONNEL EMPLOYED: <br /> 1—Foreman <br /> 1-Operator <br /> (3) EQUIPMENT: <br /> NO. TYPE H R NO TYPE H R <br /> Komatsu PC 228 Crawler Mounted 8 <br /> Hydraulic Excavator <br /> 1 CAT 4WD Articulated wheel Front Loader 8 <br /> 924G(#336) <br /> r(4)WORK ACCOMPLISHED THIS DAY: <br /> RODARTE: <br /> Rodarte continues vegetation removal at transit station at 36th and Smith St. using the Komatsu PC 228. Rodarte also <br /> removing existing ecology block wall(bid item no. 18)and stacking them on the south west corner of the project. <br /> The company I.O. Environmental doing the soil remediation at the south site behind the Gospel Mission.There was a pump <br /> that was full of liquid,they have to find out if they can pump it out or if it is hazardous. GeoEngineers consultant is on-site <br /> doing the project management and soil testing. On-site representative: <br /> Nathan R.Solomon <br /> Phoe: 206-518-141 Email: nsolomon@geoengineers.com <br /> Rain Event today_Y_Y/N TSEC Checked_NA_Y/N <br /> Traffic control checked at NA_AM and NA PM <br /> 11-12-2019 <br /> Joe Jirak,Construction Inspector DATE <br /> 1 <br />