Laserfiche WebLink
7r. <br /> fb ;it <br /> Public Works <br /> Everett Station 80 Stall Parking Expansion <br /> Rodarte Construction <br /> DAILY INSPECTION DIARY WORK ORDER#2019-2535 <br /> (1) DAY Wednesday DATE: 11-13-2019 WORK PERIOD: 7:30am to 3:30pm <br /> WEATHER: Light Rain TEMP. MAX 55°F: MIN 40°F: PRECIPITATION: 0% <br /> (2)NUMBER AND CLASS OF PERSONNEL EMPLOYED: <br /> 1 —Foreman <br /> 1-Operator <br /> (3) EQUIPMENT: <br /> NO. TYPE IIIZ NO TYPE HIZ <br /> I Komatsu PC 228 Crawler Mounted 8 <br /> Hydraulic Excavator <br /> 1 CAT 4WD Articulated wheel Front Loader 8 <br /> 924G(#336) <br /> (4)WORK ACCOMPLISHED THIS DAY: <br /> RODARTE: <br /> Rodarte continues vegetation removal at transit station at 36th and Smith St. using the Komatsu PC 228. Rodarte also <br /> removing existing ecology block wall(bid item no. 18)and stacking them on the south west corner of the project. <br /> Meeting with inspector and foreman at 9am: Located WSDOT storm drain manhole under the I-5 overpass. There are <br /> several manholes some are WSDOT and some are City of Everett. Lids were removed and manholes verified to be the <br /> correct ones for the storm drain tie-in. <br /> Inspector left at 10am due to being sick. <br /> Rain Event today_Y_Y/N TSEC Checked NA Y/N <br /> Traffic control checked at_NA_AM and_NA_PM <br /> • <br /> Ci� e � <br /> 11-13-2019 <br /> Joe Jirak,Construction Inspector DATE <br /> 1 <br />