Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 9/15/2022 <br />City Of Everett Permit Services <br />Public Works Permit N: PW2209.010 <br />3200 Cedar Street, 2"°Floor Associated Bldg Permit N: <br />E V E R E T T Everett, WA 98201 Planning Reference N: <br />WASH NGTON everettwa.eov/permits Public Works Fee: $65.00 <br />Permitservicesgeverettwa.eov schedule mspectlons at; ommesermits.everettwagov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />WINCO FOODS, LUC BRANDONJOHNSON <br />PO BOX 5756 <br />BOISE, ID 83705 <br />PHONE: 20N591993 PHONE: 3602696346 <br />SITE ADDRESS: 990019TN AW SE TAX PARCEL ID in 28051800d05000 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: MODIFY POND OVERFLOW/UPPER POND BERM -AT WINCO <br />NOTES: INSTALL BACKWATER VALVE IN EXISTING STORMWATER CONVEYANCE SYSTEM <br />PERMOCONDITIONS: <br />1. All Inspections shall be scheduled online at httos://ondner ermits.everettwa.Rov. Available inspection dates are shown in the dropdown <br />2.eAll work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />d. Site Civil Work to be done per plans and report approved by the City of Everett Public Works Department dated 01/19/2023. Approved plans <br />must remain on lob -site at all times. <br />5. Inspections are required for all stages of construction. Visit he Cil Online Permitting Portal at onlinepennits.everettwa.gov to formally <br />request all required inspections. A handout is provided at permit issuance with instructions on haw to request an inspection online. <br />6. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />>. Prior to any interruption to the public right -of way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained from <br />the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa gov and requires a traffic control plan to <br />be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />8. As-builts of storm system will be required to be submitted to the PW Inspector per City Design and Construction Standards and Specifications <br />for Development prior to final approval/close out of the permit. <br />9. Prior to permit closeout Provide an operations and maintenance manual for the WinCo drainage system to include pump design information <br />and operating instructions as well as any necessary requirements for operating and maintaining the ponds and conveyance systems. <br />10. This permit must be finaled in order to close out this permit. Request a final Inspection online by selecting PW 25-Site Final/Permit Close Out <br />within the Online Permitting Portal Inspection Requests when all Items have been completed for this permit. <br />Public Works permB Fare Breakdown: <br />Mist. Drainage Work.................$25A0 <br />PW Plan Review ........................$20.00 <br />PW Site Inspection....................$20.W <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the Cliff of Everett from airy and all <br />claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other right- <br />of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public Property, damaged thereby. <br />VALIDITY/UPIRATION: <br />Work authorized by this Permit must be Started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. This <br />permit may be canceled by the city upon any stoppage of work an this project over 1804ay duration. Each inspection extends the expiration date <br />180 days to keep the Permft open while work is active. <br />Page 1 of 1 <br />_APPLICANT/IOa SRE COPY _ADDRESS FILE _TRUSURm <br />