My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9900 19TH AVE SE WINCO FOODS 2025-03-27
>
Address Records
>
19TH AVE SE
>
9900
>
WINCO FOODS
>
9900 19TH AVE SE WINCO FOODS 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 1:11:38 PM
Creation date
4/4/2023 9:25:19 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9900
Tenant Name
WINCO FOODS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e City of Everett Permit Review <br />CheckMate° <br />Installation <br />Procedure <br />EYFREil5etu5: 610r Permit <br />M <br />01/19M/2023 23 6:54:10 PPM <br />6. Preparation <br />The CheckMate®Valve uses expantling damp(s)to exert pressure <br />outwards on the walls of the salve to wedge it in piece within the <br />pipe. The walls of the pipe should be clean and free of debris prior <br />to installation. <br />The valve should be inserted fully into the pipe so that no part of <br />Me cuff or bill Wants outside the pipe. Ensure that the valve is not <br />slanted at an angle with the bill pointing upwards or downwards. <br />The valve centerline should be parallel to the pipe centerline. <br />itleflexe Technologies recommends pinning the CheckMate°Vase <br />on all installations. See below. <br />Four pm-tlrilletl holes am provided in each expansion clamp. At <br />least one clamp should be pinned. On exposed pipe, holes can be <br />tlrilletl through the valve and pipe, <br />ed <br />and abolt runthrough <br />should <br />ld be used <br />with a nut. For buried pipe, silicon <br />or similar sealant shoultl be usetl <br />to seal bolts. <br />]. Lubrication <br />The outside of the valve can be lubricated with a water -based <br />lubricant prior to inserting the valve into the pipe. R the taping <br />procedure has been used, the surface of the tape can be lubricate to <br />aid insertion. <br />GWTIUN: Oo not use oetmieum-based lubricants on this <br />product or an the vulcanized rubber tape. <br />8. Plumb Lines and Arrows <br />The CheckMate° Valve arrives with a "top" arrow, "flow" arrow and <br />plumb lines, marked in white, at the 12:00 and 6:00 position of the <br />valve. Utilize this marking to orient the valve in the pipe, as well as <br />to ensure the valve is oriented correctly in pipe section. <br />9. Valve Orientation <br />The CheckMate' Valve must be installed in a horizontal pipe. Valves <br />4" —18" (nominal) are supplied with a single clamp. The clamp <br />turnbuckle should be oriented at top dead center as tlelinatetl by the <br />plumb line. <br />Valves 20"-60" (nominal) are supplied with two clamps. The <br />turnbuckles should be oriented 45-from the top center plumb line. <br />The 72" is supplied with three clamps. The turnbuckle for one clamp <br />to be at top center. The other clamps to be 45- to each side of top <br />center. <br />10. Insertion Into Pipe <br />Clamp to support the shape of Me cuff should be hand tight and <br />should be Wended outward, but only tight enough to loosely keep <br />the shape of the cuff during installation. <br />CAUTION: If you spend the clamp excessively at this slap it <br />will hinder or prevent the CheckMate"al being fully inserted <br />into the pipe. <br />CheckMate' Clamping Diagrams <br />Downstream Clamp <br />77 <br />Wwnebent Flanged <br />Hm <br />\ I / <br />Downstream Flanged Thimble Insert <br />y <br />I <br />Upstream Clamp <br />Fire <br />Upstream Flanged <br />i <br />flox I <br />I <br />i <br />Upstream Flanged Thimble Insert <br />Flow <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.