Laserfiche WebLink
e City of Everett Permit Review <br />CheckMate° <br />Installation <br />Procedure <br />EYFREil5etu5: 610r Permit <br />M <br />01/19M/2023 23 6:54:10 PPM <br />6. Preparation <br />The CheckMate®Valve uses expantling damp(s)to exert pressure <br />outwards on the walls of the salve to wedge it in piece within the <br />pipe. The walls of the pipe should be clean and free of debris prior <br />to installation. <br />The valve should be inserted fully into the pipe so that no part of <br />Me cuff or bill Wants outside the pipe. Ensure that the valve is not <br />slanted at an angle with the bill pointing upwards or downwards. <br />The valve centerline should be parallel to the pipe centerline. <br />itleflexe Technologies recommends pinning the CheckMate°Vase <br />on all installations. See below. <br />Four pm-tlrilletl holes am provided in each expansion clamp. At <br />least one clamp should be pinned. On exposed pipe, holes can be <br />tlrilletl through the valve and pipe, <br />ed <br />and abolt runthrough <br />should <br />ld be used <br />with a nut. For buried pipe, silicon <br />or similar sealant shoultl be usetl <br />to seal bolts. <br />]. Lubrication <br />The outside of the valve can be lubricated with a water -based <br />lubricant prior to inserting the valve into the pipe. R the taping <br />procedure has been used, the surface of the tape can be lubricate to <br />aid insertion. <br />GWTIUN: Oo not use oetmieum-based lubricants on this <br />product or an the vulcanized rubber tape. <br />8. Plumb Lines and Arrows <br />The CheckMate° Valve arrives with a "top" arrow, "flow" arrow and <br />plumb lines, marked in white, at the 12:00 and 6:00 position of the <br />valve. Utilize this marking to orient the valve in the pipe, as well as <br />to ensure the valve is oriented correctly in pipe section. <br />9. Valve Orientation <br />The CheckMate' Valve must be installed in a horizontal pipe. Valves <br />4" —18" (nominal) are supplied with a single clamp. The clamp <br />turnbuckle should be oriented at top dead center as tlelinatetl by the <br />plumb line. <br />Valves 20"-60" (nominal) are supplied with two clamps. The <br />turnbuckles should be oriented 45-from the top center plumb line. <br />The 72" is supplied with three clamps. The turnbuckle for one clamp <br />to be at top center. The other clamps to be 45- to each side of top <br />center. <br />10. Insertion Into Pipe <br />Clamp to support the shape of Me cuff should be hand tight and <br />should be Wended outward, but only tight enough to loosely keep <br />the shape of the cuff during installation. <br />CAUTION: If you spend the clamp excessively at this slap it <br />will hinder or prevent the CheckMate"al being fully inserted <br />into the pipe. <br />CheckMate' Clamping Diagrams <br />Downstream Clamp <br />77 <br />Wwnebent Flanged <br />Hm <br />\ I / <br />Downstream Flanged Thimble Insert <br />y <br />I <br />Upstream Clamp <br />Fire <br />Upstream Flanged <br />i <br />flox I <br />I <br />i <br />Upstream Flanged Thimble Insert <br />Flow <br />I <br />