My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007 CEDAR ST 2023-04-10
>
Address Records
>
CEDAR ST
>
2007
>
2007 CEDAR ST 2023-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 10:58:34 AM
Creation date
4/5/2023 2:39:27 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
2007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS <br /> Department of Ecology for stormwater facility design in Western Washington.Modeling shall be performed <br /> using a 5-minute timestep. <br /> Additional Requirement <br /> Flow Control BMPs shall be selected, designed, and maintained in accordance with the City's adopted <br /> Stormwater Management Manual and Section 4 of the DCSS, except as noted in this Section.The Flow <br /> Control Performance Standard maybe achieved through any combination of onsite stormwater management <br /> techniques,flow control BMPs'and selective site design which can be demonstrated to achieve the standard. <br /> 6-10.1(2) . .DESIGN DOCUMENTATION <br /> Development applicants shall provide documentation of compliance with the Combined Sewer Area <br /> stormwater standards.Development applications shall include the following: <br /> • a. Stormwater Report which includes the following elements: <br /> • Narrative description-of the proposed-project, existing&proposed conditions, and proposed <br /> stormwater facilities to be implemented. <br /> • Existing and proposed site maps identifying land cover types used in the stormwater analysis <br /> • Numeric summary of existing and..proposed surface areas within the site and contributing <br /> offsite areas <br /> •.. Determination of erosion control..risks..and proposed measures to control erosion and <br /> sedimentation. <br /> • .Offsite analysis narrative description and figure describing upstream areas which contribute <br /> runoff to the site and the downstream system which will receive runoff from the site:Describe <br /> any identified-issues which-may saffectorizould•be-exacerbated by the project. <br /> • Flow control design and sizing calculations <br /> • Conveyance pipe sizing calculations <br /> • Other reports and data required to prepare the stormwater facility design <br /> b. Construction plans for proposed stormwater facilities <br /> c. Operations and maintenance manual for all proposed stormwater facilities. <br /> d. Maintenance covenant for owner conducted maintenance of all stormwater facilities. <br /> 6-10.2 COMBINED'SEWER*CONVEYANCE-SYSTEM <br /> • <br /> . 6-10.2(1) MATERIALS AND CONSTRUCTION <br /> Elements of the combined sewer system which convey only stormwater, such as catch basins and <br /> stormwater..piping.:shall.be.constructed.in accordance with the stormwater conveyance system requirements <br /> in Section 4-2. <br /> Elements,of the combined sewer system which convey only sanitary sewage, ,or,a combination of <br /> stormwater runoff and sanitary sewage,shall be designed in accordance with Section 6-7 and 6-8. <br /> • <br /> • :..SAMTARY.SEWERS.6-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.