My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10330 EVERGREEN WAY GLINT CAR WASH 2023-04-10
>
Address Records
>
EVERGREEN WAY
>
10330
>
GLINT CAR WASH
>
10330 EVERGREEN WAY GLINT CAR WASH 2023-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 11:28:51 AM
Creation date
4/5/2023 3:40:38 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10330
Tenant Name
GLINT CAR WASH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C T ' <br />180 Nickerson St. <br />INC. <br />Suite 302 <br />Seattle, WA <br />98109 <br />(206)285-4512(V) <br />(206) 285-0618(F) <br />September 24, 2021 <br />James Bonder, PE, SE <br />City of Everett <br />Community Development <br />18415 101 St AVE NE <br />Bothell, WA 98011 ECEOVE <br />l <br />c/o: Eric Koch <br />Partners Architectural Design Group, Inc. OCT 2 0 2021 <br />8383 158th AVE NE Suite 250 R <br />Redmond, WA 98053 CITY OF EVERETT <br />Permit Services <br />Re: 10330 Evergreen Way <br />Glint Carwash <br />Plan Check No. B2106-011 <br />Dear James, <br />We have reviewed the comments contained in the Building Permit Review Letter, dated <br />September 14, 2021, for the Glint Carwash project. We have prepared the following itemized <br />response to those comments that pertain to the structural items. Please refer to the original <br />comments as we have provided only our responses. <br />1. The CMU will be fully grouted throughout the building. We have updated the calculations <br />using 78 PSF. Please see the attached calculations. <br />2. Noted, please see the attached calculations. <br />3. We have added CMU elevations to drawing S6.1. Please see these elevations for the <br />seismic detailing. <br />4. Noted. Please see attached calculations. <br />5. We have added a note for all the horizontal members to have hook ends. Please see the <br />elevations on drawing S6.1. <br />6. Please see attached calculations. <br />We trust that this letter addresses your comments regarding structural items. Please phone if you <br />have any questions pertaining to this letter, the calculations, or plans. <br />Sincerely, <br />coq <br />Craig F. Roberts, SE <br />N:`•.210`4 :alit t Everett Car'`OJash .. Par*r,erlsIDOCS OUT:,21094 2021.09.24 Review Ce?„mer3t r esporis Letter.:.l,ac <br />Structural Engineers Printed: L:,F=1)iemt be' 27, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.