My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/04/05 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/04/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 9:55:35 AM
Creation date
4/6/2023 10:07:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/5/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Egress plan and occupancy calculations <br />• Equipment plans and schedule (equipment list provided by Client) <br />• Door and Room finish schedules <br />• West exterior elevation <br />• Coordination with the Structural Engineer, Mechanical Engineering, Electrical Engineer, Security <br />Consultant. <br />• Interior elevations of built-ins, kitchen/break room, and bathrooms (finishes to be selected by Client) <br />• Miscellaneous architectural details <br />2. Specifications <br />• Created as part of this contract. The finishes are to be selected by the Client. An outline specification only <br />will be provided by the architect. Note: the Client to provide a comprehensive list of finishes to the architect. <br />Part IV - Permitting <br />• Permit review meeting with Client (two video conference meeting included.) <br />• Health Department application prepared and submitted by Owner (if required) <br />• Coordinate with Planning and Building department for permit documents and permit intake requirements <br />• Permit application <br />• Building department corrections es necessary <br />Part V - Bid Phase Assistance <br />- Assist with contractor RFI's, substition request, etc. <br />- Assist with Pre -bid addenda preparation <br />- If an onsite visit is required it will( be billed as an extra charge <br />Part VI - Construction Administration <br />• To be billed at an hourly rate as noted in Exhibit B, but not as part of this contract. <br />Part VII - Structural Drawings <br />1. New Structural Requirement <br />2. Structural Calculations <br />Part VIII - Mechanical Drawings <br />I. Added HVAC <br />2. Energy Code Calculations <br />Part IX - Electrical Drawings <br />1. New Lighting <br />2. New Power Requirements <br />3. Energy Code Calculations <br />Part X - Security Drawings <br />1. Evidence Room Requirements <br />TOTAL MAXIMUM COMPENSATION <br />Architectural Services <br />Structural Engineering Services <br />Mechanical Engineering Services <br />Electrical Engineering Services <br />Security Consultant <br />Cost Estimating Services <br />Reimbursable Expenses <br />Subtotal Architectural & Engineering Services: <br />$239,300.00 <br />$25,000.00 <br />$25,000.00 <br />$30,000.00 <br />$30,000.00 <br />$40,000.00 <br />$ 1,500.00 <br />$390,800.00 <br />Page 13 <br />(Form Approved by City Attorney's Office November <br />2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.