My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2025-08-15
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 7:57:05 AM
Creation date
4/6/2023 12:02:49 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />PENSKE TRUCK LEASING EVERETT ONSITE IMPROVEMENTS Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,710 <br />Section 7 — Construction Stormwater Pollution Prevention Elements <br />Erosion and sediment control for this project will consist of the application of the BMPs listed below. Seethe Erosion <br />Control Plan exhibit at the end of this section for a plan view of the proposed TESC BMPs. <br />Below is a discussion of each of the thirteen Construction Stormwater Pollution Prevention Elements and a summary <br />of applicable BMPs. Design, installation, and maintenance of any specific BMP should be carried out in accordance <br />with the DOE Manual and any further instructions detailed in the construction plans. Included in Appendix 1 of this <br />report are the DOE Manual specifications, tables, and figures for each BMP identified in this report. <br />Element 1- Preserve Vegetation/Mark Clearing Limits <br />Work limits will be identified in the field from the construction plans. Paint lines, silt fence, high -visibility fence <br />and/or stakes will be used to delineate the limits of construction. Existing vegetation should be preserved where <br />possible to limit the area of exposed soils. <br />Applicable BMPs: BMP C101: Preserving Natural Vegetation <br />BMP C233: Silt Fence <br />Element 2- Establish Construction Access <br />Construction vehicles will access the site from two construction entrances off of Railway Avenue on the east side of <br />the site. Construction entrances shall be built per plan. A wheel wash shall be used if the construction entrances <br />are not effective in preventing tracking of sediment offsite. Any debris generated as a result of construction activity <br />on paved surfaces will be swept clean to prevent tracking onto public roads. <br />Applicable BMPs: <br />BMP C105: Stabilized Construction Entrance / Exit <br />BMP C106: Wheel Wash <br />BMP C107: Construction Road/Parking Area Stabilization <br />Element 3- Control Flow Rates <br />The proposed project is flow control exempt. See the Permanent Stormwater Control Plan for the determination of <br />this exemption. <br />Applicable BMPs: N/A <br />Element 4- Install Sediment Controls <br />Catch Basin Inserts (CBI) will be used by the contractor to minimize sediment entering the existing catch basins. If <br />any catch basins or inserts become filled with sediment or debris, it must be cleaned in such a manner as to prevent <br />material from entering the stormwater drainage system. Sweeping of paved surfaces will also help to prevent <br />sediment from entering the existing system. Silt fencing will reduce the sediment load of runoff. <br />Applicable BMPs: BMP C220: Storm Drain Inlet Protection <br />BMP C233: Silt Fence <br />SITTS & HILL ENGINEERS, INC. 8 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.