My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2025-08-15
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 7:57:05 AM
Creation date
4/6/2023 12:02:49 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PENSKE TRUCK LEASING EVERETT ONSITE IMPROVEMENTS Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,710 <br />Element 5 Stabilize Soils <br />Any exposed soil requiring stabilization due to poor weather conditions, or left unworked for more than 2 days from <br />October 1 to April 30 (7 days from May 1 to September 30), will be covered at the end of each work shift. Covering <br />material will be anchored to ensure adequate protection. Erosion control measures will remain in place until soil <br />stabilization can be achieved by the installation of permanent surfacing. The use of landscape surfacing BMPs shall <br />be coordinated with the project landscape plans. There will be no soil stockpiles after construction. Dust control <br />will be utilized as necessary at the Contractor's discretion by keeping the work area adequately moisture <br />conditioned. <br />Applicable BMPs: BMP C120: Temporary and Permanent Seeding <br />BMP C121: Mulching <br />BMP C123: Plastic Covering <br />BMP C125: Topsoiling / Composting <br />BMP C140: Dust Control <br />Element 6- Protect Slopes <br />Stabilize fill slopes to prevent erosion as described under Element #5. <br />Applicable BMPs: BMP C120: Temporary and Permanent Seeding <br />BMP C121: Mulching <br />BMP C123: Plastic Covering <br />BMP C125: Topsoiling / Composting <br />BMP C140: Dust Control <br />' Element 7- Protect Drain Inlets <br />All existing and proposed catch basins on and near the site are to be protected as necessary during construction. <br />This will be accomplished through the use of catch basin inserts and pavement sweeping. The construction drawings <br />detail the location and protection measure required for each existing adjacent catch basin to be protected. Inlet <br />protection filters are required on all existing catch basins near the area of work. Filters will be inspected frequently <br />' during construction (especially after storm events) and pavement will be checked and swept as necessary. If inlet <br />protection filters become filled to one-third of available storage with sediment, they will be cleaned in such a <br />manner as to prevent sediment from entering the stormwater drainage system. Inlet protection material will also <br />be kept on hand in case additional protection becomes necessary. <br />Applicable BMPs: BMP C220: Storm Drain Inlet Protection <br />Element 8- Stabilize Channels and Outlets <br />No conveyance channels are proposed to manage stormwater on the finished site. The use of channels during <br />construction to carry construction stormwater is at the discretion of the contractor. Any such channels must be <br />designed and protected in accordance with all applicable requirements of the DOE Manual and the City of Everett. <br />Applicable BMPs: N/A <br />SITTS & HILL ENGINEERS, INC. 9 <br />' TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.