Laserfiche WebLink
PENSKE TRUCK LEASING EVERETT ONSITE IMPROVEMENTS Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,710 <br />Element 5 Stabilize Soils <br />Any exposed soil requiring stabilization due to poor weather conditions, or left unworked for more than 2 days from <br />October 1 to April 30 (7 days from May 1 to September 30), will be covered at the end of each work shift. Covering <br />material will be anchored to ensure adequate protection. Erosion control measures will remain in place until soil <br />stabilization can be achieved by the installation of permanent surfacing. The use of landscape surfacing BMPs shall <br />be coordinated with the project landscape plans. There will be no soil stockpiles after construction. Dust control <br />will be utilized as necessary at the Contractor's discretion by keeping the work area adequately moisture <br />conditioned. <br />Applicable BMPs: BMP C120: Temporary and Permanent Seeding <br />BMP C121: Mulching <br />BMP C123: Plastic Covering <br />BMP C125: Topsoiling / Composting <br />BMP C140: Dust Control <br />Element 6- Protect Slopes <br />Stabilize fill slopes to prevent erosion as described under Element #5. <br />Applicable BMPs: BMP C120: Temporary and Permanent Seeding <br />BMP C121: Mulching <br />BMP C123: Plastic Covering <br />BMP C125: Topsoiling / Composting <br />BMP C140: Dust Control <br />' Element 7- Protect Drain Inlets <br />All existing and proposed catch basins on and near the site are to be protected as necessary during construction. <br />This will be accomplished through the use of catch basin inserts and pavement sweeping. The construction drawings <br />detail the location and protection measure required for each existing adjacent catch basin to be protected. Inlet <br />protection filters are required on all existing catch basins near the area of work. Filters will be inspected frequently <br />' during construction (especially after storm events) and pavement will be checked and swept as necessary. If inlet <br />protection filters become filled to one-third of available storage with sediment, they will be cleaned in such a <br />manner as to prevent sediment from entering the stormwater drainage system. Inlet protection material will also <br />be kept on hand in case additional protection becomes necessary. <br />Applicable BMPs: BMP C220: Storm Drain Inlet Protection <br />Element 8- Stabilize Channels and Outlets <br />No conveyance channels are proposed to manage stormwater on the finished site. The use of channels during <br />construction to carry construction stormwater is at the discretion of the contractor. Any such channels must be <br />designed and protected in accordance with all applicable requirements of the DOE Manual and the City of Everett. <br />Applicable BMPs: N/A <br />SITTS & HILL ENGINEERS, INC. 9 <br />' TACOMA, WASHINGTON <br />