My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1- Minimum Requirements (MR's) for New Development Projects <br /> Start Here <br /> Does the site have Yes See Redevelopment Minimar <br /> or more of existing tio- Requirements and How Cra.t <br /> -ipervious coverage? 'Figure I 2.4.2) <br /> Q.D0 <br /> Does the proiect convert:Xi <br /> acres or more of vegetation to <br /> Does the protect result ni awn or landscaped afeas.or <br /> 5.00Y0 square teet.or No convert 2 5 acres Of more of <br /> greater.of new plus native vegetation to pasture'? <br /> replaced hard surface <br /> • ,/ <br /> area? • <br /> • <br /> No <br /> Yes/ <br /> Does the project result in 2.300 <br /> r <br /> square feet.or greater.of new plus <br /> All Minimum Requirements ieplaced hard surface area? <br /> apply to the new and replaced <br /> hard surfaces and converted <br /> vegetation areas Yes,/ No <br /> Does the protect have land <br /> Minimum Requirements#1 disturbing activities of 7.000 <br /> 4 r <br /> through#5 apply to the new Yes <br /> square feet o greater. <br /> and replaced hard surfaces <br /> and the land disturbed. <br /> iNo <br /> Minimum Requirement#2 <br /> applies. <br /> Figure 1-2.4.1 <br /> Flow Chart for Determining Requirements for <br /> New Development <br /> ECOLOGY <br /> nttp ie r)gtit ,I:Op'y•et?II lickce per <br /> • ELI .1 <br /> - . . <br /> Insight Engineering Co. - Stormwater Site Plan 09/10/18 <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.