Laserfiche WebLink
Figure 1- Minimum Requirements (MR's) for New Development Projects <br /> Start Here <br /> Does the site have Yes See Redevelopment Minimar <br /> or more of existing tio- Requirements and How Cra.t <br /> -ipervious coverage? 'Figure I 2.4.2) <br /> Q.D0 <br /> Does the proiect convert:Xi <br /> acres or more of vegetation to <br /> Does the protect result ni awn or landscaped afeas.or <br /> 5.00Y0 square teet.or No convert 2 5 acres Of more of <br /> greater.of new plus native vegetation to pasture'? <br /> replaced hard surface <br /> • ,/ <br /> area? • <br /> • <br /> No <br /> Yes/ <br /> Does the project result in 2.300 <br /> r <br /> square feet.or greater.of new plus <br /> All Minimum Requirements ieplaced hard surface area? <br /> apply to the new and replaced <br /> hard surfaces and converted <br /> vegetation areas Yes,/ No <br /> Does the protect have land <br /> Minimum Requirements#1 disturbing activities of 7.000 <br /> 4 r <br /> through#5 apply to the new Yes <br /> square feet o greater. <br /> and replaced hard surfaces <br /> and the land disturbed. <br /> iNo <br /> Minimum Requirement#2 <br /> applies. <br /> Figure 1-2.4.1 <br /> Flow Chart for Determining Requirements for <br /> New Development <br /> ECOLOGY <br /> nttp ie r)gtit ,I:Op'y•et?II lickce per <br /> • ELI .1 <br /> - . . <br /> Insight Engineering Co. - Stormwater Site Plan 09/10/18 <br /> -4- <br />