implemented during the proposed construction project. The <br /> objectives of the SWPPP are to: <br /> 2. Implement Best Management Practices (BMPs) to prevent erosion <br /> and sedimentation, and to identify, reduce, eliminate or prevent <br /> stormwater contamination and water pollution from construction <br /> activity. <br /> 3. Prevent violations of surface water quality, ground water quality, or <br /> sediment management standards. <br /> 4. Prevent, during the construction phase, adverse water quality <br /> impacts including impacts on beneficial uses of the receiving water <br /> by controlling peak flow rates and volumes of stormwater runoff at <br /> the Permittee's outfalls and downstream of the outfalls. <br /> The 13 Elements <br /> Element#1 —Mark Clearing Limits <br /> To protect adjacent properties and to reduce the area of soil exposed to <br /> construction, the limits of construction will be clearly marked before land- <br /> disturbing activities begin using BMP C103 high visibility fence. <br /> Element#2—Establish Construction Access <br /> Use BMP C 105 Stabilized Construction Access to establish construction access <br /> according to the approved construction plans. Maintain until the entrance has been <br /> paved. <br /> Element#3—Control Flow Rates <br /> Flow rates are expected to be minimal therefore no BMP's are required. <br /> Element#4—Install Sediment Controls <br /> Use BMP C220 Storm Drain Inlet Protection. Install catch basin filters, according to the <br /> approved construction plans, as catch basins become operable. Maintain until all <br /> construction activities are completed. <br /> Element#5—Stabilize Soils <br /> Use BMP 121 Mulching according to the approved construction plans. Maintain until <br /> permanent stabilization is put in place <br /> Element#6—Protect Slopes <br /> NA <br /> Element#7—Protect Drain Inlets <br /> Insight Engineering Co. -Stormwater Site Plan 09/10/18 <br /> - 14- <br />