My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Envelope Summary, pg. 2 ENV-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> Project Title: Landing at Port Gardner Date 10/05/2018 <br /> Vertical Fenestration and Total Vertical NET Exterior <br /> Fenestration Area Above Grade Total Skylight Area NET Exterior Roof <br /> Skylight Area Calculation (rough opening) Wall Area (rough opening) Area <br /> Prescriptive Path-Enter envelope sf values New 3,165 23,810 0 16,082 <br /> directly into this section of ENV-SUM for <br /> vertical fenestration,skylights,net walls and Existing 0 0 0 0 <br /> roof.For Additions and Alterations,refer to <br /> these sections in ENV-SUM for further instructions. Total 3,165 23,810 0 16,082 <br /> Component Performance-When this <br /> Envelope Compliance Path is selected,write- <br /> rotection of this section is enabled. Enter Vertical <br /> p c Skylight-to-Roof <br /> envelope sf values for all assemblies into the Fenestration-to- 11.7/o Ratio(SRR) <br /> ENV-UA form.Envelope information from Wall Ratio(WWR) <br /> ENV-UA will auto-fill into this section of ENV- <br /> Vertical Fenestration Area Compliance VERTICAL FENESTRATION AREA COMPLIES WITH MAXIMUM ALLOWANCE <br /> Skylight Area Compliance NO SKYLIGHT PROPOSED.COMPILIES WITH MAXIMUM ALLOWANCE. <br /> Vertical Fenestration O High performance fenestration U-factors and SHGC per C402.4.1.3 <br /> Alternates 0 Dedicated outdoor air system per C402.4.1.4 and C403.6 <br /> Show locations of qualifying daylight zone O In buildings Z 3 stories,25%or more of NET floor area is in DLZ per C402.4.1.1 <br /> (DLZ)areas and ft2 on project plans. <br /> 0 In buildings<3 stories,50%or more of CONDITIONED floor area is within DLZ per C402.4.1.1 <br /> For Daylight Zone Area Calculations- Daylight Zone Calculations <br /> a)Sidelight areas include primary+ <br /> secondary daylight zone areas. Daylight Zone Fenestration Alternate Sidelight Daylight Toplight Daylight Percent Daylight <br /> b)Include overlapping toplight and sidelight Not Selected.No Calculations Required Zone Area Zone Area Zone Area <br /> daylight zone areas under Toplight. <br /> c)Net floor area definition in Chapter 2. - - - - <br /> Spaces in Single Story List all enclosed spaces that exceed 2,500 ft2,have ceiling height greater than 15 ft,and are space <br /> Building Requiring Skylights types required to comply with this provision. Indicate aperture with"AP"prefix(AP 1.1%) <br /> In these spaces a minimum of 50%of the Space Space Area(ft2) DLZ Area(ft2) SRR or Aperture Exception <br /> floor area shall be within a skylight daylight <br /> zone(DLZ).Refer to C402.4.2 for , <br /> requirements. <br /> SRR=Skylight to roof ratio <br /> Envelope Exemptions <br /> Low Energyand Semi-heated Low energy spaces per C402.1.1 Item 1 are exempt from the thermal envelope provisions. Semi- <br /> heated spaces heated by systems other than electric resistance are exempt from wall insulation <br /> Spaces provision only per C402.1.1.1. <br /> Complete Low Energy and Semi-Heated Spaces table in MECH-SUM to verify eligibility based on <br /> installed peak heating and cooling capacity per sf. <br /> Equipment Buildin s Wall Insulation Roof Insulation Overall Average <br /> g R-Value R-Value U-Factor <br /> Equipment buildings are exempt from the Equipment Building Envelope <br /> thermal envelope provisions per C402.1.2. ..— <br /> The following shall be met to be eligible: Electronic equipment power(watts/sf) <br /> building size<_500 sf,average wall/roof U- Heating system output capacity(Btu/hr) <br /> factor s U-0.20,electronic equipment load z -. <br /> 7 watts/sf,heating system output capacity<- Cooling capacity(Yes/No) <br /> 17,000 btu/h. Cooling system capacity not <br />
The URL can be used to link to this page
Your browser does not support the video tag.