Laserfiche WebLink
Building Permit Plans Checklist, pg. 1 ENV-CHK <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> Project Title: Landing at Port Gardner Date 10/05/2018 <br /> The following information is necessary to check a building permit application for compliance with the building envelope requirements in the Washington State <br /> Energy Code,Commercial Provisions. <br /> Applicability Code Location in Building <br /> (yes,no,na) Section Component Compliance information required in permit documents Documents Department Notes <br /> SCOPE <br /> Identify low energy spaces on plans;include project information,and <br /> na C402.1.1 Low energy spaces calculations if applicable,that demonstrate spaces are eligible for <br /> envelope provisions exemption <br /> Identify semi-heated spaces on plans,include calculations that <br /> na C402.1.1.1 Semi-heated spaces demonstrate spaces are eligible for wall insulation exemption <br /> Provide building area,average wall and roof U-factor,and installed Building Area= <br /> Yes C402.1.2 Equipment Buildings equipment information that demonstrates equipment building is eligible for A0.1,U value= <br /> envelope provision exemption D1.1 <br /> Walk-in and <br /> na C410.2 warehouse cooler Identify walk-in and warehouse cooler and freezer spaces on plans <br /> and freezer spaces <br /> na C101.4.1 Mixed occupancy Identify spaces with different occupancy requirements on plans <br /> Identify on plans existing unconditioned spaces changing to semi-heated <br /> Change of space or conditioned space,and existing semi-heated spaces changing to <br /> na C503.2 conditioning conditioned space;provide calculations for existing and final level of space <br /> conditioning,and calculations that demonstrate alteration complies with <br /> current WSEC <br /> Identify on plans existing F,S and U-occupancy spaces undergoing a <br /> change in occupancy;provide calculations that demonstrate alteration <br /> complies with the current WSEC <br /> Change of Identify on plans pre-2002 Group R spaces undergoing a change to a <br /> na C505.1 commercial occupancy;provide calculations that demonstrate alteration <br /> occupancy complies with the current WSEC <br /> Identify on plans non-Group R occupancy spaces undergoing a change to <br /> Group R;provide calculations that demonstrate alteration complies with <br /> the current WSEC <br /> ENVELOPE PROVISIONS <br /> indicate envelope insulation compliance patn and provide appucabie <br /> forms;ENV-PRESCRIPTIVE or ENV-UA/ENV-SHGC for component <br /> Yes C103.2 Compliance ncrfnrmnrc Refer to sheet <br /> C103.6.3 documentation If complying via total building performance,provide a list of all proposed D1.1,details 1,2 <br /> envelope component types,areas and U-values <br /> C303.1.1 Insulation Indicate identification mark shall be applied to all insulation materials and <br /> Yes C303.1.2 identification insulation installed such that the mark is readily observable during D1.1 <br /> inspection <br /> C303.1.3 Fenestration product Fenestration products shall be labeled with rated U-factor,SHGC,VT,and <br /> Yes C402.4.3 rating leakage rating A0.6 <br /> Indicate installation methods,thicknesses,densities and clearances to nCiCr it,wave' <br /> C303.1.1 General insulation achieve the intended R-value of all insulation materials; D1.1 for <br /> Yes C402.2.1 installation insulation <br /> Where two or more layers of rigid insulation will be used,indicate that thickness. No <br /> edge joints between layers are staggered <br /> �riniA inc..ls+inn <br /> Indicate R-value(s)of cavity/continuous insulation on roof sections; <br /> Indicate framing materials on roof sections; <br /> Indicate method of framing for ceilings below vented attics and vaulted <br /> ceilings per A102.2(std,adv); Detail 14 on <br /> C103.2 Roof assembly Provide area weighted average U-factor calculation for insulation whose sheet RA1.1. <br /> Yes C402.2.2 insulation thickness varies by 1 inch or less; Also please refer <br /> Indicate effective U-factors of tapered insulation entirely above deck per to sheet D1.1, <br /> Al 02.2.6;include roof configuration and slope,maximum R-value at peak details 30&36 <br /> and minimum R-value at low point for all roof surfaces <br /> Indicate R-values for thermal spacers and each insulation layer,and liner <br /> system(LS)method for metal building roofs <br /> na C402.2.2 Skylight curb Indicate curb insulation R-value on roof section if not included in skylight <br /> insulation NFRC rating <br /> Indicate R-value(s)of cavity/continuous insulation on wall sections; <br /> Indicate framing materials on wall sections; <br /> Indicate method of framing for wood construction per A103.2(std,int,adv); <br /> C103.2 <br /> C402.2.3 Above/below grade Indicate material density category,wall weight and heat capacity for <br /> Yes C402.2.4 wall insulation qualifying mass walls; D1.1 <br /> C303.2.1 For qualifying ASTM C90 masonry walls,indicate loose-fill core insulation <br /> material and percentage of cores filled including grouted cores,bond <br /> beams,vertical fills,headers and any other grouted cores; <br /> 521) <br />