My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10725 19TH AVE SE 2023-04-07
>
Address Records
>
19TH AVE SE
>
10725
>
10725 19TH AVE SE 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:42:41 PM
Creation date
4/7/2023 1:52:09 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10725
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> 1 <br /> 8. Description of adjacent areas which may be affected by site disturbance (i.e. streams, <br /> lakes, wetlands, residential areas, roads): <br /> All work should be limited to the site area and should not affect any adjacent areas <br /> except the frontage improvements. <br /> 9. Description of critical areas that are on or adjacent to the site: <br /> There are no critical areas within 300 feet of the project site. <br /> 10. Describe the intended sequence and timing of construction activities and any proposed <br /> construction phasing. <br /> Arrange and attend pre-construction meeting with the City of Everett site <br /> development inspector. Certified erosion control specialist shall be identified at the <br /> pre-construction meeting. <br /> Flag property lines and clearing limits. <br /> Install erosion control measures and devices per approved plans. <br /> Install silt fences or hay bales controls; install catch basin protection inserts; adjust <br /> as needed during construction. Insure all surface flows are controlled and routed <br /> through TESC control. <br /> Clear grub and rough grade. <br /> Remove all existing structures. <br /> Complete site excavation and grading activities in accordance with plans. <br /> Install all utilities. <br /> Construct site improvements <br /> Hydro seed, mulch, and plant landscape. <br /> Remove remaining TESC structures after the site has been stabilized and approved <br /> by the City of Everett development inspector. <br /> Full compliance with doe best management practices is required for this project. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.