My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10725 19TH AVE SE 2023-04-07
>
Address Records
>
19TH AVE SE
>
10725
>
10725 19TH AVE SE 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:42:41 PM
Creation date
4/7/2023 1:52:09 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10725
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 6 Inspection and Monitoring: <br /> All BMPs shall be inspected,maintained,and repaired as needed to assure continued <br /> performance of their intended function. Site inspections shall be conducted a person <br /> who is knowledgeable in the principles and practices of erosion and sediment <br /> control. The person must have the skills to 1)assess the site conditions and <br /> construction activities that could impact the quality of stormwater,and 2)assess the <br /> effectiveness of erosion and sediment control measures used to control the quality <br /> of stormwater discharges. <br /> Requirements—Erosion Control Lead <br /> 7 A Certified Erosion and Sediment Control Specialist shall be identified in the <br /> Construction SWPPP and shall be on-site or on-call at all times. Certification <br /> may be obtained through an approved training program that meets the erosion and <br /> sediment control training standards established by Ecology. Whenever inspection <br /> and/or monitoring reveals that the BMPs identified in the Construction SWPPP <br /> are inadequate,due to the actual discharge of or potential to discharge a <br /> significant amount of any pollutant,appropriate BMPs or design changes shall be <br /> implemented as soon as possible.Maintaining an Updated Construction SWPPP <br /> Requirements—Retain CSWPPP on-site,Modify as necessary. <br /> 8 The Construction SWPPP shall be retained on-site with the construction <br /> drawings. The CSWPPP shall be modified whenever there is a change in the <br /> design, construction, operation,or maintenance at the construction site that has, <br /> or could have, a significant effect on the discharge of pollutants to surface waters. <br /> The CSWPPP shall be modified if,during inspections or investigations conducted <br /> by the owner/operator, or the City or state regulatory authority, it is determined <br /> that the SWPPP is ineffective in eliminating or significantly minimizing pollutants <br /> in stormwater discharges from the site. The SWPPP shall be modified as <br /> necessary to include additional or modified BMPs designed to correct problems <br /> identified. Revisions to the SWPPP shall be completed within seven(7)days <br /> following the inspection. Select from the following Best Management Practices, <br /> (BMPs),the ones that the Contractor will implement on your site,to meet the <br /> erosion control requirements listed above. <br /> The following Best Management Practices,(BMPs),the ones that the Contractor will <br /> implement on your site,to meet the erosion control requirements listed above. <br /> ✓ Maintain and repair in accordance with BMP specifications <br /> Actions will be taken to accomplish these requirements and objectives,given the unique <br /> circumstances of the project. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.