Laserfiche WebLink
t. <br /> EROSION CONTROL ELEMENT# 13 - Protect on-site Stormwater Management <br /> BMPs. <br /> ❑ C102: Buffer Zone—BMP C 102 <br /> ❑ High Visibility Fence —BMP C103 <br /> ❑ Interceptor Dike and Swale—BMP C200 <br /> ❑ Check Dams—BMP C207 <br /> ❑ Triangular Silt Dike—BMP C208 <br /> ❑ Brush Barrier Zone—BMP C231 <br /> ✓ Silt Fence—BMP C233 <br /> ❑ Vegetated Strip—BMP C234 <br /> ❑ Other <br /> The areas on the site to be used for permanent BMPs shall be protected from siltation and <br /> compaction during construction by sequencing the construction in a fashion to install these <br /> BMPs at the latter part of the construction grading operations, by excluding equipment from the <br /> BMPS and the associated areas, and by using the erosion and sedimentation control BMPs. <br /> Additional requirements for protecting these BMPs during the construction process, testing <br /> functionality, and restoring functionality are needed at the final stage of the construction process <br /> Contractor must protect all permanent BMPs from sedimentation through installation and <br /> maintenance of erosion and sediment control BMPs on portions of the site that drain into the <br /> these permanent BMPs. <br /> Restore the facilities to their fully functioning condition if they accumulate sediment during <br /> construction. Restoring the facility must include removal of sedimentation. <br /> Contractor must protect completed lawn and landscaped areas from compaction due to <br /> construction equipment. <br /> Contractor must keep all heavy equipment off existing soils under BMP facilities that have been <br /> excavated to final grade. <br /> 21 <br />