MR#2: Construction Stormwater Pollution Prevention Plan <br /> IV. Construction Stormwater Pollution Prevention Plan: <br /> 1: Mark Clearing Limits <br /> The first step in the"Construction Sequence" is for a surveyor to stake the limits of clearing and to <br /> have construction or silt fencing placed along the limits prior to any other construction activity. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the proposed construction entrance to be installed as the second step after the <br /> staking of clearing limits. A detail is provided on the plans. <br /> 3: Control Flow Rates <br /> Flows during construction will be controlled by applying the appropriate BMPs. The project will <br /> retain as much existing vegetation as possible. In addition,the site proposes to install the future <br /> detention facility which could be used as a temporary sediment control during construction to manage <br /> storm runoff rates. The Detention facility will be cleaned before put in service. <br /> 4: Install Sediment Controls <br /> This site and SWPPP proposes to construct a construction entrance and retain existing vegetation and <br /> install CB inlet protection to collect and contain the sediment on this site.These features are intended to <br /> minimize the opportunity for sediment to leave the site via stormwater or on vehicles. The construction of <br /> these features is one of the first items required in the"Construction Sequence".Mulch will also be used on <br /> the exposed soil as necessary to limit erosion. <br /> 5: Stabilize Soils <br /> The "Construction Sequence" calls for the stabilization of soils that remain unworked for certain lengths <br /> of time based on the time of year. Stabilization techniques may include but not limited to mulching, <br /> plastic sheeting or hydroseeding, notes have been added to the plan regarding protection for the stock <br /> pile area if necessary. <br /> 6: Protect Slopes <br /> All slopes on site during construction are required to be protected with mulch or other means as <br /> specified in the construction sequence. <br /> 7: Protect Drain Inlets <br /> CB inlet protection will be installed on all new catch basins and yard drains on and adjacent to this <br /> project. <br /> 8: Stabilize Channels and Outlets <br /> There are no channels and outlets on this project site to protect and stabilize. <br /> 9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project.All vehicles working <br /> on and around the site would need to meet the State requirements for emissions. <br /> 10: Control DeWatering <br /> DeWatering is not expected for this project. However, the detention system will be available for <br /> holding any dewatering runoff and meter release to the downstream system. <br />