My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10725 19TH AVE SE 2023-04-07
>
Address Records
>
19TH AVE SE
>
10725
>
10725 19TH AVE SE 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:42:41 PM
Creation date
4/7/2023 1:52:09 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10725
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 : Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during construction and <br /> working with the County to relocate or add BMPs as necessary as site conditions change. <br /> 12: Manage the Project <br /> It will be the responsibility of the contractor and developer to manage this project and coordinate with the <br /> City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and practices of <br /> erosion and sediment control. The person must have skills to first assess the site conditions and <br /> construction activities that could impact the quality of stormwater,and second assess the effectiveness <br /> of erosion and sediment control measures used to control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the Construction <br /> SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant amount <br /> of any pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, operation, or <br /> maintenance at the construction site that has, or could have, a significant effect on the discharge of <br /> pollutants to waters of the state. <br /> The SWPPP shall be modified if,during inspections or investigations conducted by the owner/operator,or <br /> the applicable local or state regulatory authority,it is determined that the SWPPP is ineffective in <br /> eliminating or significantly minimizing pollutants in stormwater discharges from the site. The SWPPP <br /> shall be modified as necessary to include additional or modified BMPs designed to correct problems <br /> identified. Revisions to the SWPPP shall be completed within seven days following inspection. <br /> 13: protect all permanent BMPs from sedimentation through installation and maintenance of erosion <br /> and sediment control BMPs on portions of the site that drain into these permanent BMPs. <br /> Description of proposed erosion control BMP's: <br /> Clearing,grading,and temporary erosion and sediment control plans have been prepared as part of the drainage plan <br /> drawings.However,since a construction site is dynamic it will be necessary to reassess the erosion control <br /> BMP's during construction and install additional measures when necessary. <br /> Proposed temporary measures possible for this project will include the following BMP's: <br /> Installation of stabilized rock construction entrance. <br /> Straw mulch,hydroseed or other mulching and planting method to stabilized unworked areas. <br /> Retention of vegetation around site. <br /> Silt fence <br /> CB inlet protection. <br /> Permanent measures to reduce or eliminate erosion or water quality degradation will include the following <br /> BMP's: <br /> Paving all traffic areas(Asphalt) <br />
The URL can be used to link to this page
Your browser does not support the video tag.