My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10725 19TH AVE SE 2023-04-07
>
Address Records
>
19TH AVE SE
>
10725
>
10725 19TH AVE SE 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:42:41 PM
Creation date
4/7/2023 1:52:09 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10725
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permanent landscaping in pervious areas. <br /> Limiting cut and fill slopes to 2:1 maximum and 3:1 maximum where exposed to standing water. <br /> Routine maintenance and inspection of the grounds and response to developing problems. <br /> The listed erosion control BMP's will be engineered for anticipated conditions in compliance with The City of <br /> Everett and DOE guidelines.With proper installation,maintenance and inspection the proposed BMP's should result <br /> in minimal impact to the surrounding environment The County retains the authority by code to require additional <br /> measures should the existing measures prove insufficient. <br /> SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: approx. 0.4227 acres <br /> Average slope for the site: 2% <br /> Erosion Hazard of Soil low <br /> Critical Areas downslope No <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the construction site runoff will be collected on-site,and <br /> with the implementation of the BMP's listed and that if site conditions warrant,additional BMP's can be <br /> implemented as corrective measures the Risk Category for this site is Low Risk. <br /> With the BMP's listed in section B and shown on the site plan, it is anticipated that this site will have <br /> little impact on the downstream system. <br /> MR#3: Source Control of Pollution <br /> V. Source Control Plan: <br /> The following worksheet is completed by checking the appropriate boxes for all activities that will or may <br /> occur at the project site. <br /> Following the spread sheet is a list of the required and suggested BMP's for each activity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.