Laserfiche WebLink
Jeff I leilman, Development"Technician—Public Works Department <br /> RE: Owner: Wong— 19''Avenue SE <br /> June 200 2018 <br /> (age l <br /> component shall be increased per the provisions of ACI 318-14 Section 17.2.3.4.3. Calculations <br /> substantiating the holdown design should be submitted for review. See IBC Section 1901.2. <br /> See added sheets C-31-C-42 for holdown anchor bolt calculations. <br /> 22. The holdown forces for the two-foot shear walls on the south elevation of the building do not <br /> appear to include cumulative loads from above. See page C-27 of the structural calculation. The <br /> calculations should be reviewed and revised as needed. See IBC Section 1604.4. <br /> The overturning loads do not stack over the garage portal walls. The beam over the garage also <br /> acts as a transfer beam to take out the overturning forces. <br /> 23. Detail 3/4.2 includes the floor diaphragm connection to the shear wall. The detail does not appear <br /> to meet the requirement of IBC Section 706.2. The detail should be revised to allow collapse of <br /> the structure on either side of the wall system without causing collapse of the entire structure. <br /> Detail 3/S4.2 has been updated. <br /> 24. Detail 3/4.2 includes the roof diaphragm connection to the shear wall. <br /> a) The detail does not appear to meet the requirement of IBC Section 706.2. The detail should <br /> be revised to allow collapse of the structure on either side of the wall system without causing <br /> collapse of the entire structure. <br /> b) The detail requires the lower roof diaphragm to connect to the shear wall through rim joist <br /> and nailing to the backside of the wall studs. This is not a substantiate load path to the shear <br /> wall. The load path should be revised to provide a system per AWC SDPWS-15 Section 4.2. <br /> See IBC Section 2306.1. <br /> c) The roof system appears to require an overhang at the upper level similar to Detail 6/S4.3. <br /> The detail should be revised to incorporate this feature. See IBC Section 107.2.1. <br /> a) After analyzing detail 9/S4.2, it is our impression that a fire causing a collapse on one side <br /> will not cause a collapse to adjacent units. <br /> b) The detail has been revised and blocking has been added between the studs for a lateral <br /> connection to the lower rim. <br /> c) The detail has been modified for an overhang condition. <br /> 25. The balloon framing on the east wall of the structure is laterally anchored to the building at the <br /> third floor per Sheet S2.3. Calculations substantiating the load path and the framing capacities <br /> shall be submitted for review.Note that the beams dragging the wall load terminate at the first <br /> interior wall line. The drag framing must extend past this wall into the diaphragm beyond. The <br /> length of the drag framing shall be such that the drag load superimposed on the diaphragm shear <br /> does not exceed the diaphragm capacity. The diaphragm sheathing shall not be assumed to act in <br /> tension to drag the load past the interior wall and into the diaphragm beyond. See IBC Sections <br /> 1604.1 and 1604.4. <br /> Calculation sheet C-8 has been updated for the diaphragm check and calculation sheet B-30 <br /> has been added for the stud capacity of the ballooned wall. <br />