Jeff Heilman, Development'Technician--Public Works Department <br /> RE: Owner: Wong- 19`h Avenue SE <br /> June20 018 <br /> Page 6/g <br /> south wall. A detail should be provided for the corner condition substantiating the load path for <br /> the west wall to the holdown. See IBC Section 107.2.1. <br /> S2.1 has been updated with a callout to transfer shear at the corner condition. <br /> 18. The following comments should be addressed for the holdown requirements in Detail 10/S 12: <br /> a) The straps in the wall-to-wall configuration do not include the 1 1/2-inch nailing offset before <br /> the "A" dimension. The detail should be revised. See IBC Section 104.11.2,or IBC Section <br /> 2306.1 and AWC NDS-15 Table 12.5.1A. <br /> b) The lower strap in the wall-to-header configuration does not clearly specify the "A" <br /> dimension and 1 1/2-inch offset. Revise the detail as needed to clarify the installation <br /> requirements. See IBC Section 107.2.1. <br /> The holdown straps are premanufactured and test by Simpson. Our holdown detail on 10/S4.2 <br /> has end lengths that follows their requirements to achieve their tension loads. See added sheet <br /> C-30 for their detail and installation requirements. <br /> 19. Structural calculation pages C-25 through C-27 indicate that the first story shear walls on the <br /> north elevation consist of three piers at each unit. The foundation plan should provide a holdown <br /> at each end of each wall. See IBC Sections 1604.1, 1604.8.1, 1604.10, and 2306.1,and NDS-15 <br /> SDPWS Sections 3.4,4.1.4,and 4.3.6.4.2. <br /> Per detail 12/S4.1, horizontal straps are provided at openings to transfer the shear around the <br /> openings. Holdowns are only required at the end of the 3-span segment. Holdowns were added <br /> to the west end of the center and east units. <br /> 20. The structural calculations do not appear to include the design of the diaphragms. Calculations <br /> substantiating the diaphragm design shall be submitted for review. See IBC Sections 1604.1, <br /> 1613, and 2306.1. The design shall consider the following: <br /> a) Note 3 on Sheets 52.2 through 52.4 states that the sheathing is oriented perpendicular to the <br /> supporting framing. The plans include areas where the framing is oriented in two directions. <br /> The design shall consider the limiting capacity resulting from the sheathing oriented both <br /> perpendicular and parallel to the framing. See the configuration cases in AWC SDPWS-15 <br /> Table 4.2A. <br /> b) The structure has a Type 4 Horizontal Structural Irregularity and Type 4 Vertical Structural <br /> Irregularity per ASCE 7-10 Tables 12.3-1 and 12.3-2, respectively. The loads in the <br /> diaphragms shall be increased by 25%per ASCE 7-10 Section 12.3.3.4 Item 1. <br /> c) Collectors shall be provided where required. The loads in the diaphragms shall be increased <br /> by 25%per ASCE 7-10 Section 12.3.3.4 Item 1. <br /> Calculation sheets C-8 and C-18 were updated to provide diaphragm checks. <br /> 21. The shearwall holdown design has not been provided in the structural calculations. The <br /> earthquake component of the holdown forces exceeds 20%of the total uplift.The earthquake <br />