My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1708 25TH ST A B 2023-04-07
>
Address Records
>
25TH ST
>
1708
>
1708 25TH ST A B 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:07:46 PM
Creation date
4/7/2023 3:06:50 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH ST
Street Number
1708
Unit
A B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> lijier)- CITY OF EVERETT <br /> Public Works Department <br /> April 4, 2018 <br /> Dante Palmaffy <br /> dpalmaffy@aol.com <br /> 12925 47th Dr SE <br /> Everett, WA 98208 <br /> Owner: Gabriadze, David &Anna <br /> Job Address: 2503 Wetmore Ave SE <br /> Plan Check No: C1808-011 <br /> RE: Building Permit Review Letter <br /> Dear Mr. Palmaffy, <br /> In response to the application for a building permit, the plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. Please note that the following correction items in this <br /> Correction Notice have been numbered to correspond with the previous correction letter's <br /> items. <br /> Structural, <br /> 21.This comment has not been completely addressed. If the proposed wood shear walls <br /> have fastener nailing spaced at 3"oc, please provide a schedule of Special Inspections per <br /> IBC 1704.3. <br /> 22.This comment has not been completely addressed. From the revised permit calculations, <br /> it appears that two lateral-force resisting systems are being used on this project, wood <br /> shear walls and special reinforced concrete shear walls. It also appears that (2) different <br /> R-factors are being applied in orthogonal directions, with R=6.5 applied in the East-West <br /> direction of lateral force and R=5.0 applied in the North-South direction of lateral load. <br /> This appears to imply that the North-South resisting wood shear walls are being designed <br /> for the lower R-factor of 5.0 for the whole structure. Please confirm if the structure is <br /> being designed for two different R-factors entirely. <br /> 23.This comment has been addressed. <br /> 24.This comment has not been completely addressed. Please see the following items a. and <br /> for b. for outstanding items: <br /> 0 3200 Cedar Street 0 425.257.8800 O everettpw@everettwa.gov <br /> Everett, WA 98201 425.257.8882 fax everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.