My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 1/5/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
BHC Consultants 1/5/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 10:19:55 AM
Creation date
4/13/2023 10:19:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
1/5/2023
Council Approval Date
1/4/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
WFP Air Scour Blower Building Replacement
Public Works WO Number
UP 3813
Tracking Number
0003655
Total Compensation
$183,297.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Facility Blower Building <br /> <br />Scope of Services 2 <br />EXHIBIT A <br />SCOPE OF SERVICES <br />Background <br />The City of Everett, Washington (City) has selected BHC Consultants, LLC (BHC) to provide <br />engineering services for the City of Everett Water Treatment Blower Building Project. <br />Currently, there is only one blower for the City’s water treatment process. The current blower is <br />in a pre-engineered metal building located outside and adjacent to the main water treatment <br />facility. The City has purchased a second identical blower and plans to construct a new <br />pre-engineered metal building adjacent to the existing blower building to house the existing and <br />new blowers and supporting electrical equipment. <br />This scope of services includes the project management, design necessary to prepare bid <br />documents, and bid assistance associated with the blower building. <br />Scope of Services <br />Task 100 – Project Management <br />Objectives <br />Monitor, control and adjust scope, schedule, and budget as well as provide monthly status <br />reporting, accounting, and invoicing. Also, provide coordination with BHC staff and City <br />personnel. <br />BHC Services <br />1. Coordinate and manage the project team. <br />2. Prepare monthly status reports describing the following: <br />a. Services completed during the month. <br />b. Services planned for the next month. <br />c. Needs for additional information. <br />d. Scope/schedule/budget issues. <br />e. Schedule update and financial status summary . <br />f. An estimated cash flow (billing) forecast. <br />3. Prepare monthly invoices formatted in accordance with contract terms. <br />4. Attend kickoff meeting at the water treatment facility. Attendance by BHC PM, electrical, <br />mechanical process, and structural engineers. <br />5. Host web-conference meetings, if needed. <br />City of Everett Responsibilities <br />1. Attend project management meetings. <br />2. Attend kickoff meeting. <br />3. Processing and payment of invoices in accordance with the Professional Services <br />Agreement. <br />4. Review and process contract change requests and amendments, if needed.
The URL can be used to link to this page
Your browser does not support the video tag.