My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/04/12 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/04/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 9:34:23 AM
Creation date
4/13/2023 11:45:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E E V E R E T T City Council Agenda Item Cover Sheet <br />An Ordinance Creating a Special Construction Project Entitled "Everett Performing Arts Center Building Envelope <br />Project title: Improvement Project", Fund 342, Program 039, to Accumulate Design Costs for the Project <br />Council Bill # <br />CB 2304 - 20 <br />Agenda dates requested: <br />Briefing <br />Proposed action 4/5/23 <br />Proposed action 4/12/23 <br />Consent <br />Action 4/19/23 <br />Ordinance <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Funding Ordinance <br />Department(s) involved: <br />Parks & Facilities <br />Contact person: <br />Bob Leonard <br />Phone number: <br />425-257-8335 <br />Email: <br />BLeonard@everettwa.gov <br />Initialed by: <br />2ML <br />Department head <br />Administration <br />Council President <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Everett Performing Arts Center Building Envelope Improvement <br />N/A <br />2710 Wetmore Avenue <br />None <br />Fund: Fund 342, Program 039 (CIP 1) <br />Fiscal summary statement: <br />The proposed Funding Ordinance will provide funding for architectural and engineering <br />services for the design of the Everett Performing Art Center Building Envelope <br />Improvement Project. The source of funds is Fund 342, Program 039 (CIP 1). The <br />estimated design cost is not to exceed $93,125.00. <br />Project summary statement: <br />This project will repair structural damage to the exterior concrete and stucco wall units, <br />install expansion joints, replace metal flashing, and repaint entire building. Architectural <br />& Engineering consultant services will be contracted to develop schematic design, bid <br />documents, construction drawings, and assist with bidding and construction <br />administration. <br />Upon completion of the design work, Parks & Facilities staff will return to Council to <br />amend the Ordinance for cost of construction. <br />Anticipated construction to start Spring 2024. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a special construction project entitled "Everett Performing <br />Arts Center Building Envelope Improvement Project", Fund 342, Program 039, to <br />accumulate design costs for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.