My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins NW, LLC 3/23/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
Cummins NW, LLC 3/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 10:37:31 AM
Creation date
4/14/2023 10:37:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Cummins NW, LLC
Approval Date
3/23/2023
Council Approval Date
1/1/1999
End Date
12/31/2024
Department
Information Technology
Department Project Manager
Ken Christiansen and Brian Doolan
Subject / Project Title
LS15 Cummins Generator
Tracking Number
CB 2023-035 LS15 Cummins Generator
Total Compensation
$104,906.14
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: City of Everett, Lift Station 15 <br />Quotation: Q-157520-20230316-0856 <br />Item Description Qty <br />0 Aux Relay-Emergency Position-12 Volts DC 10Aux Relay-Normal Position-12 Volts DC 10Interface-Communications Network, MODBUS RTU Module 10Relay-Elevator Signal 10Transfer Switch Warranty-5 Year Comprehensive 1 <br />4 Battery Temperature-Sensor 15240 mm 1 <br />5 Shop Upfit: battery charger temperature sensor. Install coolant heater isolation valves.1 <br />6 Delivery to site, off-loading by others 1 <br />7 Generator Battery, Group 34 1 <br />8 Sourcewell Contract #092222-CMM 1 <br />TOTAL: $ 95,456.00 <br /> <br />Quote value does not include any tax. <br /> <br />EXCEPTIONS AND CLARIFICATIONS: <br /> <br />Specification 16200 pages 1 - 21 reviewed for this proposal. No electrical drawings provided or reviewed. <br />COVID 19 SUPPLEMENTAL STATEMENT <br />AS A RESULT OF THE OUTBREAK OF THE DISEASE COVID-19 ARISING FROM THE NOVEL CORONAVIRUS, TEMPORARY <br />DELAYS IN DELIVERY, LABOUR OR SERVICES FROM CUMMINS AND ITS SUB-SUPPLIERS OR SUBCONTRACTORS MAY <br />OCCUR. AMONG OTHER FACTORS, CUMMINS' DELIVERY OBLIGATIONS ARE SUBJECT TO CORRECT AND PUNCTUAL <br />SUPPLY FROM OUR SUB-SUPPLIERS OR SUBCONTRACTORS, AND CUMMINS RESERVES THE RIGHT TO MAKE PARTIAL <br />DELIVERIES OR MODIFY ITS LABOUR OR SERVICE. WHILE CUMMINS SHALL MAKE EVERY COMMERCIALLY REASONABLE <br />EFFORT TO MEET THE DELIVERY, SERVICE OR COMPLETION OBLIGATIONS SET FORTH HEREIN, SUCH DATES ARE <br />SUBJECT TO CHANGE. <br />INTERNATIONAL BUILDING CODE (IBC) CERTIFICATION <br />The products in this quotation identified as meeting the requirements of the 2009 IBC have been certified by their respective <br />manufactures via a combination of analytical testing and shaker table testing. Not all products have been shaker table tested. <br />OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT (OSHPD) <br />OSHPD seismic requirements are continuing to evolve. Please contact Cummins for the most current requirements for meeting OSHPD <br />applications. <br />SELECTIVE COORDINATION FOR NATIONAL ELECTRIC CODE (NEC) ARTICLE 700 AND 701 LOADS <br />Cummins generators are equipped with the manufacturer's recommended circuit breaker. Information regarding this device can be <br />supplied upon request. This quotation is not valid if any changes to this circuit breaker(s) is required to coordinate with other devices <br />in the electrical distribution system. If changes are required, the customer must provide a copy of the coordination study listing the <br />manufacturers part number of the disconnect device to be supplied with the generator and a revised quotation will be issued. <br />TRANSFER SWITCH WITHSTAND AND CLOSE RATINGS <br />Transfer switch(es), if included in this quotation, require a withstand and closing rating (WCR) capable of meeting the available <br />upstream fault current (kAIC). The WCR may be based on a specific breaker rating or a time-based rating, and it is the responsibility of <br />a qualified facility designer or engineer to verify compatibility. In the event that the proposed transfer switch(es) are not compatible, the <br />transfer switch(es) will need to be re-quoted to ensure compatibility. A full listing of the WCR can be provided upon request and will be <br />included as part of the submittal package. <br /> <br />CUMMINS STANDARD EXCLUSIONS <br />Exhaust System <br />All off-engine piping, hangers, flanges, gaskets, bolts, insulation, other materials and labor to install. <br />Fuel System <br />All fuel piping and materials not limited to; supply, return, venting, valves, coolers, filters, pumps, fittings, primary fuel regulator, storage <br />tank & senders, external to genset package. All fuel for testing and initial fill. Fuel tank vent extensions and flame arrestors unless <br />specifically listed in the Bill of Materials. <br />Cooling System <br />Intake louvers, exhaust louvers, air dampers, sheet metal ducting, flex adapters, sound <br />attenuators/baffles. All off engine piping, flexible connections, labor and coolant for remote cooling systems. <br />Electrical <br />All off-engine wiring, field terminations of wiring, and lugs other than those detailed in our submittal. Mounting <br /> <br />Quotation: Q-157520-20230316-0856 <br /> <br />Page 2 of 7
The URL can be used to link to this page
Your browser does not support the video tag.