Laserfiche WebLink
Project: City of Everett, Lift Station 15 <br />Quotation: Q-157520-20230316-0856 <br />Mounting bolts and anchors. Vibration isolators (if included) may be shipped loose for installation at the jobsite by others. Seismic <br />engineering calculations.  <br />Electrical Testing <br />Not limited to International Electrical Testing Association (NETA), infrared scanning, harmonic content or other independent agency <br />testing of switchgear, switchboards, protective relays, circuit breaker, electrical coordination studies, arc flash studies and reactive load <br />site testing. <br />Environmental Testing <br />Environmental Protection Agency (EPA), local air quality district or other Authority Having Jurisdiction <br />(AHJ), including acoustical.  <br />Programming <br />All protective relay settings, breaker settings, PLC programming or other user configurable device programming.  <br />Documentation <br />Electronic submittals and operation and maintenance manuals will be provided. Printed copies are available upon request, additional <br />charges may apply.  <br />Miscellaneous  <br />Site specific labeling. Exhaust backpressure, airflow restriction or vibration analysis <br />Design  <br />Cummins is not responsible for system design or engineering and does not guarantee system performance standards. Cummins will <br />supply documentation and reasonable assistance to others responsible for system engineering, design and performance.  <br />Taxes and Permit  <br />Any applicable sales tax, permits, fees, licenses.  <br />Bonds  <br />Any bid bond, payment or performance bond or other type of bond. <br />All items listed above are excluded and will only be supplied by Cummins if agreed upon, in writing, by a sales representative for <br />Cummins.   <br />  <br />LEAD TIME: <br />  <br />Submittals   <br />Typical submittal lead time is 3 - 4 weeks after receipt of purchase order.   <br />Equipment   <br />Current lead-time is 54 - 56 weeks after submittal approval and release for production.  <br />Equipment packaging will be an additional 6 - 8 weeks once the equipment is received by the packager. <br />  <br />Please feel free to contact me if you require any additional information; or if you have any further questions or concerns that I may be of <br />assistance with. <br />  <br />Thank you for choosing Cummins. <br />  <br />Submitted by: <br />  <br />Ray Caparas <br />raymond.caparas@cummins.com <br />  <br />SUBMITTALS. An order for the equipment covered by this quotation will be accepted on a hold for release basis.  Your order will not <br />be released and scheduled for production until written approval to proceed is received in our office.  Such submittal approval shall <br />constitute acceptance of the terms and conditions of this quotation unless the parties otherwise agree in writing. <br />  <br />THERE ARE ADDITIONAL CONTRACT TERMS AND CONDITIONS ATTACHED TO THIS QUOTATION, INCLUDING LIMITATIONS <br />OF WARRANTIES AND LIABILITIES, WHICH ARE EXPRESSLY INCORPORATED HEREIN.  BY ACCEPTING THIS QUOTATION, <br />CUSTOMER ACKNOWLEDGES THAT THE CONTRACT TERMS AND CONDITIONS HAVE BEEN READ, FULLY UNDERSTOOD <br />AND ACCEPTED. <br />  <br />  <br />  <br />  <br />Authorized Signature <br />  <br />  <br />  <br />  <br /> Date <br />   <br />Quotation: Q-157520-20230316-0856 <br />  <br />Page 3 of 7 <br />Cassie Franklin 04/11/2023