My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/04/19 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/04/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 9:00:24 AM
Creation date
4/20/2023 9:21:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett - Water Main Replacement Y March 23, 2023 Page 2 <br />B. PLAN THE EXPLORATION PROGRAM AND OBTAIN PERMITS <br />a. Complete a site visit to review current site conditions, evaluate surficial geology, locate borings, <br />plan the traffic control operations, and develop permit applications for completing the <br />explorations. We will subcontract the traffic control operations including preparation of the <br />plans, and obtaining the signs, flaggers and traffic control supervisor. <br />b. Submit permit applications, traffic control plans, and boring exploration plans to the City of <br />Everett for review and approval. <br />C. FIELD EXPLORATION PROGRAM AND LABORATORY TESTING <br />a. Complete site visits to meet with utility representatives and clear boring locations. This will <br />include completion of the one -call utility locate service and coordinating with APS, a <br />subcontracted private utility locator to clear existing utilities near the borings. <br />b. Explore subsurface soil and groundwater conditions at the sites by drilling 9 borings to depths <br />ranging from 15 to 25 feet (about 150 lineal feet of drilling). Based on the proposed <br />replacement segments, we anticipate drilling the following distribution of borings: <br />• Two borings on Segment 1, Beverly Lane to depths of about 15 feet. We <br />anticipate closing one lane and using two flaggers at this location, and the drilling <br />requiring less than 1/2 day. <br />• One boring on Segment 2, within the left turn lane of 75th Street SE. This boring <br />will be drilled to a depth of about 25 feet and require temporary closure of the <br />left turn lane. <br />• Two borings on Segment 3 within the outside lane of Evergreen Way. These <br />borings are anticipated to be 15 feet deep. We will locate the borings outside of <br />existing entrances to driveways. <br />• Four borings along Segment 5 (Madrona Avenue). Based on the narrow street <br />and observed existing residential parking along the curbs, we anticipate this may <br />require temporary road closure at the boring location while drilling (approximately <br />one hour or Tess at each boring). We will use flaggers to direct residents such <br />that they will still be able to access their property. <br />The field explorations will be completed under the direction of a geotechnical engineer or <br />geologist from our firm. The explorations will be located in the field by measuring or pacing <br />from existing site features such as driveways, structures and other site features shown on the <br />drawings. Our representative will maintain a detailed log of each exploration including the <br />pavement section and underlying soils, and obtain samples of the various materials <br />encountered. The samples will be returned to our office for additional examination and <br />analysis, as necessary, for development of our recommendations. We will haul soil cuttings for <br />offsite disposal. <br />We anticipate a perched groundwater condition may be encountered above the glacial <br />deposits. We will note groundwater observations on the boring logs, monitoring wells are not <br />planned at this time. <br />GEOENGINEERSii <br />File No. 0661-137-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.