My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016 HEWITT AVE BUZZYS ON BROADWAY 2018-01-02 MF Import
>
Address Records
>
HEWITT AVE
>
2016
>
BUZZYS ON BROADWAY
>
2016 HEWITT AVE BUZZYS ON BROADWAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 8:52:48 AM
Creation date
4/24/2023 8:45:56 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2016
Tenant Name
BUZZYS ON BROADWAY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 1 <br /> _ � <br /> i � <br /> T� Bob Landles, Planning Department i <br /> FROM <br /> � Public Works Department I <br /> � <br /> i oATE Febr�ary 7, 1983 � 1 <br /> � i SUBJECT SEPA Checklist Kevicw /183-3 CITY OF EVERETT,EVEPETT WASMINGTON �i <br /> � � <br /> � <br /> � <br /> PROPOSAL: I <br /> � Conversion of a 3300 ft2 restaurant and additional 3200 ftZ of i <br /> I construction for a young adult night dub. ! <br /> I RECOAIML•NDAT[ONS: <br /> 1. Detailed dra•aings shall be submitt� ' tn thc Public Works <br /> ' Dcpartment showing site parking layout, landscaping, utilities, storm <br /> ; drainage and all required improvements in the puhlic right-oi-way. <br /> Public C�orks Department approval of these drawings is required <br /> ! prior to any permits heing issued. All improvements shall be <br /> ' completed, approved and warcanted beofre the Occupancy Permit is <br /> issucd. <br /> 2. Sidewalk improvernents are required to Broadway including <br /> reloc:;tion of drivea�ays. <br /> , 3. Periormance guarantees are required for side�valk and landscaping. <br /> j 4. A one year guaran;ee is required on the public sidewalk and <br /> ' landxaping for an amount not less than 1095 of the cost o! <br /> construction and shall run for one year from the date of issuance of <br /> the first Occupancy Permit for thc project. <br /> 5. City streets and a[leys are to be kept dear of dirt and debris at all <br /> times during construction. <br /> 6. Participation in the cost to fund the North End Sewer Interceptor is <br /> required. The actual cost shall be computed by the Buile'ing <br /> Department per the Ordinance in eifect at the time and according <br /> ; to thc information provided un the approved plans on the date of <br /> permit issuance. <br /> . ; 7. The sites storm drainage system must be altered so the parking lot <br /> � and structure have adequatc drainage. <br /> I <br /> � The City is currently scheduling a sanitary sewer project in the alley <br /> � west nf Droadway which will scrvc this site. <br /> � GW:gs i <br /> I <br /> I i <br /> ( II .J <br /> � I ' <br /> I <br /> � i <br /> i <br /> � 4 J <br /> L J <br />
The URL can be used to link to this page
Your browser does not support the video tag.