Laserfiche WebLink
Sales and <br />Service <br />Project: City of Everett Public Works, 1000kW <br />Quotation: Q-154012-20230131-0959 <br />4 <br />Delivery to site, offloading by others <br />1 <br />5 <br />Generator batteries, Group 8D <br />2 <br />6 <br />Start up with 2 hour load test <br />1 <br />7 <br />Sourcewell Contract #092222-CMM <br />1 <br />TOTAL: $ 280,152.00 <br />Quote value does not include any tax. <br />EXCEPTIONS AND CLARIFICATIONS: <br />No specifications or drawings provided or reviewed for this proposal. <br />COVID 19 SUPPLEMENTAL STATEMENT <br />AS A RESULT OF THE OUTBREAK OF THE DISEASE COVID-19 ARISING FROM THE NOVEL CORONAVIRUS, TEMPORARY <br />DELAYS IN DELIVERY, LABOUR OR SERVICES FROM CUMMINS AND ITS SUB -SUPPLIERS OR SUBCONTRACTORS MAY <br />OCCUR. AMONG OTHER FACTORS, CUMMINS' DELIVERY OBLIGATIONS ARE SUBJECT TO CORRECT AND PUNCTUAL <br />SUPPLY FROM OUR SUB -SUPPLIERS OR SUBCONTRACTORS, AND CUMMINS RESERVES THE RIGHT TO MAKE PARTIAL <br />DELIVERIES OR MODIFY ITS LABOUR OR SERVICE WHILE CUMMINS SHALL MAKE EVERY COMMERCIALLY REASONABLE <br />EFFORT TO MEET THE DELIVERY, SERVICE OR COMPLETION OBLIGATIONS SET FORTH HEREIN, SUCH DATES ARE <br />SUBJECT TO CHANGE. <br />INTERNATIONAL BUILDING CODE (IBC) CERTIFICATION <br />The products in this quotation identified as meeting the requirements of the 2009 IBC have been certified by their respective <br />manufactures via a combination of analytical testing and shaker table testing. Not all products have been shaker table tested. <br />OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT (OSHPD) <br />OSHPD seismic requirements are continuing to evolve. Please contact Cummins for the most current requirements for meeting <br />OSHPD applications. <br />SELECTIVE COORDINATION FOR NATIONAL ELECTRIC CODE (NEC) ARTICLE 700 AND 701 LOADS <br />Cummins generators are equipped with the manufacturer's recommended circuit breaker. Information regarding this device can be <br />supplied upon request. This quotation is not valid if any changes to this circuit breaker(s) is required to coordinate with other devices in <br />the electrical distribution system If changes are required, the customer must provide a copy of the coordination study listing the <br />manufacturers part number of the disconnect device to be supplied with the generator and a revised quotation will be issued. <br />TRANSFER SWITCH WITHSTAND AND CLOSE RATINGS <br />Transfer switch(es), if included in this quotation, require a withstand and closing rating (WCR) capable of meeting the available <br />upstream fault current (kAIC). The WCR may be based on a specific breaker rating or a time -based rating, and it is the responsibility of <br />a qualified facility designer or engineer to verify compatibility. In the event that the proposed transfer switch(es) are not compatible, the <br />transfer switch(es) will need to be re -quoted to ensure compatibility. A full listing of the WCR can be provided upon request and will be <br />included as part of the submittal package. <br />CUMMINS STANDARD EXCLUSIONS <br />Exhaust System <br />All off -engine piping, hangers, flanges, gaskets, bolts, insulation, other materials and labor to install. <br />Fuel System <br />All fuel piping and materials not limited to; supply, return, venting, valves, coolers, filters, pumps, fittings, primary fuel regulator, storage <br />tank & senders, external to genset package. All fuel for testing and initial fill. Fuel tank vent extensions and flame arrestors unless <br />specifically listed in the Bill of Materials. <br />Cooling System <br />Intake louvers, exhaust louvers, air dampers, sheet metal ducting, flex adapters, sound <br />attenuators/baffles. All off engine piping, flexible connections, labor and coolant for remote cooling systems. <br />Electrical <br />All off -engine wiring, field terminations of wiring, and lugs other than those detailed in our submittal Mounting <br />Mounting bolts and anchors. Vibration isolators (if included) may be shipped loose for installation at the jobsite by others. Seismic <br />engineering calculations. <br />Electrical Testing <br />Not limited to International Electrical Testing Association (NETA), infrared scanning, harmonic content or other independent agency <br />testing of switchgear, switchboards, protective relays, circuit breaker, electrical coordination studies, arc flash studies and reactive load <br />site testing. <br />Environmental Testing <br />Quotation: Q-154012-20230131-0959 <br />