Sales and
<br />Service
<br />Project: City of Everett Public Works, 1000kW
<br />Quotation: Q-154012-20230131-0959
<br />4
<br />Delivery to site, offloading by others
<br />1
<br />5
<br />Generator batteries, Group 8D
<br />2
<br />6
<br />Start up with 2 hour load test
<br />1
<br />7
<br />Sourcewell Contract #092222-CMM
<br />1
<br />TOTAL: $ 280,152.00
<br />Quote value does not include any tax.
<br />EXCEPTIONS AND CLARIFICATIONS:
<br />No specifications or drawings provided or reviewed for this proposal.
<br />COVID 19 SUPPLEMENTAL STATEMENT
<br />AS A RESULT OF THE OUTBREAK OF THE DISEASE COVID-19 ARISING FROM THE NOVEL CORONAVIRUS, TEMPORARY
<br />DELAYS IN DELIVERY, LABOUR OR SERVICES FROM CUMMINS AND ITS SUB -SUPPLIERS OR SUBCONTRACTORS MAY
<br />OCCUR. AMONG OTHER FACTORS, CUMMINS' DELIVERY OBLIGATIONS ARE SUBJECT TO CORRECT AND PUNCTUAL
<br />SUPPLY FROM OUR SUB -SUPPLIERS OR SUBCONTRACTORS, AND CUMMINS RESERVES THE RIGHT TO MAKE PARTIAL
<br />DELIVERIES OR MODIFY ITS LABOUR OR SERVICE WHILE CUMMINS SHALL MAKE EVERY COMMERCIALLY REASONABLE
<br />EFFORT TO MEET THE DELIVERY, SERVICE OR COMPLETION OBLIGATIONS SET FORTH HEREIN, SUCH DATES ARE
<br />SUBJECT TO CHANGE.
<br />INTERNATIONAL BUILDING CODE (IBC) CERTIFICATION
<br />The products in this quotation identified as meeting the requirements of the 2009 IBC have been certified by their respective
<br />manufactures via a combination of analytical testing and shaker table testing. Not all products have been shaker table tested.
<br />OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT (OSHPD)
<br />OSHPD seismic requirements are continuing to evolve. Please contact Cummins for the most current requirements for meeting
<br />OSHPD applications.
<br />SELECTIVE COORDINATION FOR NATIONAL ELECTRIC CODE (NEC) ARTICLE 700 AND 701 LOADS
<br />Cummins generators are equipped with the manufacturer's recommended circuit breaker. Information regarding this device can be
<br />supplied upon request. This quotation is not valid if any changes to this circuit breaker(s) is required to coordinate with other devices in
<br />the electrical distribution system If changes are required, the customer must provide a copy of the coordination study listing the
<br />manufacturers part number of the disconnect device to be supplied with the generator and a revised quotation will be issued.
<br />TRANSFER SWITCH WITHSTAND AND CLOSE RATINGS
<br />Transfer switch(es), if included in this quotation, require a withstand and closing rating (WCR) capable of meeting the available
<br />upstream fault current (kAIC). The WCR may be based on a specific breaker rating or a time -based rating, and it is the responsibility of
<br />a qualified facility designer or engineer to verify compatibility. In the event that the proposed transfer switch(es) are not compatible, the
<br />transfer switch(es) will need to be re -quoted to ensure compatibility. A full listing of the WCR can be provided upon request and will be
<br />included as part of the submittal package.
<br />CUMMINS STANDARD EXCLUSIONS
<br />Exhaust System
<br />All off -engine piping, hangers, flanges, gaskets, bolts, insulation, other materials and labor to install.
<br />Fuel System
<br />All fuel piping and materials not limited to; supply, return, venting, valves, coolers, filters, pumps, fittings, primary fuel regulator, storage
<br />tank & senders, external to genset package. All fuel for testing and initial fill. Fuel tank vent extensions and flame arrestors unless
<br />specifically listed in the Bill of Materials.
<br />Cooling System
<br />Intake louvers, exhaust louvers, air dampers, sheet metal ducting, flex adapters, sound
<br />attenuators/baffles. All off engine piping, flexible connections, labor and coolant for remote cooling systems.
<br />Electrical
<br />All off -engine wiring, field terminations of wiring, and lugs other than those detailed in our submittal Mounting
<br />Mounting bolts and anchors. Vibration isolators (if included) may be shipped loose for installation at the jobsite by others. Seismic
<br />engineering calculations.
<br />Electrical Testing
<br />Not limited to International Electrical Testing Association (NETA), infrared scanning, harmonic content or other independent agency
<br />testing of switchgear, switchboards, protective relays, circuit breaker, electrical coordination studies, arc flash studies and reactive load
<br />site testing.
<br />Environmental Testing
<br />Quotation: Q-154012-20230131-0959
<br />
|