My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/04/26 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/04/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2023 8:30:04 AM
Creation date
4/27/2023 11:38:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sales and <br />Service <br />Project: City of Everett Public Works, 1000kW <br />Quotation: 0-154012-20230131-0959 <br />Environmental Protection Agency (EPA), local air quality district or other Authority Having Jurisdiction <br />(AHJ), including acoustical. <br />Programming <br />All protective relay settings, breaker settings, PLC programming or other user configurable device programming. <br />Documentation <br />Electronic submittals and operation and maintenance manuals will be provided. Printed copies are available upon request, additional <br />charges may apply <br />Miscellaneous <br />Site specific labeling. Exhaust backpressure, airflow restriction or vibration analysis <br />Design <br />Cummins is not responsible for system design or engineering and does not guarantee system performance standards. Cummins will <br />supply documentation and reasonable assistance to others responsible for system engineering, design and performance. <br />Taxes and Permit <br />Any applicable sales tax, permits, fees, licenses. <br />Bonds <br />Any bid bond, payment or performance bond or other type of bond. <br />All items listed above are excluded and will only be supplied by Cummins if agreed upon, in writing, by a sales representative <br />for Cummins. <br />LEAD TIME: <br />Submittals <br />Typical submittal lead time is 2 - 3 weeks after receipt of purchase order. <br />Equipment <br />Current lead-time is 80 weeks after submittal approval and release for production. <br />Please feel free to contact me if you require any additional information; or if you have any further questions or concerns that I may be of <br />assistance with. <br />Thank you for choosing Cummins. <br />Submitted by: <br />Zach Schulte, Territory Manager <br />zach.t.schulteacummins.com <br />(206) 794-9801 <br />SUBMITTALS. An order for the equipment covered by this quotation will be accepted on a hold for release basis. Your order will not be <br />released and scheduled for production until written approval to proceed is received in our office. Such submittal approval shall <br />constitute acceptance of the terms and conditions of this quotation unless the parties otherwise agree in writing. <br />THERE ARE ADDITIONAL CONTRACT TERMS AND CONDITIONS ATTACHED TO THIS QUOTATION, INCLUDING LIMITATIONS <br />OF WARRANTIES AND LIABILITIES, WHICH ARE EXPRESSLY INCORPORATED HEREIN. BY ACCEPTING THIS QUOTATION, <br />CUSTOMER ACKNOWLEDGES THAT THE CONTRACT TERMS AND CONDITIONS HAVE BEEN READ, FULLY UNDERSTOOD <br />AND ACCEPTED. <br />Authorized Signature Date <br />Company Name <br />Printed Name & Title <br />Quotation: 0-154012-20230131-0959 <br />
The URL can be used to link to this page
Your browser does not support the video tag.