Laserfiche WebLink
1 <br /> 2 <br /> 3 CNH 8-22.DOCX <br /> 4 8-22 PAVEMENT MARKING <br /> 5 <br /> 6 8-22.2 Materials <br /> 7 <br /> 8 Section 8-22.2 is supplemented with the following: <br /> 9 <br /> 10 (******) <br /> 11 All plastic marking shall be Type D. <br /> 12 <br /> 13 8-22.3 Construction Requirements <br /> 14 <br /> 15 Section 8-22.3 is supplemented with the following: <br /> 16 <br /> 17 (******) <br /> 18 Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br /> 19 Specifications with the following modifications: <br /> 20 <br /> 21 1. All Stop Line shall be 24" wide Type D extruded plastic flat line. Spray Type D is <br /> 22 not allowed. <br /> 23 2. All Crosswalk Line shall be solid white lines, 24"wide, installed in accordance with <br /> 24 City of Everett Standard Drawing No. 721 and shall be Type D extruded plastic <br /> 25 flat line. Spray Type D is not allowed. <br /> 26 3. All two-way left turn yellow lines and lane lines dividing two opposing directions of <br /> 27 travel shall be Type D plastic flat line. <br /> 28 4. Profiled plastic Type D material, where called for in the Appendices to the Special <br /> 29 Provisions and Plans. <br /> 30 5. All white parking lines shall be paint line. <br /> 31 6. All dotted extension line shall be Type D plastic flat line. <br /> 32 7. Access parking space symbols, arrows, letters, bicycle lane symbols, and <br /> 33 sharrows shall be Type D extruded plastic flat line. Spray Type D is not allowed. <br /> 34 <br /> 35 8-22.3(1) Preliminary Spotting <br /> 36 <br /> 37 Section 8-22.3(1) is supplemented with the following: <br /> 38 <br /> 39 (******) <br /> 40 Contractor Surveying — Roadway Striping and Channelization <br /> 41 <br /> 42 No survey control data or layout will be furnished by the Contracting Agency. <br /> 43 The Contractor shall be solely responsible for detailed documentation (records) <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 77 <br />