My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 spotted or shall perform the work. In the event a revision is required by the <br /> 2 Contracting Agency during field layout, either to correct errors in the notes or to <br /> 3 make minor revision noted in the ordinary progress of the work, field layout shall <br /> 4 be performed by the Contractor at the time. <br /> 5 All field layout and temporary pavement marking shall be completed during the <br /> 6 same shift as the striping is obliterated by grinding or paving unless otherwise <br /> 7 directed by the Engineer. <br /> 8 Permanent pavement marking shall not begin until the layout is approved by the <br /> 9 Contracting Agency. Such approval shall not relieve the Contractor of <br /> 10 responsibility for the accuracy of the field markings. <br /> 11 <br /> 12 Payment <br /> 13 All costs associated with layout of temporary striping shall be included in the <br /> 14 associated bid items for pavement marking and shall be full pay for all labor, <br /> 15 equipment, materials, and supervision utilized to perform the Work specified for <br /> 16 layout and preliminary spotting of pavement markings, including any <br /> 17 resurveying, checking, correction of errors, replacement of missing or damaged <br /> 18 markings, and coordination efforts. <br /> 19 <br /> 20 8-22.3(2) Preparation of Roadway Surfaces <br /> 21 Section 8-22.3(2) is supplemented with the following: <br /> 22 (******) Apply materials to new HMA that is sufficiently cured according to the <br /> 23 manufacturer's recommendation. Permanent paint marking material applied to new <br /> 24 HMA require a pavement cure period of at least 21 days. Permanent Type D marking <br /> 25 material applied to new HMA require a pavement cure period of at least 10 days. <br /> 26 <br /> 27 8-22.4 Measurement <br /> 28 Section 8-22.4 is supplemented read as follows: <br /> 29 (******)The measurement for"Plastic Sharrow" will be per each unit installed. <br /> 30 <br /> 31 The measurement of aerial survey marker and access parking space symbol will be per <br /> 32 each for each marker installed. <br /> 33 <br /> 34 The measurement for crosshatch markings used to delineate bicycle buffer areas will be <br /> 35 measured by the completed linear foot and paid as "Plastic Line", or "Plastic Wide Line" <br /> 36 based on the width installed. <br /> 37 <br /> 38 The measurement for"24" Plastic Crosswalk Line" and "Removing 24" Plastic Crosswalk <br /> 39 Line (Stop Bar)" will be per square foot. <br /> 40 <br /> 41 The measurement for"24" Plastic Stop Bar" will be per linear foot. <br /> 42 <br /> 43 8-22.5 Payment <br /> 44 Section 8-22.5 is supplemented read as follows: <br /> 45 (******) "Plastic Sharrow", per each. <br /> 46 "24" Plastic Crosswalk Line", per square foot. <br /> 47 "Removing 24" Plastic Crosswalk Line (Stop Bar)", per square foot. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.