My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 "24" Plastic Stop Bar", per linear foot. <br /> 2 CAC 8 22 BIKE PAVEMENT MARKING.docx <br /> 3 CAC 8-22 BIKE PAVEMENT MARKING.docx <br /> 4 8-22 PAVEMENT MARKING <br /> 5 (******) <br /> 6 <br /> 7 Section 8-22 of the Standard Specification is supplemented by the following: <br /> 8 <br /> 9 8-22.2 Materials <br /> 10 <br /> 11 All plastic marking shall be Type B or Type D plastic. Spray Type D is not allowed. <br /> 12 <br /> 13 Where called for in the plans, green color pavement markings shall meet the <br /> 14 requirements of MUTCD Interim Approval for Optional Use of Green Colored Pavement <br /> 15 for Bike Lanes, IA-14. The color shall be green and will comply with FHWA standards <br /> 16 for daytime and nighttime chromaticity values. <br /> 17 <br /> 18 a. The daytime chromaticity coordinates for the color used for green colored <br /> 19 pavement shall be as follows: <br /> 20 <br /> 1 2 3 4 <br /> x y x y x y x y <br /> 0.230 0.754 0.266 0.500 0.367 0.500 0.444 0.555 <br /> 21 <br /> 22 b. The daytime luminance factor (Y) shall be at least 7, but no more than 35. <br /> 23 <br /> 24 c. The nighttime chromaticity coordinates for the color used for <br /> 25 green colored pavement shall be as follows: <br /> 26 <br /> 1 2 3 4 <br /> x y x y x y x y <br /> 0.230 0.754 0.336 0.540 0.457 0.500 0.479 0.520 <br /> 27 <br /> 28 <br /> 29 8-22.3 Construction Requirements <br /> 30 <br /> 31 Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br /> 32 Specifications with the following modifications: <br /> 33 <br /> 34 1) All wide line and dotted extension line shall be Type D plastic flat line. <br /> 35 2) Access parking space symbols, arrows, letters, and speed hump symbols shall be <br /> 36 Type D extruded plastic flat line. Spray Type D is not allowed. <br /> 37 3) All plastic shared lane markings (sharrows) and plastic bicycle lane symbols shall <br /> 38 be Type B Pre-formed Fused Thermoplastic. <br /> 39 4) Green background for sharrows and plastic bicycle lane symbol, where indicated <br /> 40 in the plans, shall be Type B Pre-formed fused thermoplastic. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.