My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Contains any consecutive 6-minute period averaging greater than 20% opacity. <br /> (d) Section 9.04(c)(1) shall not apply to: <br /> (1) Glass furnaces that are tested annually for compliance with the applicable particulate <br /> emission standard in Section 9.09 of this regulation; or <br /> (2) Equipment with an alternate opacity standard issued under Section 3.03 or Article 6 of <br /> this regulation that is based upon a correlation with the particulate concentration and <br /> that accurately indicates a violation of the applicable particulate emission standards in <br /> Section 9.09 of this regulation. <br /> (e) This section shall not apply to sources controlled by a venturi scrubber, provided that: <br /> (1) The source is tested annually for compliance with the applicable particulate emission <br /> standard in Section 9.09 of this regulation; <br /> (2) The pressure drop across the scrubber is continuously monitored and recorded; and <br /> (3) The scrubbing liquid flow rate and temperature are continuously monitored and <br /> recorded. <br /> (f) This section shall not apply to fuel burning equipment that burns residual oil less than 31 days <br /> per year, provided that the source implements an alternate opacity monitoring plan issued <br /> under Section 3.03 or Article 6 of this regulation. <br /> SECTION 9.05 REFUSE BURNING Adopted 03/13/68(12) <br /> Revised 06/09/88(621),12/09/93(769) <br /> (a) It shall be unlawful for any person to cause or allow the burning of combustible refuse except <br /> in a multiple chamber incinerator provided with control equipment. <br /> (b) It shall be unlawful for any person to cause or allow the operation of refuse burning <br /> equipment any time other than daylight hours. <br /> SECTION 9.07 SULFUR DIOXIDE EMISSION STANDARD Adopted 03/13/68(12) <br /> Revised 07/08/70(126),02/21/74(230),02/13/86(597),06/09/88(621),04/14/94(784) <br /> It shall be unlawful for any person to cause or allow the emission of sulfur dioxide from any source <br /> in excess of 1,000 parts per million by volume on a dry basis, 1-hour average (corrected to 7%oxygen <br /> for fuel burning equipment and refuse burning equipment). <br />
The URL can be used to link to this page
Your browser does not support the video tag.