Laserfiche WebLink
1 and cover, striping, channelization*** and other work, all in accordance with the attached <br /> 2 Contract Plans, these Contract Provisions, and the Standard Specifications. <br /> 3 <br /> 4 1-013.RTF <br /> 5 1-01.3 Definitions <br /> 6 (January 19, 2022 APWA GSP) <br /> 7 <br /> 8 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 9 them with the following: <br /> 10 <br /> 11 Dates <br /> 12 Bid Opening Date <br /> 13 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> 14 Award Date <br /> 15 The date of the formal decision of the Contracting Agency to accept the lowest <br /> 16 responsible and responsive Bidder for the Work. <br /> 17 Contract Execution Date <br /> 18 The date the Contracting Agency officially binds the Agency to the Contract. <br /> 19 Notice to Proceed Date <br /> 20 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 21 Substantial Completion Date <br /> 22 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> 23 use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 24 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> 25 replacement of temporary substitute facilities, plant establishment periods, or <br /> 26 correction or repair remains for the Physical Completion of the total Contract. <br /> 27 Physical Completion Date <br /> 28 The day all of the Work is physically completed on the project. All documentation <br /> 29 required by the Contract and required by law does not necessarily need to be <br /> 30 furnished by the Contractor by this date. <br /> 31 Completion Date <br /> 32 The day all the Work specified in the Contract is completed and all the obligations of <br /> 33 the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> 34 required by the Contract and required by law must be furnished by the Contractor <br /> 35 before establishment of this date. <br /> 36 Final Acceptance Date <br /> 37 The date on which the Contracting Agency accepts the Work as complete. <br /> 38 <br /> 39 Supplement this Section with the following: <br /> 40 <br /> 41 All references in the Standard Specifications or WSDOT General Special Provisions, to <br /> 42 the terms "Department of Transportation", "Washington State Transportation <br /> 43 Commission", "Commission", "Secretary of Transportation", "Secretary", "Headquarters", <br /> 44 and "State Treasurer" shall be revised to read "Contracting Agency". <br /> 45 <br /> 46 All references to the terms "State" or"state" shall be revised to read "Contracting <br /> 47 Agency" unless the reference is to an administrative agency of the State of Washington, <br /> 48 a State statute or regulation, or the context reasonably indicates otherwise. <br /> 49 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 2 <br />