My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 All references to "State Materials Laboratory" shall be revised to read "Contracting <br /> 2 Agency designated location". <br /> 3 <br /> 4 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 5 Contracting Agency form(s) by which final payment is authorized, and final completion <br /> 6 and acceptance granted. <br /> 7 <br /> 8 Additive <br /> 9 A supplemental unit of work or group of bid items, identified separately in the Bid <br /> 10 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br /> 11 to the base bid. <br /> 12 <br /> 13 Alternate <br /> 14 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 15 Proposal, from which the Contracting Agency may make a choice between different <br /> 16 methods or material of construction for performing the same work. <br /> 17 <br /> 18 Business Day <br /> 19 A business day is any day from Monday through Friday except holidays as listed in <br /> 20 Section 1-08.5. <br /> 21 <br /> 22 Contract Bond <br /> 23 The definition in the Standard Specifications for"Contract Bond" applies to whatever <br /> 24 bond form(s) are required by the Contract Documents, which may be a combination of a <br /> 25 Payment Bond and a Performance Bond. <br /> 26 <br /> 27 Contract Documents <br /> 28 See definition for"Contract". <br /> 29 <br /> 30 Contract Time <br /> 31 The period of time established by the terms and conditions of the Contract within which <br /> 32 the Work must be physically completed. <br /> 33 <br /> 34 Notice of Award <br /> 35 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> 36 Contracting Agency's acceptance of the Bid Proposal. <br /> 37 <br /> 38 Notice to Proceed <br /> 39 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 40 and directing the Contractor to proceed with the Work and establishing the date on which <br /> 41 the Contract time begins. <br /> 42 <br /> 43 Traffic <br /> 44 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> 45 equestrian traffic. <br /> 46 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.