My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 2 bidder is the lowest responsible bidder. <br /> 3 <br /> 4 <br /> 5 1-03.GR1 <br /> 6 Award and Execution of Contract <br /> 7 <br /> 8 1-03.1.DOCX <br /> 9 1-03.1 Consideration of Bids <br /> 10 <br /> 11 1-03.1(1).RTF <br /> 12 1-03.1(1) Identical Bid Totals <br /> 13 (January 4, 2016 APWA GSP) <br /> 14 <br /> 15 Revise this section to read: <br /> 16 <br /> 17 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 18 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> 19 highest percentage of recycled materials in the Project, per the form submitted with the <br /> 20 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 21 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 22 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> 23 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 24 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> 25 alphabetic order by the name of the firm as registered with the Washington State <br /> 26 Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 27 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> 28 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 29 responsive Bid, and with a proposed recycled materials percentage that is exactly equal <br /> 30 to the highest proposed recycled materials amount, are eligible to draw. <br /> 31 <br /> 32 COE 1-03.3.RTF <br /> 33 1-03.3 Execution of Contract <br /> 34 (January 19, 2022 APWA GSP) <br /> 35 <br /> 36 Revise this section to read: <br /> 37 <br /> 38 Within 3 calendar days of Award date (not including Saturdays, Sundays and Holidays), <br /> 39 the successful Bidder shall provide the information necessary to execute the Contract to <br /> 40 the Contracting Agency. The Bidder shall send the contact information, including the full <br /> 41 name, email address, and phone number, for the authorized signer and bonding agent to <br /> 42 the Contracting Agency. <br /> 43 <br /> 44 Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> 45 available for signature by the successful bidder on the first business day following award. <br /> 46 The number of copies to be executed by the Contractor will be determined by the <br /> 47 Contracting Agency. <br /> 48 <br /> 49 Within 20 calendar days after the award date, the successful bidder shall return <br /> 50 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> 51 by Section 1-07.18, a satisfactory bond as required by law and Section 1-03.4, the <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.