Laserfiche WebLink
1 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 2 bidder is the lowest responsible bidder. <br /> 3 <br /> 4 <br /> 5 1-03.GR1 <br /> 6 Award and Execution of Contract <br /> 7 <br /> 8 1-03.1.DOCX <br /> 9 1-03.1 Consideration of Bids <br /> 10 <br /> 11 1-03.1(1).RTF <br /> 12 1-03.1(1) Identical Bid Totals <br /> 13 (January 4, 2016 APWA GSP) <br /> 14 <br /> 15 Revise this section to read: <br /> 16 <br /> 17 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 18 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> 19 highest percentage of recycled materials in the Project, per the form submitted with the <br /> 20 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 21 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 22 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> 23 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 24 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> 25 alphabetic order by the name of the firm as registered with the Washington State <br /> 26 Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 27 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> 28 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 29 responsive Bid, and with a proposed recycled materials percentage that is exactly equal <br /> 30 to the highest proposed recycled materials amount, are eligible to draw. <br /> 31 <br /> 32 COE 1-03.3.RTF <br /> 33 1-03.3 Execution of Contract <br /> 34 (January 19, 2022 APWA GSP) <br /> 35 <br /> 36 Revise this section to read: <br /> 37 <br /> 38 Within 3 calendar days of Award date (not including Saturdays, Sundays and Holidays), <br /> 39 the successful Bidder shall provide the information necessary to execute the Contract to <br /> 40 the Contracting Agency. The Bidder shall send the contact information, including the full <br /> 41 name, email address, and phone number, for the authorized signer and bonding agent to <br /> 42 the Contracting Agency. <br /> 43 <br /> 44 Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> 45 available for signature by the successful bidder on the first business day following award. <br /> 46 The number of copies to be executed by the Contractor will be determined by the <br /> 47 Contracting Agency. <br /> 48 <br /> 49 Within 20 calendar days after the award date, the successful bidder shall return <br /> 50 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> 51 by Section 1-07.18, a satisfactory bond as required by law and Section 1-03.4, the <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 9 <br />